Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:43pm On Apr 11, 2025*. Modified: 12:14pm On Apr 12, 2025 |
Ibadan 3 floors mini shopping/office complex is in progress
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 2:30pm On Apr 11, 2025*. Modified: 3:45pm On Apr 11, 2025 |
Pop still in progress here
Watch out for our Ibadan ongoing project pics
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 5:58am On Apr 10, 2025 |
More pics |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 5:54am On Apr 10, 2025 |
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 5:56pm On Apr 09, 2025*. Modified: 5:56am On Apr 10, 2025 |
4th building upper floor is in progress
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 5:52pm On Apr 09, 2025 |
Still in progress
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 8:52am On Apr 09, 2025 |
Wall screeding is in progress here
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:15am On Apr 05, 2025 |
Wkd tips about roofing wood.
If you need real complete wood size and how to save money its advisable to buy full 2*6 or 2*8 plank then saw it to your desired size, you will thank me later. Wood seller don’t come for me oo, if you come I will not respond. Lolz |
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 9:11am On Apr 05, 2025 |
We are your sure plug |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 9:10am On Apr 05, 2025 |
Watch out for more pics here |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 9:10am On Apr 05, 2025 |
4th building upper section block work about to commence |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:27am On Apr 03, 2025 |
I want to ask real pop guru in the house ( not 3rd party pop installer ) How do you guys think you can reduced excessive wastage of pop cement and fillas while installing pop ceiling. I observed that ready made imported board reduces wastage but what about casting on site type? |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 6:16pm On Apr 01, 2025 |
Finishing still ongoing on the 3rd building. Tiling about to start
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:57pm On Apr 01, 2025 |
THUMBS RULE … do you know that length of beam in feet determined the depth in inches.
BUT it’s strongly advisable to follow your structural drawing designed by qualified structural Engr. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:03am On Mar 31, 2025*. Modified: 1:18pm On Apr 05, 2025 |
Contingency cost in construction is very vital if you don’t want your project to be an abandoned one, either you are a home owner or contractor/ Engr.
Contingency is a predetermined sum of money allocated to cover potential risks or changes in the project scope that are not known in advance. Added to an estimate for contingency reasons, contingency funds are intended to pay for unanticipated costs that may arise during the project lifecycle. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:02am On Mar 31, 2025*. Modified: 9:17am On Mar 31, 2025 |
Did you also know that any building that is above a story building in Lagos requires soil test ? No matter the type of soil
Have it in your mind that you are spending about 2-5% of the total cost of construction for permit.
Also about 5-10% of the total cost of construction will go for overhead and profit for your construction handler e.g builder |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:59am On Mar 31, 2025 |
Did you know that 90-95pec building that is above six stories building required pile foundation no matter the type of soil. |
Properties › Re: Construction Of Contemporary Eatery (fast food)And 6 Flats By Rotech77 by rotecch77(op): 8:56am On Mar 31, 2025 |
Call on us |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 8:55am On Mar 31, 2025 |
Watch out for more |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 8:54am On Mar 31, 2025 |
New week new deal |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:24am On Mar 30, 2025 |
Happy Eil-dil-fitri to all the Muslim here and to all our clients, followers, etc |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 2:57pm On Mar 27, 2025*. Modified: 8:22am On Mar 30, 2025 |
Ayohbk: Hello All, Thanks for your feedbacks. after several back and forth these are the costs paid and work have started already. Just dropping the information for anyone else who might need it.
Omo on Ile #1,350,000 Safety Commission. #200,0000 Town Planning Office. #200,000 These were paid Last weeks Then Labca were paid 1.3m. Tried to beat it down but they didn't agree. Even after the 1.3m they gave conditions that we should finish the work quick before they move their oga. Else we'll have to pay another Money if we stop and restart some other time.
Nigeria was really a country.
Thanks for your inputs. Cc diordaves acmebuilding Billions123 gabbytabby kopell and everyone else It’s good as you repotted back,people will learn one or two things from this, more so Materials Testing personal might show up oo |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:16pm On Mar 25, 2025*. Modified: 7:55pm On Mar 25, 2025 |
inze: . . . most likely.
Most of these fancy mixers are meant to run with a pressure pump as they have smaller inners for water flow. A client had similar experience and it's solution is getting quality "full-open" mixers n faucets. Usually don't come so fancy though but gets the job done. You can browse through Sweet-home product in your locality (not an advert) they mostly come in knobs-style open and close
@rotech would remember this also  Yes, I can remember the scenario then, you are 100% right with the way you explained those faucets/ taps Reason why it’s good to use full inner gauge gate valve for central toilet control to allow full pressure water supply into toilet and kitchen. Only that to get good quality now is very scarce,, instead we used stop cock mostly now and this doesn’t allow full water passage at a go. Pics 1, stop cock Pics 2 gate valve
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 11:47am On Mar 25, 2025 |
More pics from our ongoing project |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:45am On Mar 25, 2025 |
Our Ibadan project is also in progress
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:44am On Mar 25, 2025 |
Almost done with pop ceiling work here. Tiling and some wall screeding loading Watch out for more
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 11:38am On Mar 24, 2025 |
Still on the finishing aspect |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:36am On Mar 24, 2025 |
kopell: Please let gard people with right information. Every building as different history. If you see me write anything here is from my personal experience NOT them say I did it. I just finished one of his similar case I build the house in 94 with every government approve. Chose to renovate 2 years ago just like everyone else, government official show up asking for renovating permit, don't have one I thought its was a joke fast forward continue work. they can back few weeks later with stop work Order. As stubborn man I call my connection at the top in Alausa. He told me I should know better their are process I have to follow before I start now. He sent me back to the local branch, to continue the process. When they sent me the requirements I look at it as waste of resources on the old house I chose to bring down the house, that when the drama start all over, all those requirements which I follow through. I couldn't believe this people have so much time to come for inspection, from set back, checking if what we have on drawing is what we are building as we progress, on the project even till the roofing stange. So please if they don't come for you, don't think the dont work . You may just be lucky. If they caught you at the middle, trust me you will pay all those fees Baba you will not die untimely death, If we tell them they will say those Engr has come again with dubious way of supporting where they will see money to chop. What you said is 100% on point unless if you build in hidden area and they didn’t notice on time, once they notice it they will still serve you letter.. Even demolition has permit, let alone full renovation work. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:14am On Mar 24, 2025 |
Did you know that cost of electrical work in a construction project typically falls within a range of 3% -10% of the total project cost( this covered materials, labour, overhead charges) , depending on factors like project complexity, material choices, and location |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:59pm On Mar 23, 2025*. Modified: 5:41pm On Mar 23, 2025 |
FACTORS THAT INFLUENCE LABOR COST/RATIO
Several external and internal factors can impact labor ratios:
Project Complexity: Complex projects often require specialized labor, increasing costs.
Geographic Location: Regions with higher living costs typically see increased wages.
Market Conditions: Labor shortages or high demand can drive wages up further.
Project Type: Residential, commercial, and industrial projects differ in labor demands.
Technology Adoption: Automation and prefabrication can improve productivity, reducing labor ratios over time. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:03pm On Mar 23, 2025 |
kopell: Some of us care ooo. I will soon take front seat in your lecture room. Ramada Kareem, to all our muslims brothers and sister. Thanks baba agbalagba I will surely post it bit by bit |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 5:30am On Mar 23, 2025 |
Did you know that materials covered about 65-75pec of total cost of construction ?
This is for educational purposes only for who care to know
Watch out for more tips |