Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,151,580 members, 7,812,898 topics. Date: Monday, 29 April 2024 at 09:36 PM

Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush - Education - Nairaland

Nairaland Forum / Nairaland / General / Education / Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush (77343 Views)

Nigerian CEO Rewards JAMB Top Scorer Kamsiyochukwu Umeh With N2.5 Million(Photo) / Otedola Donates N2 Billion To Catholic's Augustine University, Lagos / Owerri Mega School Collapses After Rainfall; Was Slated For Commissioning (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (Reply) (Go Down)

Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by FreeStuffsNG: 2:45pm On Aug 12, 2023
During the administration of Rauf Aregbesola in Osun State, the government awarded the construction of 3000-student capacity steel schools, one each in Ilesa, Osogbo and Iwo, to Slava Yeditepe Projects Limited.

When completed, former President Muhammadu Buhari jetted to the state on September 1, 2016, to commission the one in Osogbo, named Osogbo Government High School. The second one built in Ilesa also came to fruition before Aregbesola’s tenure as governor ended in 2018. However, that of Iwo remains a spectacle, sitting comfortably on a bushy 10,000 square metres of land on the premises of Iwo Grammar School, along Araromi road in the town.

2 BILION NAIRA WASTING AWAY
abandoned school block
Like the two completed structures in Osogbo and Ilesa, the massive uncompleted school, made of prefabricated light gauge steels, in Iwo has 72 classrooms and a large hall.

Other features of the school are utility storage, office spaces, storage for documents, eight restrooms (four each for males and females), sporting facilities, a borehole, standalone transformer and firefighting devices.

According to the delivery timeline, the contractor was expected to complete the construction in May 2017. But that never happened. The administration of Adegboyega Oyetola, the governor who succeeded Aregbesola, appeared to have also dragged its feet on the project, as no visible move was made to make the facility usable.

During a visit to the facility in Iwo on July 22, FIJ found that the school had become a viable ground for reptiles and other animals. Finding a route to the building was challenging, as it had been fenced out by overgrown weeds.

Our findings showed the project was funded from an N11.4 billion Sukuk bond, an Islamic financial instrument the former governor issued in 2013.

At a time one dollar was N197, the project was awarded for $10,500,000 to the contractor with a delivery time of 24 months. When converted accordingly, the project funding was N2,068,500,000.

A classroom.

FIJ found that some windows and asbestos had started falling off. Six years on, the two-storey structure has been left to the mercy of offending vegetation while its beauty and characteristics fade away.

We shared our findings with Dipo Eluwole, Osun Commissioner for Education, on Friday, seeking to know what plan the current government had towards making the facility functional.

“The government will organise an education summit very soon to appraise the whole situation. Our appraisal will be comprehensive. Stakeholders’ deliberations at the summit will shape our next line of action about all the abandoned and functional educational facilities in the state,” Eluwode said.

https://fij.ng/article/osun-mega-school-aregbesola-built-with-n2b-is-fading-away-in-the-bush/

4 Likes 2 Shares

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by FreeStuffsNG: 2:45pm On Aug 12, 2023
More pictures.

This is completely unacceptable. Check my signature for free stuffs!

10 Likes 7 Shares

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by FreeStuffsNG: 2:48pm On Aug 12, 2023
And more pictures

1 Share

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by Alchemy528: 2:49pm On Aug 12, 2023
Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by a4cube: 2:49pm On Aug 12, 2023
What is the difference btw this and the railway in Lagos?.

212 Likes 19 Shares

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by fourboys: 2:50pm On Aug 12, 2023
This is bad

7 Likes 2 Shares

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by jumper524(m): 2:51pm On Aug 12, 2023
On what ground was these beautiful project abandoned?
Recurrent expenditure??

226 Likes 15 Shares

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by jmoore(m): 3:00pm On Aug 12, 2023
Which kind wastefulness is this?

And they will have senior speclal advisers who have assistant special advisers advising them.

286 Likes 18 Shares

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by OgogoroFreak(m): 3:03pm On Aug 12, 2023
The school was to make the state in it's form.
Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by SmartPolician: 3:22pm On Aug 12, 2023
From north to south, east to west, this country is totally sick. I always say that nobody genuinely loves this country. If you want to see those who love their country, check how they manage public assets and funds.

To this end, state governments should stop awarding and running projects. Make everything PPP to get serious minds to manage the projects.

This country is just annoying!

334 Likes 23 Shares

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by CodeTemplar: 3:30pm On Aug 12, 2023
The list of unviable or comatose projects is endless from federal to state govs.

Ebonyi airport
Daura rail
Osun school
Refineries
IPPs

105 Likes 9 Shares

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by CodeTemplar: 3:33pm On Aug 12, 2023
SmartPolician:
From north to south, east to west, this country is totally sick. I always say that nobody genuinely loves this country. If you want to see those who love their country, check how they manage public assets and funds.

To this end, state governments should stop awarding and running projects. Make everything PPP to get serious minds to manage the projects.

This country is just annoying!
allocation should be tied to verifiable IGR. Anything short will lead to wastage.

22 Likes 2 Shares

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by CodeTemplar: 3:39pm On Aug 12, 2023
shocked
a4cube:
What is the difference btw this and the railway in Lagos?.

or
Ebonyi airport
Or
Daura rail
Or
IPPs in SS

31 Likes 2 Shares

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by Usmanovic95(m): 3:48pm On Aug 12, 2023
Nigerians lack maintenance culture.We take proper care and maintenance of our private asset than we do on public asset.

Modified: This is a case of wastage of limited public funds,I just hope the sunk cost fallacy dont play out.

12 Likes 1 Share

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by Yatimala929: 3:52pm On Aug 12, 2023
Hmmm last last
Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by patrislayqueen: 3:53pm On Aug 12, 2023
This contreee eh

Meanwhile, GAS CARBURETOR CONVERTER is still much available...

5 Likes 1 Share

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by opalu: 3:53pm On Aug 12, 2023
Hmmm
Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by Vladm(m): 3:53pm On Aug 12, 2023
....
Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by wittywriter: 3:53pm On Aug 12, 2023
Vagabonds in Power







Wittyness

5 Likes

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by adekanmbi1986(m): 3:53pm On Aug 12, 2023
Same thing in Ogun State

14 Likes

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by spagettiluv: 3:53pm On Aug 12, 2023
See fine school

26 Likes 2 Shares

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by PureFace1(m): 3:53pm On Aug 12, 2023
I bet this is cause by the current government of Osun state

I don't know why Opposition party always abandoned the projects of their predecessors in Nigeria out of spite.

I blame Governor Adeleke for this.

34 Likes 7 Shares

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by Jokerman(m): 3:54pm On Aug 12, 2023
Lol .. people wey no get brain... Who wan go school inside bush .

But but white elephant project anyway

6 Likes 1 Share

Re: Osun Mega School Aregbesola Built With N2 billion Is Fading Away In The Bush by Hndrrxxx(m): 3:54pm On Aug 12, 2023
Hg

(1) (2) (3) (4) (5) (6) (7) (Reply)

Chiwueze Kingsley: Missing IMSU Student Found Dead (Graphic Photo) / UNIBEN Student Kept All The Pens He Used Till Graduation (Photo) / Obi Mirabel: UNN Student To Be Expelled For Twerking In Bikini In A Competition

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 31
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.