Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,155,545 members, 7,827,036 topics. Date: Tuesday, 14 May 2024 at 05:24 AM

Photos Of $250 Million General Electric Industrial facility At Calabar - Business - Nairaland

Nairaland Forum / Nairaland / General / Business / Photos Of $250 Million General Electric Industrial facility At Calabar (1117 Views)

Flutterwave Triples Valuation To Over $3 Billion In A Year, Raises $250 Million / Oriental Hotel Up For Sale For $250 Million / EXCUSIVE: Free Fiverr Training + 16 Fiverr Tools: Earn Between $250-$800 Monthly (2) (3) (4)

(1) (Reply) (Go Down)

Photos Of $250 Million General Electric Industrial facility At Calabar by Nobody: 10:34pm On Aug 11, 2020
In the Calabar Free Trade Zone, Cross River State, Julius Berger was contracted to carry out the Engineering, Procurement and Construction (EPC) of a major industrial facility for a multinational conglomerate.

Whilst the initial intended use of the facility was to fabricate subsea trees for oil exploration, the main design consideration was to provide maximum flexibility to enable the client’s various business units and entities to use the Main Multi-Modal Facility, a 8,000 m² multi-purpose hall, which is the core of the development.

Other buildings on the plot include office buildings and gatehouses as well as an energy centre (power, potable water, firefighting water. etc.) for fully self-sufficient operations. All infrastructure services (power, water, data) formed part of the scope of work. They were also designed and executed in a way that future extensions are possible without laying of additional pipes/cables.

In order to safe cost, a tailor-made pile layout and welded steel structure was designed and executed. Key features of the Multi-Modal Facility include the option to install a 20 ton and a 100 ton overhead crane, the construction of a “gas test pit” for subsea tree testing (2 trees), features that allow large-scale turbine maintenance and flexibility for future building extension. Additionally, special hardened concrete floor allows use of master movers for subsea trees whilst minimizing maintenance

The design works were performed in steps, which did provide for client’s input and review at 30%, 60% and 90% stages. The project was mainly designed in Nigeria by PrimeTech Engineering Nigeria Limited.

2 Likes

Re: Photos Of $250 Million General Electric Industrial facility At Calabar by Nobody: 10:35pm On Aug 11, 2020
more pics

1 Like

Re: Photos Of $250 Million General Electric Industrial facility At Calabar by SocialJustice: 10:47pm On Aug 11, 2020
Didn't know general electric was this deep into oil servicing too.

1 Like

Re: Photos Of $250 Million General Electric Industrial facility At Calabar by Bluntguy: 11:15pm On Aug 11, 2020
This is good. More grease!
Re: Photos Of $250 Million General Electric Industrial facility At Calabar by ODJ124(m): 11:41pm On Aug 11, 2020
keep the good work rolling
Re: Photos Of $250 Million General Electric Industrial facility At Calabar by Nobody: 12:00am On Aug 12, 2020
What difference will it make?

Re: Photos Of $250 Million General Electric Industrial facility At Calabar by zoeA: 12:25am On Aug 12, 2020
piggyvestashawo:
What difference will it make?
None whatsoever... Are we cursed? Niger Delta oil is a glaring example
Re: Photos Of $250 Million General Electric Industrial facility At Calabar by leofab(f): 2:33am On Aug 12, 2020
Cheap architecture
Re: Photos Of $250 Million General Electric Industrial facility At Calabar by otipoju(m): 3:29am On Aug 12, 2020
leofab:
Cheap architecture

It's a production plant and not a hotel...it does not have to be grandiose to produce profits.

No be everything person must talk put.

2 Likes

Re: Photos Of $250 Million General Electric Industrial facility At Calabar by Baloranking(m): 3:59am On Aug 12, 2020
leofab:
Cheap architecture

Did you even read the content or even view the pictures attached.

2 Likes

Re: Photos Of $250 Million General Electric Industrial facility At Calabar by pyyxxaro: 4:03am On Aug 12, 2020
Buhari is shocked

Re: Photos Of $250 Million General Electric Industrial facility At Calabar by leofab(f): 2:33am On Aug 13, 2020
otipoju:


It's a production plant and not a hotel...it does not have to be grandiose to produce profits.

No be everything person must talk put.
are you not seeing production plants else where? Must we remain cliquey ?
Re: Photos Of $250 Million General Electric Industrial facility At Calabar by otipoju(m): 2:40am On Aug 13, 2020
leofab:
are you not seeing production plants else where? Must we remain cliquey ?

Wetin this one dey talk. I live in a developed country, I see production plants everywhere...its the same design.

Corporate headquarters is a different thing. Meanwhile you may need to check the real meaning of your cliquey...I dont see how it relates to your point

1 Like

(1) (Reply)

Earn $20 - $30 Daily On Amazon Free / BINANCE - Crypto trading signals / Sunpower Ponzi Investment Crashes

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 14
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.