Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,151,301 members, 7,811,897 topics. Date: Sunday, 28 April 2024 at 10:36 PM

PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI - Properties (8) - Nairaland

Nairaland Forum / Nairaland / General / Properties / PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI (53274 Views)

Construction Process Of A 6 Flats (3 Bedrooms House) / ABUJA:CONSTRUCTION PROCESS OF TERRACE BUILDING BY MOORE / Construction Process Of The 3 Bedroom Block Of Four Flats In Warri (2) (3) (4)

(1) (2) (3) ... (5) (6) (7) (8) (9) (10) (11) ... (43) (Reply) (Go Down)

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:57pm On Sep 23, 2015
darlingdadon:
Mr. Sege, Am also a Civil Engineer operating here in Lagos, I guess we can do business together, Youre doing a great job. Am a consulting engineer, but majored on Highrise and Road projects. I currently have a site at plot 218 in Banana Island am managing as a Civil/Structural Engineer on the site. Keep it up
Ha! Endorsed by consulting engr? working for big boys?



.........I am humble. ..
will be glad working together bro

1 Like

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:08pm On Sep 23, 2015
Done deal!

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:50pm On Sep 24, 2015
Bakkah dah sallah

1 Like

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:02pm On Sep 25, 2015
Our concept!

1 Like

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by Tombrook0: 5:57pm On Sep 25, 2015
Tomrich Engineering services is a company that specialises in providing solutions and quality services in the construction and civil works

Our area of specialities includes

Floor and concrete problem solution

Construction of self cleaning industrial drainage

Independent site engineering and supervision

Provision of floor leveling screed

Installation of water resistant Epoxy mortar and coats toppings

Remediation of damaged floor

Construction of structural members

POP (screed and decorative cornice )

Erections of building structures

Aluminum and glass doors

Our contacts:

Call: 08060421843

Whats app: 08026589656

Email: tomrichengs@hotmail.com

Contact us today and experience good and quality service delivery.
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:08am On Sep 26, 2015
Tombrook0:
Tomrich Engineering services is a company that specialises in providing solutions and quality services in the construction and civil works

Our area of specialities includes

Floor and concrete problem solution

Construction of self cleaning industrial drainage

Independent site engineering and supervision

Provision of floor leveling screed

Installation of water resistant Epoxy mortar and coats toppings

Remediation of damaged floor

Construction of structural members

POP (screed and decorative cornice )

Erections of building structures

Aluminum and glass doors

Our contacts:

Call: 08060421843

Whats app: 08026589656

Email: tomrichengs@hotmail.com

Contact us today and experience good and quality service delivery.
ok o.we Don hear
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by Aventures(m): 12:29pm On Sep 27, 2015
Good job to the ironbender for arranging the cantilever reinforcement to details. kudos
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:44pm On Sep 27, 2015
Aventures:
Good job to the ironbender for arranging the cantilever reinforcement to details. kudos
Bros..I will deliver your message to am o.
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:54pm On Sep 28, 2015
We are able to achieve strong and compact concrete

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 11:27pm On Sep 30, 2015
We proceed.......

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:25am On Oct 02, 2015
segcymoor:
We proceed.......

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:21pm On Oct 05, 2015
Block work in progress

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:39pm On Oct 06, 2015
In the process
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 2:38pm On Oct 08, 2015
segcymoor:
In the process

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by temmy6996(m): 6:47pm On Oct 08, 2015
segcymoor:
In the process
9c job oga segzy. I realised in ur reinforcement work, there r some irons being laid diagonally. What is the work of the iron and is it mandatory to put it where u have cantilever?
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:56pm On Oct 08, 2015
temmy6996:
9c job oga segzy. I realised in ur reinforcement work, there r some irons being laid diagonally. What is the work of the iron and is it mandatory to put it where u have cantilever?
Absolutely. It's necessary. Inner beam.
it actually serve structure purpose
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:56pm On Oct 08, 2015
temmy6996:
9c job oga segzy. I realised in ur reinforcement work, there r some irons being laid diagonally. What is the work of the iron and is it mandatory to put it where u have cantilever?
Absolutely. It's necessary. Inner beam.
it actually serve structure purpose!
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:10pm On Oct 09, 2015
View

1 Like

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:19pm On Oct 14, 2015

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:49am On Oct 15, 2015
https://www.nairaland.com/1029190/construction-process-terrace-building-block/42
Something new is in progress!......It is d fastest project to experience!
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:34am On Oct 16, 2015
Columns lintels work in progress

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:31pm On Oct 20, 2015
View

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:39pm On Oct 21, 2015
Update:Taking level to roof beam
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by olawale100: 10:30am On Oct 22, 2015
This may interest the builders in the house.

BUILDMACEX - exhibition of building materials.

Ongoing at EKO HOTEL today, 22nd October is the last day.

Enjoy..
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 1:52pm On Oct 23, 2015
olawale100:
This may interest the builders in the house.
BUILDMACEX - exhibition of building materials.
Ongoing at EKO HOTEL today, 22nd October is the last day.
Enjoy..
Ok
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 2:25pm On Oct 26, 2015
View

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by mavverick: 3:26pm On Oct 26, 2015
Welldone Sege.

See how decking came out nicely needing minimal plastering, just such a shame that Brabus defrauded me as this is what I was sold, and look at the nonsense he did.

2 Likes

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 3:14pm On Oct 27, 2015
Fencing work

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:08pm On Nov 03, 2015
Views

1 Like

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:02pm On Nov 15, 2015
Update:Construction of fence/ gate house in progress
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by Farm1: 6:30am On Nov 16, 2015
segcymoor:
View

Wao, this cantilever is wide. It takes great skills to achieve a stable cantilever that is this wide and load bearing....

I throw salute.

I wish I can learn how u achieve this
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 12:46pm On Nov 16, 2015
Farm1:


Wao, this cantilever is wide. It takes great skills to achieve a stable cantilever that is this wide and load bearing....

I throw salute.

I wish I can learn how u achieve this
Really. This is actually less than 4 ft......it takes good structural attention and good concrete grade



---------
Watch out for similar projection in our on going terrace building

(1) (2) (3) ... (5) (6) (7) (8) (9) (10) (11) ... (43) (Reply)

Tenants Flee House After 10 Co-tenants Died In Two Years (photo) / That’s Not Inside The Abuja Mansion Of Africa’s Richest Man, Dangote / See The Tallest Building In Africa

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 21
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.