Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,155,278 members, 7,826,080 topics. Date: Monday, 13 May 2024 at 09:27 AM

Ikoyi-lekki Link Bridge To Be Commissioned By November - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Ikoyi-lekki Link Bridge To Be Commissioned By November (18542 Views)

Projects Commissioned By Governor Ayodele Fayose Today (photos) / Delta State Governor's Lodge In Lagos Commissioned By Uduaghan (photos) / Omotosho Power Plant II To Be Commissioned By President Jonathan Today (2) (3) (4)

(1) (2) (3) (4) (Reply) (Go Down)

Ikoyi-lekki Link Bridge To Be Commissioned By November by 740megawatts: 12:54pm On Oct 02, 2012
BY OLASUNKANMI AKONI

MOTORISTS along Ikoyi, Lekki-Epe axis will soon heave a sigh of relief as the first ever cable styled bridge of its kind in the sub Saharan West Africa region – Lekki-Ikoyi Link Bridge, has reached 95 percent stage of completion.

The link bridge project is sponsored by Governor Babatunde Fashola administration in Lagos State and being constructed by the construction giant, Julius Berger Plc.

he project was conceived in 2008, as solution to the perennial bottleneck on the Lekki- Epe road being serviced by only one access road.

Therefore, people of the highbrow choice area and the adjoining Victoria Island will soon witness a tremendous and pleasurable driving experience upon completion of the link bridge which will cause a relief from the daily traffic challenges the residents face trying to connect either Ikoyi or Lekki through Falomo Bridge, Alfred Rewane Road or Lekki-Epe Road.

Femi Hamzat, Lagos State commissioner for Works and Infrastructure, described it as historic, noting: “No doubt it is a testament to the sagacity of an administration determined to build tomorrow’s infrastructure today. It is the hallmark of a commitment to the welfare and socio-economic wellbeing of its people.”

When Vanguard Newspaper visited the site recently, it was gathered that the level of work had reached over 95 percent and according to Hamzat the target is to commission it before the end of this year, specifically first week in November.

The aesthetic bridge is a standard megacity compliant facility. It is to serve as a strategic bypass along the Falomo Bridge and Alfred Rewane, Independence Bridge and Ahmadu Bello Way.

Designed as dual carriageway, the bridge directly connects Lekki Phase I Estate with Alexander in Ikoyi. It is envisaged that on completion it would improve the living standard of the people and enhance social interaction, as it represents a significant content in the state’s tourism portfolio.

“The infrastructures provided must not only reflect present realities but also envisage future growth trends,” Hamzat stated, adding that it will also reduce travel time, save man-hour loss by motorists.

Moreover, the link bridge is expected to reduce the traffic on Lekki-Epe Toll Gates, as motorists who do not have any business along the axis would have the option of going through the link bridge, either from Ikoyi end to the other or Lekki end to the other, thereby, eliminating the present traffic rush being experienced on daily basis on Lekii Epe Expressway.

Technical details of the bridge obtained from the state Ministry Works and Infrastructure shows as follows: total length of bridge – 1.358km comprising of 722m approach and main bridge 466m; length of cable- 170m (suspended section). Eight of pylon: 87m from water level; navigational requirement clearance average of 9m above high water level.

Width is 16m across (8m on both sides); walkway – 4m across (2m on both sides); road works- Ikoyi end – 338. 7m while Lekki end is 311.5m.


OTHER LINK BRIDGES IN FOCUS

According to reliable sources, the state is planning another link bridge from Ojodu-Berger to Ikorodu to Isawo with a stop at Ikorodu. “But the construction will be tough, because the alignment is built up and the compensation will be high. So we are looking at various options,” the source said.


http://www.vanguardngr.com/2012/10/ikoyi-lekki-link-bridge-ready-soon/

3 Likes

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by TonySpike: 12:58pm On Oct 02, 2012
This bridge design by LASG is a good example on how the Federal Government should run projects. Project delivery period must not be compromised because of corruption. OP, can you get us more pictures?

2 Likes

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by EkoAtlantic1(f): 1:21pm On Oct 02, 2012
Let them know.

Eko oni baje lailai !!! cool

5 Likes

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by Jisunpack: 2:10pm On Oct 02, 2012
This is what is making other people hate BRF! They hate him because when he set out to do something, he does it quietly and allow people to see the changes physically.

Eko oni ba je oooo! Lai Lai!!!!!!!!.

15 Likes

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by Afam4eva(m): 2:19pm On Oct 02, 2012
The bridge looks cool.
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by Nobody: 2:22pm On Oct 02, 2012
Is the bridge toll free?

2 Likes

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by daywatcher: 2:23pm On Oct 02, 2012
Good job. Ok when are they starting 4th mainland bridge?
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by Bawss1(m): 2:26pm On Oct 02, 2012
Another win for Lagos

Well done Fashola
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by icydoc: 2:26pm On Oct 02, 2012
nice one.pls show us more pics.

