Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / NewStats: 3,152,895 members, 7,817,636 topics. Date: Saturday, 04 May 2024 at 04:00 PM |
Nairaland Forum / Nairaland / General / Politics / See Buhari's Plan For Electricity In Nigeria (4278 Views)
Nigerians To Pay N7.45/kwh More For Electricity (see Price List) / Aisha Buhari Didn't See Buhari In London; Cabal Forged Buhari's Signature - SR / Presidency Reacts To Senate’s Rejection Of Buhari’s Plan To Borrow $30bn (2) (3) (4)
Re: See Buhari's Plan For Electricity In Nigeria by iamrealdeji(m): 5:28pm On Jul 31, 2015 |
Ama80:You must be lying if you say that light ain't stable. Your area probably have some kinda problem. Almost every Nigerians are talking about stable power supply these days,and it's the same here,in fact there's light right now,i can't remember the last time I used my gen or my power bank |
Re: See Buhari's Plan For Electricity In Nigeria by Ama80(f): 5:35pm On Jul 31, 2015 |
iamrealdeji:really?and u think it's all pmb's doing.he must be a god to hav transformed d power sector in just Months.i don't have light right now dats all. |
Re: See Buhari's Plan For Electricity In Nigeria by Qualer: 6:31pm On Jul 31, 2015 |
Ama80: Why are you worrying yourself with sheep that can't decipher their left hand from their right leg... you get time o!! |
Re: See Buhari's Plan For Electricity In Nigeria by falcon01: 6:35pm On Jul 31, 2015 |
iamrealdeji:♍♦ i swear nepa don improve 1 Like |
Re: See Buhari's Plan For Electricity In Nigeria by iamrealdeji(m): 6:56pm On Jul 31, 2015 |
falcon01:And yet,hypocrites like Ama80 are still yelling Buhari didn't do it,then who did it? Nothing like this has happened in the past 16 years that the whole nation will be enjoying power supply,Ama,is it Jonathan that quickly fixed what he didn't do through out his tenure within a week before he left? |
Re: See Buhari's Plan For Electricity In Nigeria by Ama80(f): 8:57pm On Jul 31, 2015 |
iamrealdeji:seems u like calling my name.continue 1 Like |
Re: See Buhari's Plan For Electricity In Nigeria by ManTiger(m): 11:43pm On Jul 31, 2015 |
MabraO:Clap for your self. I mostly skim and don't have all the time like you to read everything. If you have the luxury of time you can read every post i'm made on NL and see how massively i've stood behind PMB. Fact is 175MV X 4 is not going to get us anywhere, when are we going to stop flaring our gas? When are we going to have Nuclear Power Plant in a secure location? This is the area i'm expecting the People's General to concentrate on and not what the previous administration has done and failed. And for the record bro, don't be fast to attack. There are better ways to handle dispute, after all I don't know you from Adam! |
Re: See Buhari's Plan For Electricity In Nigeria by MabraO: 11:47pm On Jul 31, 2015 |
ManTiger: Ur mumu has no bound So u find reading a post as jobless? Ur parents needs a refund for wasting money dey used in sending u to sch Thanks for displaying ur ignorance once again |
Re: See Buhari's Plan For Electricity In Nigeria by denedene(m): 1:35am On Aug 01, 2015 |
these are paper plans, we need actions. if na only these plans for paper obj would v been the best president. Buhari should act fast, I'm getting bored of his regime. too many agents with numerical disorder |
Re: See Buhari's Plan For Electricity In Nigeria by Nobody: 3:41am On Aug 01, 2015 |
Alstom Wins Power Plant Contract in Nigeria Alstom will provide four 175 MW Francis turbine-generator sets and related equipment. Alstom Hydro China (AHC) is responsible for the equipment design, manufacturing, supervision to the installation, commissioning, testing as well as site services, Alstom said. Located on the middle and upper reaches of River Kaduna near Zungeru in Niger state, Zungeru Hydropower Project will become the country’s largest hydropower project once operated, with 700MW installed capacity in total. “Zungeru is one of several hydro projects that are part of Nigeria’s Renewable Energy Master Plan. We are honoured to participate in such a grand agenda,” said Yves Rannou, Hydro Senior Vice President of Alstom Renewable Energies. Construction on the $1.3bn power plant began in 2013 and is scheduled for completion by the end of 2017. It is being built by CNEEC and China’s Sinohydro. Seventy-five percent of the funding comes from China Export Import Bank and the remaining 25% by the Nigerian Power Sector Intervention Fund. Last July angry youths from surrounding communities halted work in protest over what they claimed was unfair compensation for people displaced by the dam. Source and Link: Global Construction Review - See more at: https://www.expatnetwork.com/alstom-wins-power-plant-contract-in-nigeria/#sthash.6R4yv9q7.dpuf |
Re: See Buhari's Plan For Electricity In Nigeria by engrjacuzzi: 3:48am On Aug 01, 2015 |
I hope wen you finally appoint minister, there will be continuity o. |
Full Text: Email Exchange Between Sugabelly & Abubakar Audu's Son Mustapha / Photo Of Tinubu Cozying Up With Ex-Con James Ibori - Birds Of The Same Feather? / RUMORS: Nnamdi Kanu Pronounced Dead??
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 22 |