The 188-megawatt Geometric Power plant in the Osisioma Industrial Layout in Aba, Abia State, will start to generate electricity within two months, according to the Geometric Power group chairman, Professor Bart Nnaji, who is also a former Minister of Power. Starting with one of its four General Electric brand turbines, the second will come on stream once the performance of the first turbine is declared satisfactory by the team of engineers led by KSE Energy of Turkey and Engineer Ben Caven, a former executive director of the National Electric Power Authority (NEPA) reputed to be the only person to have run the generation, engineering and transmission divisions of the state-owned utility. “The generation of electicity from the Geometric Power plant will be a game changer in the socioeconomic development of not just Aba city but nine out of the 17 local government areas in Abia State serviced by Aba Power, a member of Geometric group”, Nnaji declared today to wildly cheering participants at the First African Continental Free Trade Area (AfCFTA) Market Opportunities Conference holding at the Technology Incubation Centre in Aba, organised by the Continental Export Import (CONEX) Ltd. “We have completed building four brand new power substations and refurbishing three substations inherited from the Power Holding Company of Nigeria (PHCN), in addition to providing thousands of kilometres of cables and wires, as well as world-class tubular poles available in only highly industrialised cities such as Tokyo in Japan and San Francisco in California. “All that remains now is to provide fuel or gas to the Geometric Power plant through the 27-kilometre gas pipeline from Owaza in Ukwa West LGA in Abia State to the Osisioma Industrial Layout on the Aba outskirts. “Oilserv, Nigeria’s foremost indigenous gas pipeline builder, is doing a good job”. Professor Nnaji, also a former Minister of Science and Technology who held the title of Distinguished Professor of Engineering in the United States, disclosed that though work has been completed on the seven substations, thousands of kms of wires as well as tubular poles, the power infrastructure will be put in use only when the Geometric Power plant becomes operational. Th plant commissioning, he added, would bring about a dramatic improvement in not power supply but also its quality. The Aba Integrated Power Project, he continued, “is the only electricity company in Nigeria that generates and also distributes power”. He disclosed that he chose to cite Geometric Power to catalyse Aba’s development as the headquarters of indigenous technology and manufacturing, noting that with “constant, quality and affordable electricity soon, the cost of doing business in Abia State will reduce significantly and this will, in turn, impact on the national economy”. Read also: Gov demands audit on abysmal performance of Ibom Power He advised Aba business people to embrace the African Continental Free Trade Area, as it will elminate multiple taxes by various local and state governments as well as the Federal Government. Nigeria has signed the agreement and ratified it, thus attaining the status of a state party whose goods and services can be exported to other African countries with relative ease. Nnaji commended Aba businesses for excelling in textiles, leather products and metals which need large export markets. Other participants in the two-day conference which will end tomorrow include the Nigerian Export Promotion Council, the Nigerian Shippers Council, United Bank for Africa, and the African Export Import Bank (AFREXIM Bank). https://businessday.ng/energy/power/article/geometrics-24-hours-power-supply-for-aba-to-start-within-2-months-says-prof-nnaji/ |
Ttipsy:That's the old name anyways, the new name is Eziukwu market road. We are just use to that old name |
EngrKemp:Julius Berger will handle obohia road. Alternatives need to be created before handling major construction works |
Iamgrey5:If Tinubu didn't rig the election and INEC had done the right thing, no one would be attacking Tinubu. We are telling the world exactly the way it is and we are a formidable opposition. You can't stop us from talking and you guys aren't seen anything yet |
Is it alps Peter Obi's fault thay Tinubu removed subsidy without fixing one refinery? |
Penguin2:The contract for port Harcourt road has already been given to Julius berger. Julius Beger will also construct Obohia road. |
Otti Visted this road on thr 6th of July and on the 26th of July, the road has gotten to this level. Person wey Wan work go work, no excuses
|
Rehabilitation work going on on Aba/Owerri road. This is a palliative measure to ease traffic on thay road. The road will soon be totally rehabilitated because it's an important entry point for those coming from Enugu, Owerri, Lagos, Onitsha and Umuahia. You will observe that they are not just covering pot holes, they are desilting and opening up the drainages.
|
Rossikk:most of the roads being constructed now are inner roads that will serve as alternatives for cummuters when the major road works commences. The major roads in Aba will be enlarged with pedestrian walkways but he needs to created alternative first to ease traffic. The only major road here is cementary road and you can see that it's has covered drianges with pedestrian walkway. |
onyidon21:the picture you posted is Umuahia though |
onyidon21:Demolitions might occur when he starts working on Aba/Owerri road. It's going to be enlarged. |
This is Shalom road, the road is going to serve as an alternative for motorists when major construction work begins on Aba/Owerri road. Aba/Owerri is most likely going to be enlarged into a 6 lanes road.
|
paramakina202:that land is just wasting. He's not building anything there. Very useless people |
gebest:government wey Wan work go work. |
Marking has started on Mission hill road, leading from Abia tower in Ossah, Enugu/Port harcourt expressway to Opara square. This road is the entry point into umuahia city and a major route for travellers who are going to Akwa Ibom and crossriver. I will keep you updated on this road
|
BiafraAburi:the contract has been awarded to Julius berger |
youngrichnigga:no they are not. Government didn't provide good waste management system. Where do you expect them to dispose their waste? |
jaephoenix:yes, if you explain how it fits and aliens does not. I will answer |
jaephoenix:Because your question does not make sense to me. It has to make sense to me before I answer it |
jaephoenix:Your question won't make sense to me until you explain it |
LOVEALAIGBO:we will get there |
MXrep:I heard Alex otti talking about flyovers sometime ago, but I am not sure where he wants to build them in Umuahia. He said he will build about 5 in Aba |
LOVEALAIGBO:yes, little my little. The tasking is huge but we are off to a great start |
Abia tower in Ossah to Opara square is Umuahia will be made 6 lanes. This road is the major entrance to the capital city from Enugu/Port harcourt expressway. It needs to be very wide. Contractors have already been mobilized to site very and marking the road has already started. I will keep you posted on that |
Yes, Road closed. Otti fixing Green Avenue, Aba.
|
Emelogu road is also receiving attention. This road is key because it's the road linking Opobo raod to ngwa road, two major roads in Aba.
|
Construction is also going on along college road in Aba, just in 3 weeks. How are they this fast?
|
Ngwa road, Aba is a construct site now 😭 We waited so patiently for this moment
|
Udeagbala road, just in 3 weeks. The speed is what impresses me. We have a lot of work to do still.
|
Shalom road, off Umueze road Aba is almost complete. Just in 3 weeks. Person wey Wan work go work abeg
|
The good thing about these roads is that, he's contracting them to renown contractors. Julius Beger and CCECC
|
Old express by Tonimas is almost done. Handled by CCECC.
|