1 Like

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by AjanleKoko: 2:27pm On Oct 02, 2012
feature11: Is the bridge toll free?

Very tolled undecided

I am willing to bet it will be more expensive than the Lekki Toll. Makes sense, else there will be permanent holdup on that bridge.

3 Likes

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by nairawall: 2:29pm On Oct 02, 2012
Pls upload more pictures. The bridge looks fine.
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by meksroland: 2:29pm On Oct 02, 2012
With all those money made in Lagos state, are we suppose to be celebrating?? How about Ejigbo and other places? The difference between Lagos and other states is just that Fashola receives too much press praise and being favoured by dem also. Amechi still remains the best gov cos u don't experience flood anywhere in PH now cos he constructed deep underground gutters. Fashola is working as far as press is concerned

2 Likes

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by Nobody: 2:30pm On Oct 02, 2012
daywatcher: Good job. Ok when are they starting 4th mainland bridge?
Ask GEJ
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by Gbawe: 2:31pm On Oct 02, 2012
afam4eva: The bridge looks cool.

Very cool.

http://www.cometonigeria.com/travel-news-and-events/under-construction/under-construction-lekki-ikoyi-cable-bridge



Under construction: Lekki-Ikoyi Cable Bridge
BY ADEYEMI ADISA · DECEMBER 6, 2011 · NO COMMENTS 1,621 VIEWS



The Lekki-Ikoyi Cable Bridge is going to be one of the first major cable stayed bridges to be built in West Africa when completed by the year 2012.

The 1.4km long bridge with a cable stayed pylon of 90m the middle and a full span approach and departing bridge linking Admiralty Way to Bourdillon Road.

The Lekki-Ikoyi Cable Bridge located in the metropolis of Lagos, one of the most populous cities in the world, will connect two heavily congested districts, thereby relieving city traffic.

The plans for Nigeria’s first cable-stayed bridge were drawn up by design specialists from Bilfinger Berger Nigeria GmbH.

The structure comprises a 700-meter full-span approach bridge. Connected to this is a segmental bridge of more than 600 meters in length, at the center of which is a 91-meter high pylon.
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by vanstanzy(m): 2:32pm On Oct 02, 2012
Tax payers money in action in Lagos. "LAGOS IS WORKING, FASHOLA IS WORKING"! grin grin grin While PDP is gnashing their teeth. grin grin
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by killuminati(m): 2:32pm On Oct 02, 2012
daywatcher: Good job. Ok when are they starting 4th mainland bridge?
on ur birthday fool
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by Abagworo(m): 2:35pm On Oct 02, 2012
Nice one
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by Gbawe: 2:36pm On Oct 02, 2012
meksroland: With all those money made in Lagos state, are we suppose to be celebrating?? How about Ejigbo and other places? The difference between Lagos and other states is just that Fashola receives too much press praise and being favoured by dem also. Amechi still remains the best gov cos u don't experience flood anywhere in PH now cos he constructed deep underground gutters. Fashola is working as far as press is concerned

There are some threads where you guys should simply leave out this comparison thingy. It's not classy and only shows a lack of grace.

5 Likes

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by lookmangiw(m): 2:44pm On Oct 02, 2012
In a country where we have a lot of right thinking people. This fashola guy would have been a topshot to the president come the next election year. But not in this country, where tribal sentiment and ethnic bigotry prevails over other things.

11 Likes

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by ijo4lite(m): 2:46pm On Oct 02, 2012
wow! Kudos to Fashola
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by Nobody: 2:46pm On Oct 02, 2012
If only he was our president cry

3 Likes

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by Akanbiedu(m): 2:47pm On Oct 02, 2012
Gbawe:

There are some threads where you guys should simply leave out this comparison thingy. It's not classy and only shows a lack of grace.
Abi oo.

No need for comparison. Each state should be able to determine what it wants.
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by vanstanzy(m): 2:48pm On Oct 02, 2012
740megawatts: BY OLASUNKANMI AKONI

MOTORISTS along Ikoyi, Lekki-Epe axis will soon heave a sigh of relief as the first ever cable styled bridge of its kind in the sub Saharan West Africa region – Lekki-Ikoyi Link Bridge, has reached 95 percent stage of completion.

The link bridge project is sponsored by Governor Babatunde Fashola administration in Lagos State and being constructed by the construction giant, Julius Berger Plc.

he project was conceived in 2008, as solution to the perennial bottleneck on the Lekki- Epe road being serviced by only one access road.

Therefore, people of the highbrow choice area and the adjoining Victoria Island will soon witness a tremendous and pleasurable driving experience upon completion of the link bridge which will cause a relief from the daily traffic challenges the residents face trying to connect either Ikoyi or Lekki through Falomo Bridge, Alfred Rewane Road or Lekki-Epe Road.

Femi Hamzat, Lagos State commissioner for Works and Infrastructure, described it as historic, noting: “No doubt it is a testament to the sagacity of an administration determined to build tomorrow’s infrastructure today. It is the hallmark of a commitment to the welfare and socio-economic wellbeing of its people.”

