Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 9:35pm On Jun 13, 2025 |
rmx: Hello engineer
You gave a range of percentage of builders fee to total cost of project , can’t find the post . Pls redirect me or repost , thanks Contingency cost in construction is very vital if you don’t want your project to be an abandoned one, either you are a home owner or contractor/ Engr. Contingency is a predetermined sum of money allocated to cover potential risks or changes in the project scope that are not known in advance. Added to an estimate for contingency reasons, contingency funds are intended to pay for unanticipated costs that may arise during the project lifecycle. Also Have it in your mind that you are spending about 2-5% of the total cost of construction for permit. Also about 5-10% of the total cost of construction will go for overhead and profit for your construction handler e.g builder |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 9:00pm On Jun 13, 2025 |
Update loading, 4th building finishing stage I.e plastering, windows , doors , etc |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 8:57pm On Jun 13, 2025 |
rmx: Hello engineer
You gave a range of percentage of builders fee to total cost of project , can’t find the post . Pls redirect me or repost , thanks Good evening sir, ok I will search for it and send |
Culture › Re: Okosi Festival 2025 In Makun Omi was fantastic: See Interesting Pictures by rotecch77(m): 10:24pm On Jun 02, 2025 |
Dashlish: Omo! Kazeem All-Rounder That Year For Ajah-Ilaje Inter Ethnic Fight That Time. Now, GuyMan Don Become 'King' For His Papa Hometown. Mehn! Gone Are Those Days You know person my guy ! |
Culture › Re: Okosi Festival 2025 In Makun Omi was fantastic: See Interesting Pictures by rotecch77(m): 10:23pm On Jun 02, 2025 |
dontbothermuch: Vocabulary has failed me in describing the people of Ogun Waterside. Such wonderful & lovely people with great hospitality. I served at Tigara community in Ogun Waterside 2008. Moving from Abigi local govt secretariat to Ibiade to Ilushin to rubber plantation. So much love & care between I & the indigenes that emotions were high on the final day of departure. One of my happiest days were times in Ogun Waterside. My bio wouldn't be complete without Ogun Waterside. Much Love from Rivers State. You sabi the place true true |
Properties › Re: Free Leakage Test On Any Building Both Old And Ongoing Project By Rotecch77 by rotecch77(op): 10:51am On May 31, 2025 |
We are available to help you out on this |
Properties › Re: Biogas/bio Toilet And Bio-digester Toilet System By Rotech77 by rotecch77(op): 10:50am On May 31, 2025 |
still much available |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 9:25am On May 24, 2025 |
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 7:43pm On May 22, 2025 |
AngelicBeing: Hmmmmmmm 🤔 Yes. Oo. In other news our Ibadan shopping complex is in progress
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 10:34am On May 22, 2025 |
Watch out |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:23am On May 22, 2025 |
Our Ibadan 3 floors shopping complex still in progress
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 10:20am On May 22, 2025 |
More
|
Properties › Re: Post your mechanical(plumbing)problem here and get quick solution to it . by rotecch77(op): 10:18am On May 22, 2025 |
solutionboy: Please how can one eliminate air in pipes especially when the reservoir in the over head tank runs out as a result of a prolonged power outage and you have to pump again when power is finally restored. I live on the ground floor of a storey building and it takes a lot of time before water starts gushing out from my apartment taps even when its obvious that the tank is half full. If the problem is not severe, do open all your bathroom taps while pumping the water to allow the air lock free. If the problem continues see your plumber for throughly checking |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 4:24pm On May 10, 2025 |
Happy wkd to all our clients and followers |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 4:23pm On May 10, 2025 |
Finishing work loading I.e plastering, pop, windows and doors etc |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 7:00pm On May 06, 2025 |
More
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 7:10pm On May 04, 2025 |
Happy wkd to you all |
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 2:46pm On May 03, 2025 |
More loading |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 8:09pm On May 02, 2025 |
More
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 7:43pm On May 02, 2025 |
Roof covering with full guage 0.55 Aluminum sheet done
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 12:57pm On Apr 26, 2025*. Modified: 3:39pm On Apr 26, 2025 |
….Go and verify it, then call us for deal
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 12:54pm On Apr 26, 2025 |
4th building upper floor block work at conclusion stage
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 10:11am On Apr 23, 2025*. Modified: 12:01pm On Apr 23, 2025 |
Done with the screeding now
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 9:41am On Apr 18, 2025 |
More pics update
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:51pm On Apr 17, 2025 |
Beframia: @ rotechh77, I know you have expertise in this area. I have also been to a place where the surroundings smell after flushing the toilet and odors also emanate from the kitchen sink and wash hand basins. What could be the cause and what's the remedy? Am just seeing this now. The problem is from either 1,. No adequate vent in all the toilets and the septic tank 2. Soil pipe and waste pipe link together 3. Chambers not well separated 4. Check for any possible leakages around your soil pipe If all these are ok then you need to consult your village people lolz |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:37pm On Apr 16, 2025 |
gabbytabby: Na so I see am. I would usually buy half of materials to start.
The last job he did for me I decided what I was going to buy material wise and gave the person who introduced him to me to buy na real area father and we are storing materials with him. Sometimes you gat to let somethings go. It came it at 495k materials and Labour, supervision and area boys self.
They don’t know that is not usual with me. Here I have storage space so will just get maintenance supervisor to source materials and call them that I am ready to paint. Materials 950k Labour 750k That is reap off, |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 5:26pm On Apr 16, 2025 |
gabbytabby: Them need visa. I call painter him dey give me 750k for Labour him call am workmanship na so I run oh. The way them they drop price no small project anymore.
Na awa fake life, borrow to subsidise petrol not health, not education cause am. With PBAT there is light at the end of the tunnel. Wetin I dey see 750k Abi eyes dey pain me nii. This is outrageous. |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 11:09am On Apr 16, 2025*. Modified: 11:28am On Apr 16, 2025 |
More
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:07am On Apr 16, 2025 |
Our work speaks for us. almost done with the screeding here
|
Properties › Re: Construction Of Royal Hall And Mega Eatery By Arbo Contractor Ltd by rotecch77(op): 12:27pm On Apr 15, 2025 |
Watch out for more pics update |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 12:26pm On Apr 15, 2025 |
Still cooking |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 12:13pm On Apr 12, 2025 |
|