Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,162,531 members, 7,850,818 topics. Date: Wednesday, 05 June 2024 at 09:35 AM

Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction - Properties (2) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction (11050 Views)

New Design Alert!! Contemporary 4 Bedroom Executive Duplex Design / Proposed 6 Bedroom Executive Duplex Architectural Design / Satelite Town Executive Duplex For Sale (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (Reply) (Go Down)

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 2:40am On Nov 03, 2021
Keep following up with us for more picture updates here today
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 11:22am On Nov 03, 2021
As promised.
Here are some of the picture
updates from the site.
View from the front.

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 3:10am On Nov 05, 2021
We are already doing pillars and Lintel works...
So far we have used 1,700 blocks to get this level from the site concrete to the lintel level.

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by jazzykhm(m): 8:48pm On Nov 05, 2021
Pls can u tell us d total cost to dese level
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 9:50pm On Nov 05, 2021
jazzykhm:
Pls can u tell us d total cost to dese level

So far we have spent 5.1m

Total Blocks so far = 2,900 Blocks at 280 Per 1, from Foundation
We bought reinforcements 1 Ton each of 16mm 12mm and 10mm at 415K pet ton, 4 roles of binding wire - 130 pieces of 1x12x12 Planks - 2 Bags of Nail - 3 Trips of Granite - 5 Trips of Sharp Sand - 8 Trips of Filling Sand and 230 Bags of Cement so far.

2 Likes

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 9:51pm On Nov 05, 2021
Some of the Works on lintel and Colums.

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by jazzykhm(m): 12:28am On Nov 08, 2021
Dennis3D:


So far we have spent 5.1m

Total Blocks so far = 2,900 Blocks at 280 Per 1, from Foundation
We bought reinforcements 1 Ton each of 16mm 12mm and 10mm at 415K pet ton, 4 roles of binding wire - 130 pieces of 1x12x12 Planks - 2 Bags of Nail - 3 Trips of Granite - 5 Trips of Sharp Sand - 8 Trips of Filling Sand and 230 Bags of Cement so far.
Thanks hro

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 5:13pm On Nov 08, 2021
Good evening all.
We are on a short break.
We are resuming soonest.
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 7:36pm On Nov 10, 2021
Good evening all.
Stay tuned still.
We will be back shortly.
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 12:39pm On Nov 14, 2021
We have resumed leveling of the building

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 7:54pm On Nov 14, 2021
Keep following up with us here too
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by presido997(m): 9:23pm On Nov 14, 2021
How much is budgeted for the total work?
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 2:58pm On Nov 15, 2021
presido997:
How much is budgeted for the total work?

Carcass is estimated to cost 14m.

So far we have spent 5.5m
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by mufutau55(m): 2:10am On Nov 16, 2021
Dennis3D:

Carcass is estimated to cost 14m.
So far we have spent 5.5m

Transparency as usual. Good work, Oga mi Sir.

Hajji M.

1 Like

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 7:04am On Nov 16, 2021
mufutau55:


Transparency as usual. Good work, Oga mi Sir.

Hajji M.

Very Important because we keep record and track of all our projects. Which in turn helps in projection of future projects and developments.

Reason why when we do a quote. It's gonna be realistic enough as a projection.

1 Like

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Ehimzy(m): 10:25am On Nov 17, 2021
Dennis3D:


Carcass is estimated to cost 14m.

So far we have spent 5.5m

Please what does carcass mean? ..
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 6:49pm On Nov 17, 2021
Ehimzy:


Please what does carcass mean? ..

The Word Carcass as used in my context and as far as this discussion is concerned is. Building from foundation roofing.

It covers the following...
- Foundation
- Ground Floor
- Decking
- First Floor
- Concrete Facial
- Roofing.
- MEP piping as well.

This is where my Carcass stops.

Anything outside this I regard as finishing stage in my dictionary...

2 Likes

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 7:10pm On Nov 17, 2021
We should be starting the decking of this piece month end.
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 6:26pm On Nov 20, 2021
FYI

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 7:46am On Dec 25, 2021
Compliments of the season to you all

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by azpekuliar: 8:05am On Dec 25, 2021
I don camp for here.

Na only half-plot we fit afford in the more central parts of town were land is expensive. grin

1 Like

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 10:27pm On Dec 25, 2021
azpekuliar:
I don camp for here.

Na only half-plot we fit afford in the more central parts of town were land is expensive. grin

Lol, thanks for stopping by.
It will surprise you that we can do amazing designs and construction on just half plot too. Like this one we are doing now.
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 5:55am On Dec 27, 2021
Good morning Viewers
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 11:43am On Dec 27, 2021
Thank you Dear followers

1 Like

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 1:25am On Jan 01, 2022
Chewers

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 4:16am On Jan 11, 2022
Resuming the project 3rd week of January
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 4:14am On Jan 12, 2022
Thank you so much for stopping by our thread.
It means alot to us. Just your viewing and reading is enough to know that people we watching what we are doing....

We want to say thank you to you...

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 7:44pm On Jan 22, 2022
Good evening Dear followers.
We are glad to bring to your notice that we are resuming this site come the new week we are entering.

So stay tuned with us...

1 Like

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 8:17pm On Jan 26, 2022
As promised.
We have resumed this site.
Material delivery for the decking works.
290 pieces of 1x12x12 was gotten, 120 pieces of 2x3x12, about 150 bamboo sticks as well was gotten for this purpose

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 8:19pm On Jan 26, 2022
Decking works update.
Beam formation...

Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 10:04am On Jan 28, 2022
Good morning Viewers
Re: Ikorodu Half Plot - 4 Bedroom Executive Duplex Active Construction by Dennis3D(m): 8:30am On Jan 31, 2022
Work update from here...
Decking carpentry work almost done.

(1) (2) (3) (4) (5) (6) (7) (8) (Reply)

Smart Card Door Key Lock System For Hotel/business / Lekki Ocean View Estate Itamarun Ibeju Lekki (with Excision) / Building Collapsed At Jakande Estate,ejigbo

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 36
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.