Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,195,573 members, 7,958,779 topics. Date: Wednesday, 25 September 2024 at 11:48 PM |
Nairaland Forum / Nairaland / General / Properties / Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 (11309 Views)
How Much Will A 5 Bedroom Duplex Cost? / Can I Build A 5-bed Room Bungalow In Half Plot Of Land / Construction Of Six Bedroom Duplex At Enugu (2) (3) (4)
(1) (2) (3) (4) (Reply) (Go Down)
Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 7:05am On May 23, 2016 |
Pictures showing Carpentry, Plumbing, Electrical Piping and Iron works on the Suspended slab... http://www.sharpedgedesignltd.com/ |
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 8:07am On May 23, 2016 |
Pictures showing the Casting of the Suspended Slab and also the Vibrating of the Beams...http://www.sharpedgedesignltd.com/ 1 Like 1 Share
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 9:59am On May 23, 2016 |
Pictures showing Block Setting on the first floor...http://www.sharpedgedesignltd.com/
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 10:10am On May 23, 2016 |
Pictures showing Carpentry works for Lintels and Beams on the first floor...http://www.sharpedgedesignltd.com/ 1 Share
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 10:15am On May 23, 2016 |
Pictures showing ongoing Casting of Lintels, Columns and Beams on the first floor...http://www.sharpedgedesignltd.com/ 1 Share
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by mavverick: 10:19am On May 23, 2016 |
Nice work OP I think the following would have been useful: * which area of Lekki ? * Some info on the terrain ? * Some info on the challenges faced and your solution ? * Cost/Estimate information. * Kind/height of foundation, was it dug or the blinding done at the ground level you met. Thanks. |
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 10:46pm On May 23, 2016 |
mavverick: Thanks for your questions... will respond to each one of them. The building is at Ikota... infact it's in Megamound Estate. Like is shown in the very first set of pics i shared, the terrain is largely swampy The major challenge faced on this project was the terrain because in spite of the swampy nature of the soil, we still had to dig to get to relatively solid ground upon which the foundation was laid. This challenge was however totally surmounted once we were done with the foundation. The other alternative would have been for us to sand fill and wait for some 2 years for the soil to compact well... unfortunately, our client did not have the luxury of time. Other challenges include the budget i.e we were constrained for cash from the start to the finish... i guess this is common with most clients. As for the cost estimate, i would rather not go into that now as every project is perculiar to itself... whatever estimates i put here might discourage some prospective client but that info you can get if u call or send a private msg to me. The height of the foundation for this project is 1.8metres and we dug to hit solid ground... Thanks a million for your questions... really appreciate u 2 Likes |
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by phocuyelu: 11:00pm On May 23, 2016 |
architectB: Thanks for the update but I think most people are more interested in the cost breakdown/estimates and maybe basic challenges and lessons from the project. Like you rightly said, each project with its peculiarity but just posting pictures showing various levels of construction is common here already. 2 Likes |
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 11:48pm On May 23, 2016 |
phocuyelu: Your advice is well noted and really appreciated; will definitely work on it and probably come up with innovative ways of sharing cost estimates as it were... Thanks a lot |
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 11:57pm On May 23, 2016 |
Pictures showing Beams and Lintels after casting... http://www.sharpedgedesignltd.com/
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 12:02am On May 24, 2016 |
Pictures showing Concrete Fascia (Parapet)
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 9:41am On May 24, 2016 |
Pictures showing Carpentry works on Roof Carcass...http://www.sharpedgedesignltd.com/
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 9:47am On May 24, 2016 |
Pictures showing Roof Trusses i.e Rafters, Purlins, Tie Beams etc... http://www.sharpedgedesignltd.com/ 1 Share
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 9:55am On May 24, 2016 |
Pictures showing building at completion of Roofing... http://www.sharpedgedesignltd.com/ 1 Share
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 10:00pm On May 24, 2016 |
Pictures showing the Internal and External Plastering...
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 10:12pm On May 24, 2016 |
Pictures showing Building after External Plastering... 1 Like
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 12:11pm On May 25, 2016 |
Pictures showing POP Ceiling works... http://www.sharpedgedesignltd.com/ 1 Like
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 12:19pm On May 25, 2016 |
Pictures showing Tiling works in Progress... 1 Like
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 1:34pm On May 25, 2016 |
Pictures showing Completed POP Ceiling and wall screeding works, electrical cabling... http://www.sharpedgedesignltd.com/
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 1:35pm On May 25, 2016 |
Pictures showing Completed POP Ceiling and wall screeding works, electrical cabling and on going Furniture works... http://www.sharpedgedesignltd.com/ 1 Like
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by twinskenny(m): 1:57pm On May 25, 2016 |
architectB:well engr..is there a chance for cctv or dstv installation for the client,? Thanks |
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 2:10pm On May 25, 2016 |
Pictures showing Completed POP Ceiling and wall screeding works, electrical cabling and on going Furniture works... twinskenny: Good day to you, Well we did not make any provision for CCTV as it was not required by the client but there are adequate provisions for DSTV (all conduit)... as a matter of fact, one of the latter pictures i will eventually upload shows the already installed DSTV dish. Thanks for your question.
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 2:15pm On May 25, 2016 |
Pictures showing completed POP Ceiling works, flush doors and Burglaries to be installed... It also shows the granite tiled floor of the main Lounge... http://www.sharpedgedesignltd.com/
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 2:18pm On May 25, 2016 |
Pictures also showing completed POP Ceiling and screeding works with ready to be installed Burglaries...
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 2:22pm On May 25, 2016 |
Pictures showing completed POP works, near complete Tiling works on Staircase with yet to be assembled kitchen cabinet HDF boards. http://www.sharpedgedesignltd.com/
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 2:24pm On May 25, 2016 |
Picture showing on going tiling works on the floor of the kitchen
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 2:26pm On May 25, 2016 |
Picture showing yet to be completed Kitchen wall tiles... http://www.sharpedgedesignltd.com/
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 2:28pm On May 25, 2016 |
Picture showing Dining Area...
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 2:30pm On May 25, 2016 |
Picture showing Family Lounge... http://www.sharpedgedesignltd.com/
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 2:32pm On May 25, 2016 |
Picture showing Master's Bathroom... 1 Like
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 2:33pm On May 25, 2016 |
Picture showing Master's Bedroom. http://www.sharpedgedesignltd.com/
|
Re: Step By Step Construction Of A 5 Bedroom Duplex At Lekki (in Pictures) Contd. 12 by architectB(m): 2:35pm On May 25, 2016 |
Picture showing yet to be completed External Wall Tiles...
|
Cost Of Roofing With Alluminium Long Span / 4bedroom bungalow with 2bedroom flat In Gbetu,awoyaya for sale (with Pics) / Buy And Build Beach Front Estate @eleko Ocean Pearl Pls Call+2349030188831
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 29 |