Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,152,868 members, 7,817,564 topics. Date: Saturday, 04 May 2024 at 02:29 PM

5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. (4762 Views)

We Are Now At Oko Baba Under Bridge Sawmill Ebute Metta For All Kinds Of Woods. / Criterion That Determine The Quantities Of Woods You Need For Your Roof Project / A Roofing Project For A Client At Owerri, Imo State (2) (3) (4)

(1) (2) (3) (4) (5) (6) (Reply) (Go Down)

5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 9:50am On Apr 04, 2019
This are some criteria that determine the accuracy of the quantity of woods you needed to roof your house.

1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.

For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.

Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.

Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.

Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.

Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.

Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.

2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.

For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.

But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.

3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.

4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.

5. You need to know the length and breadth of your building.

These 5 points matters a lot in getting accurate quote for your roofing project

Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.

Thanks

God bless you all for your time reading through

2 Likes 1 Share

Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 6:09pm On Apr 04, 2019
Our recent work

Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 6:19pm On Apr 04, 2019
Our recent work .

Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 8:25am On Apr 05, 2019
Before and after covering, project in delta this year

Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 8:31am On Apr 05, 2019
.

Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 5:04pm On Apr 06, 2019
.
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 3:05pm On Apr 09, 2019
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by nwaonyeze001(m): 4:19pm On Apr 11, 2019
HsLBroker:
This are some criteria that determine the accuracy of the quantity of woods you needed to roof your house.

1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.

For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.

Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.

Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.

Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.

Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.

Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.

2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.

For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.

But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.

3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.

4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.

5. You need to know the length and breadth of your building.

These 5 points matters a lot in getting accurate quote for your roofing project

Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.

Thanks

God bless you all for your time reading through


God bless you too for the information.....
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 4:22pm On Apr 11, 2019
nwaonyeze001:



God bless you too for the information.....
amen thanks
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 11:00pm On Apr 11, 2019
.
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Pabloosas(m): 8:36pm On Apr 14, 2019
Nice
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 2:30am On Apr 15, 2019
Pabloosas:
Nice
thank u Sir
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 3:08am On Apr 23, 2019
.
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 9:56am On Apr 25, 2019
....
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 9:56am On Apr 25, 2019
HsLBroker:
Hardwood available for sale call 08114018823
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 2:27am On May 01, 2019
HsLBroker:
This are some criteria that determine the accuracy of the quantity of woods you needed to roof your house.

1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.

For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.

Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.

Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.

Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.

Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.

Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.

2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.

For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.

But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.

3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.

4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.

5. You need to know the length and breadth of your building.

These 5 points matters a lot in getting accurate quote for your roofing project

Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.

Thanks

God bless you all for your time reading through
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 4:34pm On May 02, 2019
[quote author=HsLBroker post=77839183][/quote]
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Ododoeye0020(m): 8:40am On May 06, 2019
Where's your location
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 10:36am On May 06, 2019
Ododoeye0020:
Where's your location
shagamu
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 12:07pm On May 06, 2019
..
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 5:22am On Jun 26, 2019
.
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 8:26am On Jul 03, 2019
HsLBroker:
This are some criteria that determine the accuracy of the quantity of woods you needed to roof your house.

1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.

For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.

Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.

Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.

Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.

Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.

Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.

2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.

For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.

But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.

3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.

4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.

5. You need to know the length and breadth of your building.

These 5 points matters a lot in getting accurate quote for your roofing project

Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.

Thanks

God bless you all for your time reading through
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 3:57am On Jul 05, 2019
HsLBroker:
This are some criteria that determine the accuracy of the quantity of woods you needed to roof your house.

1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them. ..

For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.

Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.

Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.

Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.

Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.

Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.

2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.

For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.

But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.

3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.

4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.

5. You need to know the length and breadth of your building.

These 5 points matters a lot in getting accurate quote for your roofing project

Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.

Thanks

God bless you all for your time reading through
Re: 5 Cardinal Points 4 Accurate Quantities Of Woods U Need 4 Ur Roofing Project. by Nobody: 12:20am On Jul 08, 2019
HsLBroker:
This are some criteria that determine the accuracy of the quantity of woods you needed to roof your house.

1. You need to make decision on the type of roofing sheet you want to use because the purlin spacing we use for long span roofing sheet is different from that of stepped tiles, though metecopo and stepped tiles purlin spacing are the same, and stone tiles or stone coated roofing sheets purlin spacing is different from all of them.

For instance long span purlin spacing is about 2.5ft to 3ft depend on instruction giving to carpenters.

Stepped and metecopo spacing is approximately 18 inches wish is 1 ft and 6 inches purlin spacing.

Stone coated or Stone tiles is approximately 14 inches purlin spacing which is 1ft and 2inches.

Meaning the purlins wood quantity for stone coated is more than stepped tiles and metecopo, and that of stepped tiles and metcopo is more than longspan and asbestos roofing sheets.

Having stated all this, if you are using stones coated and you get quote for long span hardwood, it will not work because you will need more woods for your purlin and additional work force.

Though all the woods for tie beam, rafters, strut or bracing and wall plate remain the same.

2. Another area which is critical is whatever you are using slate for your ceiling noggin covering or pop or PVC.

For instance if you are using slate though this is getting outdated now, the ceiling noggin spacing is 4ft by 4ft, but the standard for pop and pvc is 2ft by 4ft, but some pop designers insist on 2ft by 2ft which translate to the fact that if your contractor construct your ceiling noggin spacing using 2ft by 4ft, the pop designers can reject or condemn it which will translate in other opinion that the contractor have done a bad job for you and that can cause misunderstanding btw you and your contractor because the ceiling noggin will need to later be convert to 2ft by 2ft spacing.

But the fact remain that the standard for both pop and pvc ceiling covering is 2ft by 4ft ceiling noggin spacing, because the binding wire they use to hook or hang this pop is not connected with ceiling noggin, it is actually hook or hang to the tie beam, because it is the tie beam that will carry the weight of the pop, only the yawn, the white thread materials is connect with the ceiling noggin, i'm saying all this base on experience.

3. Another important point is whether you have a parapet or not. If you have a parapet, you won't need facial board for your over hang extension design because the parapet will replace the facial board, and the additional 2 inches by 2 inches by 12 ft (2x2x12) woods for the outside noggin won't be needed but if you don't have a parapet then you will need some facial board and additional 2x2x12 woods for the outside noggin over hang extension construction.

4. The height of your roof also matter in determine quantity of woods that will be needed, if you are considering 12 ft before getting the quote and after getting the quote or the contract awarded, you now decide that the height of your roof should be 16 ft you need to know there will be need for more woods.

5. You need to know the length and breadth of your building.

These 5 points matters a lot in getting accurate quote for your roofing project

Answer to all this questions and making a decision gives you an opportunity to get accurate quote because they are very essentials.

Thanks

God bless you all for your time reading through

(1) (2) (3) (4) (5) (6) (Reply)

A Room Self Contained For Rent In Ado-ekiti / Free Architectural Design For Nairalanders / Opportunity To Own Land In Abuja Fct @ An Incredible Price Of 150,000 Per Plot

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 57
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.