Nairaland Forum / Nairaland / General / Politics / Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger (31883 Views)
Peter Obi Thanks Lord Zeus For Protecting 2nd Niger Bridge / 2nd Niger Bridge: Host Communities Shut Down Julius Berger Office / Julius Berger Installs Live Camera On The 2nd Niger Bridge (2) (3) (4)
(1) (2) (3) (4) (Reply) (Go Down)
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Kuginzi: 9:49am On Nov 23, 2019 |
ZombieTERROR:Sifia Pain |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by BigBizzy(m): 9:53am On Nov 23, 2019 |
Really poor...buhari and his e-miscrants...comman talk nonsense again |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by garfield1: 9:54am On Nov 23, 2019 |
Up buharis.igbos are very grateful |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by ZombieTERROR: 9:54am On Nov 23, 2019 |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by safetyInspector(m): 10:00am On Nov 23, 2019 |
Where did you get this 18 storey building high information from? I am in doubt if it will be that much high. The existing bridge will be much higher than this one. 18storey is approximately 54 meters. frowland: 1 Like |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Nobody: 10:01am On Nov 23, 2019 |
Donvictor2015: You're IBO? Guess you must come from Guinea? 1 Like |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Kuginzi: 10:02am On Nov 23, 2019 |
ZombieTERROR:Igbo Amaka brain suffering from severe Hatred/mental psychosis in which thought and emotions are so impaired that contact is lost with external reality. May u receive brain before the end of 2019 |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Lazerone(f): 10:02am On Nov 23, 2019 |
We pray there'll be no halt. Meanwhile, did you know you can build a really beautiful building using just salt. Check it out http://prodesigners.com.ng/why-you-should-build-your-house-with-salt/ |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Nobody: 10:04am On Nov 23, 2019 |
100%-28%=72%.. And this 28% pictures is what one autoreport is giving us here everyday in 3D. |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by jayson87: 10:12am On Nov 23, 2019 |
GEJ Pillars damn |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by frowland(m): 10:14am On Nov 23, 2019 |
safetyInspector: Yea, its actually 18 story high from bottom of the river to the top. 1 Like |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by F117nighthawk: 10:15am On Nov 23, 2019 |
Only in Nigeria, 28% completed after 4 yrs of Jonathan, and 4yrs of APC, A BRIDGE LESS THAN 1 to 2 km, after 8 yrs,a country without shame,filled with shameless leaders |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Tokenism: 10:17am On Nov 23, 2019 |
frowland: Okay. Thanks |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by ensamy(m): 10:18am On Nov 23, 2019 |
Dwaf bridge to destroy South East development and economy. Inland waterways destroyed. |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by weslay: 10:28am On Nov 23, 2019 |
Germans and Chinese engineers are running to the banks, while most Nigerian engineers are riding UBER and struggling to make a living. Why can't Nigerians fix Nigerian roads and build our rails? These are technologies that have been available for over a century. Our Universities do not invest in R&, they continue to churn out graudates trained with outdated curriculum. Imagine going to school, no jobs. You decide to set up a legitimate business, government inconsistent policy, extortion from police and touts will kill your business. What else are the youths expected to do. Our leaders need to review the status quo and roll out policies that will make it easy for Nigerians to survive in Nigeria. |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Winning123: 10:29am On Nov 23, 2019 |
What an ignorant fellow. Temptee101: |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Moso(m): 10:31am On Nov 23, 2019 |
For your electrical Design with COREN seal call 08100896751. Our fees is affordable. |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by slimthugchimee2(m): 10:55am On Nov 23, 2019 |
frowland: It doesn't go to the bottom of the river thou |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Irore: 11:00am On Nov 23, 2019 |
ornicus: These dates; July, August, September 2018? I thought this was awarded by GEJ and work started then. Hmmmmm….. 1 Like |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Yankee101: 11:01am On Nov 23, 2019 |
How many decades? |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by CsRockefeller(m): 11:04am On Nov 23, 2019 |
frowland: How do they build under water Sir? And why is it going to be the only FG road tolled? |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Horus(m): 11:04am On Nov 23, 2019 |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by DarkJeddi(m): 11:13am On Nov 23, 2019 |
Donvictor2015: YOU are IBO not IGBO.. Down here in the East we're IGBOS.. 2 Likes 1 Share |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by udoka2013: 11:24am On Nov 23, 2019 |
Donvictor2015:you are not an Igbo. Igbo man can not call himself 'Ibo'. 1 Like 1 Share |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Leoninedreams: 11:30am On Nov 23, 2019 |
Donvictor2015:No, you're not. |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by ubox: 11:53am On Nov 23, 2019 |
slimthugchimee2:Is it floating? |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by Monday60655(m): 12:06pm On Nov 23, 2019 |
Super story. Deceivers. APC to use it for 2019 campaign. God z watching |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by frowland(m): 12:21pm On Nov 23, 2019 |
CsRockefeller: What they do is to sand fill the part they are going to build on just like they sandfilled banana island and people are building houses there now. In this case, they sandfill the part they want to work on, then build the pillars far deeper than the depth of the sea. After builfing this pillars and they are strong enough they will remove the sands and only the pillar will stand. 1 Like |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by frowland(m): 12:21pm On Nov 23, 2019 |
slimthugchimee2: It does, even farther. 1 Like |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by cyrilamx(m): 12:25pm On Nov 23, 2019 |
F117nighthawk:Make una dey read with comprehension. The Contract was signed last year and same year August, Work began. It untrue that work has been going on all these years. It was more of phony work. Actual work started under PMB in 2018. 2 Likes 1 Share |
Re: Construction Works On 2nd Niger Bridge 28% Complete – Julius Berger by DennisEche(m): 12:45pm On Nov 23, 2019 |
E be like say all projects under this gomenti na audio |
Yahaya Bello: They Want To Use COVID-19 Vaccine To Kill Us (Video) / Bandits Kill 19 People In Kutemeshi, Kaduna State (photos) / Presidency Reacts To Soyinka's 'Nebuchadnezzar' Tag On Jonathan
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 28 |