Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 3:54pm On Oct 16, 2014 |
twinskenny:Bros. No be small things |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by Onuokwu: 5:05pm On Oct 16, 2014 |
segcymoor: What is going to be in that space under the concrete? Blocks? This is unlike that your last project where concrete was used from floor to up. |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by Nobody: 5:17pm On Oct 16, 2014 |
Onuokwu:I have also wondered if that place you refer to will be rafted. I suspect so anyway. Money speaking. |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by kopell: 7:03pm On Oct 16, 2014 |
Watching on the side line oh, I thought it a bridge house oh. My note book is here with me sha. |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 7:18am On Oct 17, 2014 |
Onuokwu: fem30: That is one of the different between raft and piling foundation. The Pilling is being designed to be suspended. However, we intend to raft the external beam later. |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 2:21pm On Oct 17, 2014 |
Concrete
|
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 2:24pm On Oct 18, 2014 |
Formwork
|
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 4:08pm On Oct 20, 2014 |
Formwork and reinforcement in progress!
|
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 3:32pm On Oct 21, 2014 |
Formwork in progress! |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 12:09pm On Oct 22, 2014 |
2nd phase casting in progress!
|
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 9:33pm On Oct 22, 2014 |
Completion of piling with pile cap and beam.
|
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 1:15pm On Oct 24, 2014 |
Upnext:filling process |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 7:11am On Oct 28, 2014 |
Removal of formwork.
|
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 7:15am On Oct 28, 2014 |
Removal of formwork: piling with pile cap and beam
|
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by Nobody: 11:01am On Oct 28, 2014 |
Wow..secgy that pile is clever,I guess it is cost efficient as well. Good thinking.well done. |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 5:17pm On Oct 28, 2014 |
euromilion:Not really. On the high side compare to raft. But the best ooption |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 10:43pm On Oct 29, 2014 |
Update:Filling work in progress! |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 11:32pm On Oct 31, 2014 |
MOORE-DESIGNBUILD LTD......We do structure right! |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 2:54pm On Nov 03, 2014 |
segcymoor: |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by HOTARIO(m): 4:14pm On Nov 03, 2014 |
I kept starring at that pile and could not stop wondering how much this maze of reinforcement and concrete cost. Like Boys' scouts one has to be prepared! Nice job done. An idea of how much spent on this stage of work? |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 8:37pm On Nov 03, 2014 |
HOTARIO:less than 7m |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 4:29pm On Nov 07, 2014 |
Filling work in progress!
|
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by babalose: 6:48pm On Nov 07, 2014 |
segcymoor: BUT IF IT WAS A 5 BEDROOM DUPLEX....WILL THE PILING COST LESS? |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 5:19pm On Nov 08, 2014 |
babalose:Absolutely! |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by leftone: 10:16am On Nov 10, 2014 |
lovely job you doing here bro...am very impressed. |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 8:06pm On Nov 10, 2014 |
leftone:Thanks. ...no be small things o |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by Onuokwu: 6:02pm On Nov 11, 2014 |
I sent you a mail.... |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by jodeci01: 10:55pm On Nov 11, 2014 |
Oga Segcy, Late student checking in....Biko design and plot size of this project missing on page 1...thanks |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 2:03pm On Nov 12, 2014 |
jodeci01: We are not responsible for the design and the plot size is standard plot (600sqm) |
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by segcymoor(m): 5:54pm On Nov 13, 2014 |
Filling work in progress!
|
Re: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by HOTARIO(m): 6:01pm On Nov 13, 2014 |
Good work. How many trips of filling sand is projected for this filling, going by 20tons per trip. |
(1) (2) (3) ... (7) (8) (9) (10) (11) (12) (13) ... (40) (Reply)
Do I Mold Blocks Or Buy It? Please Advice. / Owerri Collapsed Building: Before And After Photos / Bizarre 'Pyramid-Shaped' 18-Storey Building In China Becomes Internet Sensation
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 17 |