Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 8:21am On Feb 08, 2018 |
These are some criterion that determine the accuracy of the quantity of woods you needed to roof your house.
1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.
For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.
Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.
Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.
Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.
Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.
Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.
2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.
For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.
But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.
3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.
4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.
5. You need to know the length and breadth of your building.
These 5 points matters a lot in getting accurate quote for your roofing project
Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.
Thanks
God bless you all
for more info please contact 08182481552 or whatsapp same number email: lifelightproperties@gmail.com facebook page
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 11:13am On Feb 08, 2018 |
. |
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 4:30pm On Feb 08, 2018 |
. |
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 6:33am On Feb 09, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 7:19pm On Feb 10, 2018 |
HsLBroker: These are some criterion that determine the accuracy of the quantity of woods you needed to roof your house.
1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.
For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.
Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.
Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.
Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.
Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.
Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.
2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.
For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.
But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.
3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.
4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.
5. You need to know the length and breadth of your building.
These 5 points matters a lot in getting accurate quote for your roofing project
Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.
Thanks
God bless you all
for more info please contact 08182481552 or whatsapp same number email: lifelightproperties@gmail.com facebook page
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 12:21pm On Feb 11, 2018 |
.... |
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 1:14am On Feb 13, 2018 |
Still available |
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 12:01pm On Feb 14, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 8:36am On Feb 21, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 10:58am On Feb 21, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 1:55am On Feb 22, 2018 |
HsLBroker: These are some criterion that determine the accuracy of the quantity of woods you needed to roof your house.
1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.
For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.
Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.
Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.
Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.
Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.
Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.
2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.
For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.
But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.
3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.
4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.
5. You need to know the length and breadth of your building.
These 5 points matters a lot in getting accurate quote for your roofing project
Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.
Thanks
God bless you all
for more info please contact 08182481552 or whatsapp same number email: lifelightproperties@gmail.com facebook page
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 11:48am On Feb 25, 2018 |
Happy new week |
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 9:17am On Feb 26, 2018 |
HsLBroker: These are some criterion that determine the accuracy of the quantity of woods you needed to roof your house.
1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.
For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.
Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.
Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.
Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.
Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.
Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.
2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.
For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.
But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.
3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.
4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.
5. You need to know the length and breadth of your building.
These 5 points matters a lot in getting accurate quote for your roofing project
Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.
Thanks
God bless you all
for more info please contact 08182481552 or whatsapp same number email: lifelightproperties@gmail.com facebook page
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 10:08pm On Feb 26, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 10:44pm On Mar 19, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 2:00am On May 02, 2018 |
. |
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 8:44pm On May 29, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 5:15am On Jun 01, 2018 |
HsLBroker: These are some criterion that determine the accuracy of the quantity of woods you needed to roof your house.
1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.
For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.
Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.
Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.
Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.
Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.
Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.
2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.
For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.
But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.
3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.
4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.
5. You need to know the length and breadth of your building.
These 5 points matters a lot in getting accurate quote for your roofing project
Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.
Thanks
God bless you all
for more info please contact 08182481552 or whatsapp same number email: lifelightproperties@gmail.com facebook page
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 7:33am On Jun 13, 2018 |
. |
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 11:12am On Jun 14, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 11:14am On Jun 14, 2018 |
HsLBroker: These are some criterion that determine the accuracy of the quantity of woods you needed to roof your house.
1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.
For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.
Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.
Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.
Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.
Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.
Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.
2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.
For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.
But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.
3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.
4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.
5. You need to know the length and breadth of your building.
These 5 points matters a lot in getting accurate quote for your roofing project
Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.
Thanks
God bless you all
for more info please contact 08182481552 or whatsapp same number email: lifelightproperties@gmail.com facebook page click here to visit our website
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 4:02pm On Jun 16, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 6:36pm On Jun 16, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 9:05am On Jun 17, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 9:30am On Jun 18, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 2:00pm On Jun 18, 2018 |
[quote author=HsLBroker post=65245631][/quote] |
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 6:00pm On Jun 26, 2018 |
[quote author=HsLBroker post=68598143][/quote] |
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 2:15pm On Jun 27, 2018 |
HsLBroker: These are some criterion that determine the accuracy of the quantity of woods you needed to roof your house.
1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.
For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.
Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.
Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.
Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.
Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.
Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.
2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.
For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.
But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.
3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.
4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.
5. You need to know the length and breadth of your building.
These 5 points matters a lot in getting accurate quote for your roofing project
Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.
Thanks
God bless you all
for more info please contact 08182481552 or whatsapp same number email: lifelightproperties@gmail.com facebook page
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 11:09pm On Jun 27, 2018 |
. |
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 10:56am On Jun 28, 2018 |
|
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 3:03pm On Jul 01, 2018 |
Happy new month! |
Re: Criterion That Determine The Quantities Of Woods You Need For Your Roof Project by Nobody: 11:40am On Jul 02, 2018 |
|