Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,155,669 members, 7,827,458 topics. Date: Tuesday, 14 May 2024 at 12:21 PM

PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI - Properties (11) - Nairaland

Nairaland Forum / Nairaland / General / Properties / PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI (53554 Views)

Construction Process Of A 6 Flats (3 Bedrooms House) / ABUJA:CONSTRUCTION PROCESS OF TERRACE BUILDING BY MOORE / Construction Process Of The 3 Bedroom Block Of Four Flats In Warri (2) (3) (4)

(1) (2) (3) ... (8) (9) (10) (11) (12) (13) (14) ... (43) (Reply) (Go Down)

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:42am On Jul 21, 2016
MOORE-DESIGNBUILD LTD
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by Chekitaut: 10:27am On Jul 21, 2016
Offer while stock last!
Buy 60tons of Granite get 30tons stonedust free.

Call: 08055545355, 08032887233, 08098055224
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:31pm On Jul 21, 2016
Chekitaut:
Offer while stock last!
Buy 60tons of Granite get 30tons stonedust free.
Call: 08055545355, 08032887233, 08098055224
Offer till when?
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by Chekitaut: 2:47am On Aug 01, 2016
From August 1st, 2016
Lagos Island, Ikoyi, Victoria Island, Banana Island, Lekki - Ajah(Round about)
OFFER while STOCK last
Buy 30tons GRANITE + 30tons Stone dust @ N220,000

Granite Booking
Call: 08055545355, 08032887233
Text: 08055545355, 08032887233, 08098055224, 08025392565.
Whatsapp: 08055545355, 08032887233
BBM Pin: 2BF3D3FE
Email: info.chekitaut@gmail.com

Our Buy 60tons Granite get 30tons Stone dust FREE still available
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 4:58pm On Aug 04, 2016
MOORE-DESIGNBUILD LTD





.--------
We are coming but in new dimension

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:47pm On Dec 25, 2016
We like to wish u a Merry Xmas and happy new year
From d team: MOORE-DESIGNBUILD LTD
.......we do structures right!
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 10:24pm On Jan 30, 2017
....we do structures right!
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by megacontrol(m): 7:22am On Apr 02, 2018
segcymoor:

Basically., the Piling is being designed to be suspended but we decided to fill it up

How could the original plan of "suspended" be done? Does that eliminate the need to sand-fill up to the pile tie beam level?
I'll like to understand.
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by megacontrol(m): 7:24am On Apr 02, 2018
How do you mean?
Is sand filling optional? how could the pilling and foundation be completed without sand filling before the super structure stage commences?

cleric:

Any reason for this change of mind? I suspect it would have worked but looking at the cost of the decking against the sand filling, it might not be a bad idea to simply sand fill. Kindly correct me if I am wrong. Very tidy job sir.

By the way I can see you are still in the art of taking a walk on ur reinforcements. wink
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 9:02am On Apr 05, 2018
megacontrol:


How could the original plan of "suspended" be done? Does that eliminate the need to sand-fill up to the pile tie beam level?
I'll like to understand.
Absolutely! If original concept is adopted.. No need for filling
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 10:49pm On Jun 11, 2020
...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 8:44am On Jun 12, 2020
...

...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 11:43am On Jun 13, 2020
...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 7:58pm On Jun 13, 2020
...
..
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 8:16am On Jun 15, 2020
...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 9:25am On Jun 16, 2020
...
...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 8:43am On Jun 18, 2020
....
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by Bodlade(m): 1:26pm On Jun 18, 2020
Call Impact Quality Blocks for your construction blocks & cement supply within and around Redeem camp & we’ll deliver to your site.
08020535537, 08077257811.

1 Like

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 8:03pm On Jun 18, 2020
Bodlade:
Call Impact Quality Blocks for your construction blocks & cement supply within and around Redeem camp & we’ll deliver to your site.
08020535537, 08077257811.

Noted!

1 Like

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 5:10pm On Jun 19, 2020
...

1 Like

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 4:48pm On Jun 20, 2020
...
...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 4:18pm On Jun 21, 2020
....
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 10:02am On Jun 22, 2020
...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 4:06pm On Jun 23, 2020
....
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 9:58am On Jun 24, 2020
...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 11:09am On Jun 25, 2020
..
...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 8:44am On Jun 26, 2020
...
....
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 8:26am On Jun 28, 2020
...
...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 7:56pm On Jun 29, 2020
...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 9:06am On Jun 30, 2020
Our concept...

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 8:37am On Jul 01, 2020
MOORE...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by abbatoir(m): 8:37am On Jul 03, 2020
DESIGNBUILD...

(1) (2) (3) ... (8) (9) (10) (11) (12) (13) (14) ... (43) (Reply)

Chelsea Estate In Ajah Lagos: John Mikel Obi Is Building It... / See The Tallest Building In Africa / Building My Three (3) Bedroom Flat

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 13
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.