When Vanguard Newspaper visited the site recently, it was gathered that the level of work had reached over 95 percent and according to Hamzat the target is to commission it before the end of this year, specifically first week in November.

The aesthetic bridge is a standard megacity compliant facility. It is to serve as a strategic bypass along the Falomo Bridge and Alfred Rewane, Independence Bridge and Ahmadu Bello Way.

Designed as dual carriageway, the bridge directly connects Lekki Phase I Estate with Alexander in Ikoyi. It is envisaged that on completion it would improve the living standard of the people and enhance social interaction, as it represents a significant content in the state’s tourism portfolio.

“The infrastructures provided must not only reflect present realities but also envisage future growth trends,” Hamzat stated, adding that it will also reduce travel time, save man-hour loss by motorists.

Moreover, the link bridge is expected to reduce the traffic on Lekki-Epe Toll Gates, as motorists who do not have any business along the axis would have the option of going through the link bridge, either from Ikoyi end to the other or Lekki end to the other, thereby, eliminating the present traffic rush being experienced on daily basis on Lekii Epe Expressway.

Technical details of the bridge obtained from the state Ministry Works and Infrastructure shows as follows: total length of bridge – 1.358km comprising of 722m approach and main bridge 466m; length of cable- 170m (suspended section). Eight of pylon: 87m from water level; navigational requirement clearance average of 9m above high water level.

Width is 16m across (8m on both sides); walkway – 4m across (2m on both sides); road works- Ikoyi end – 338. 7m while Lekki end is 311.5m.


OTHER LINK BRIDGES IN FOCUS

According to reliable sources, the state is planning another link bridge from Ojodu-Berger to Ikorodu to Isawo with a stop at Ikorodu. “But the construction will be tough, because the alignment is built up and the compensation will be high. So we are looking at various options,” the source said.


http://www.vanguardngr.com/2012/10/ikoyi-lekki-link-bridge-ready-soon/


If Nigerian politicians saddled with the responsibility of leading their people, worked tirelessly and delivered projects like this, Nigeria and her masses would be the better for it. But instead its me, myself and, my family syndrome that's the order of the day amongst them.
Criminal minds were brought up in/ under criminal backgrounds. I bet Fashola has a great family background and is a wonderful family man. Don't ask me how i know, the result shows. grin grin grin

1 Like

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by SkyBlue1: 2:50pm On Oct 02, 2012
Good job! Actions speak louder than words.
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by Demdem(m): 2:57pm On Oct 02, 2012
Thank God it has no resemblance to what Odili built for us here in PH.

3 Likes

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by jmaine: 2:59pm On Oct 02, 2012
This is lovely cool
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by Nobody: 2:59pm On Oct 02, 2012
meksroland: With all those money made in Lagos state, are we suppose to be celebrating?? How about Ejigbo and other places? The difference between Lagos and other states is just that Fashola receives too much press praise and being favoured by dem also. Amechi still remains the best gov cos u don't experience flood anywhere in PH now cos he constructed deep underground gutters. Fashola is working as far as press is concerned
The topic said Ikoyi-Lekki bridge to be commisioned by december, not comparing the achievement of the pacesetter and only government in Nigeria to Amaechi's Port harcourt. You can kindly open another thread for that if you can prove it that Amaechi is working. Besides not only the press are commending him,the whole world knows the impact of his administration on the residents of lagos state both home and abroad.

1 Like

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by omowolewa: 3:00pm On Oct 02, 2012
This is good men!
There is no need for good governance tour. We can see the work done. Thank God for the progressive minds
Helicopter view please!
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by alaoeri: 3:00pm On Oct 02, 2012
This & more are the reasons why some ppl are beefing BRF, instead of them to be criticising their state governors they 'll run to NL to criticise a working governor. If only other governors 'll emulate this Nigeria 'll have been shaping my now.

2 Likes

Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by omowolewa: 3:01pm On Oct 02, 2012
.
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by SkyBlue1: 3:01pm On Oct 02, 2012
I have seen better pictures of the bridge weeks ago (just can't be bothered to post it). The pictures up there do not capture the scale.
Re: Ikoyi-lekki Link Bridge To Be Commissioned By November by kaeto(m): 3:03pm On Oct 02, 2012
If ACN is willing, with all due respect, we from the S.east 'must' swallow our pride and join forces with them. It almost happened in my state, Abia, in 2011 guber polls,were ACN's candidate was more prefered. Fashola could step up his game and become the president for good. I have waited long enough for good governance and I know you are completely out of patience too. This much needed and awaited change must come with a level of sacrifice,my opinion though.

10 Likes

(1) (2) (3) (4) (Reply)

Shout-out To "Civilian JTF" In Borno / PDP Has Confirmed That Their Governors Have Deserted Them — Festus Keyamo / Tinubu Sacked 10,000 Workers As Lagos Governor - Socialist Labour

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 39
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.