Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,231 members, 7,818,778 topics. Date: Monday, 06 May 2024 at 02:44 AM

Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu - Properties (4) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu (11630 Views)

6 Bedroom Contemporary Smart Duplex - Isheri North / Building A Fence On A Plot Of Land In Rural Enugu State: Costs And Challenges / KNOW THE COST OF YOUR BUILDING PROJECT TODAY-GET YOUR BOQ &BUILDING ESTIMATES (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply) (Go Down)

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 7:51pm On Jan 20, 2023
More updates as we move along..........

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 7:55pm On Jan 20, 2023
More as we continue to buy filling sand for this foundation...........

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by tivta(m): 7:54am On Jan 21, 2023
spyder880:
More as we continue to buy filling sand for this foundation...........

Like how much has been spent so far?
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 8:51am On Jan 21, 2023
tivta:


Like how much has been spent so far?

Still checking, I will update the house after the foundation stage.
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by tivta(m): 2:32pm On Jan 21, 2023
spyder880:


Still checking, I will update the house after the foundation stage.

Thanks.
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 6:01am On Jan 22, 2023
Foundation filling with laterite soil...........

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 6:03am On Jan 22, 2023
Front of the foundation as at yesterday.........

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 6:07am On Jan 22, 2023
Only very few rooms has been filled, this foundation may still take up to 30 trips of sand to get filled. ...........

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 6:18am On Jan 22, 2023
Buying more wood for the foundation beams..........

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 10:27pm On Jan 26, 2023
We have continued to buy a lot more filling sand and cheap them into this foundation .........

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 10:31pm On Jan 26, 2023
The way the foundation looks as at now..........

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 10:56pm On Jan 26, 2023
More pictures

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 8:49am On Jan 27, 2023
Foundation filling works, stocking up on more building materials ongoing at this site today..........

More pictures later.
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 5:42am On Jan 31, 2023
Filling of this foundation is almost completed, more pictures later today.
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by Arijude(m): 7:11pm On Jan 31, 2023
spyder880:
Delivering more sand to this site yesterday.........
how much did you buy a trip of this sand and is it good for moulding block?
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 7:51pm On Jan 31, 2023
Arijude:
how much did you buy a trip of this sand and is it good for moulding block?

N28,000,, perfect for molding blocks.
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by Arijude(m): 11:59pm On Jan 31, 2023
spyder880:


N28,000,, perfect for molding blocks.
ok thank you
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 6:05am On Feb 01, 2023
We have completed the filling of this foundation, we are set to treat the soul with water for better compaction later today..............

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by Mariomadiba(m): 1:12am On Feb 04, 2023
Following

1 Like

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 11:51am On Feb 04, 2023
Mariomadiba:
Following

Welcome.
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by tivta(m): 6:47pm On Feb 04, 2023
spyder880:


Welcome.

I miss the days where for every post you make you include the total cost so far, perhaps it has become too cumbersome
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 7:20pm On Feb 04, 2023
tivta:


I miss the days where for every post you make you include the total cost so far, perhaps it has become too cumbersome


A lot. Plus the fact that I now buy some materials in bulk, and store on site, monitoring each days usage of materials wont be easy without a dedicated staff writing down daily usages.
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 7:21pm On Feb 04, 2023
We are set to cast this concrete course by tomorrow and on Monday. More pictures later.
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 11:21pm On Feb 04, 2023
We had to pond this foundation, the process of using water to flood the foundation so that soils can sink in and compact firmly for a hard floor.

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 11:22pm On Feb 04, 2023
More pictures.........

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 2:06pm On Feb 06, 2023
Haven seen the full picture of the costs of doing this foundation, as all the works are nearly completed, all costs paid for and every materials accounted for, I think I have the total costs of building this foundation till the cast of the DPC which is currently ongoing to completion. We have spent the following monies on both materials, workmanship and supervision of this stage of the project. Please feel free to ask me any questions about any of the materials, or lump sum which I allocated to some stages. Thanks.

1. Cost of removal of old house N10,000
2. Pegging materials/ wheel barrow N66,750
3. Cement (175) x 2543 = N445,025
4. 9" blocks (2275) 260 = N591,000
5. Trips of Sharp sand (14) 28,000 = N392,000
6. Chippings (2) 160,000 = N320,000
7. Local gravel (4) 53,000 = N212,000
8. Filling sand (32) 25,000 = N800,000
9. 16mm rods (18) 8500 = N153,000
10. 12mm rods (63) 4800 = N302,400
11. 8mm rods (35) 2500 = N87,500
12. Binding wire (1) N15,500
13. All transportation N109,600
14. Water supply N112,000
15. Wooden planks N64,000
16. Workmanship/Supervision N1,119,950

Total N4,801,225.00

4 Likes 3 Shares

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by tivta(m): 6:26pm On Feb 06, 2023
spyder880:
Haven seen the full picture of the costs of doing this foundation, as all the works are nearly completed, all costs paid for and every materials accounted for, I think I have the total costs of building this foundation till the cast of the DPC which is currently ongoing to completion. We have spent the following monies on both materials, workmanship and supervision of this stage of the project. Please feel free to ask me any questions about any of the materials, or lump sum which I allocated to some stages. Thanks.

1. Cost of removal of old house N10,000
2. Pegging materials/ wheel barrow N66,750
3. Cement (175) x 2543 = N445,025
4. 9" blocks (2275) 260 = N591,000
5. Trips of Sharp sand (14) 28,000 = N392,000
6. Chippings (2) 160,000 = N320,000
7. Local gravel (4) 53,000 = N212,000
8. Filling sand (32) 25,000 = N800,000
9. 16mm rods (18) 8500 = N153,000
10. 12mm rods (63) 4800 = N302,400
11. 8mm rods (35) 2500 = N87,500
12. Binding wire (1) N15,500
13. All transportation N109,600
14. Water supply N112,000
15. Wooden planks N64,000
16. Workmanship/Supervision N1,119,950

Total N4,801,225.00

Wow, nice one. Please what do you mean by DPC?
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 6:32pm On Feb 06, 2023
tivta:


Wow, nice one. Please what do you mean by DPC?

The Damp Proof Course, otherwise known in Nigeria as the "German floor"
Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by tivta(m): 10:17pm On Feb 06, 2023
spyder880:


The Damp Proof Course, otherwise known in Nigeria as the "German floor"

Oh, thanks, I just learnt something new, here I was thinking it meant a type of roof

1 Like

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by medoty: 12:32pm On Feb 07, 2023
Thank you for the update Sir. We will continue to follow for more updates and hopefully you will find time to do costs update for duplex to DPC.

The cement cost, I am confused because it is 4k plus in other places.

spyder880:
Haven seen the full picture of the costs of doing this foundation, as all the works are nearly completed, all costs paid for and every materials accounted for, I think I have the total costs of building this foundation till the cast of the DPC which is currently ongoing to completion. We have spent the following monies on both materials, workmanship and supervision of this stage of the project. Please feel free to ask me any questions about any of the materials, or lump sum which I allocated to some stages. Thanks.

1. Cost of removal of old house N10,000
2. Pegging materials/ wheel barrow N66,750
3. Cement (175) x 2543 = N445,025
4. 9" blocks (2275) 260 = N591,000
5. Trips of Sharp sand (14) 28,000 = N392,000
6. Chippings (2) 160,000 = N320,000
7. Local gravel (4) 53,000 = N212,000
8. Filling sand (32) 25,000 = N800,000
9. 16mm rods (18) 8500 = N153,000
10. 12mm rods (63) 4800 = N302,400
11. 8mm rods (35) 2500 = N87,500
12. Binding wire (1) N15,500
13. All transportation N109,600
14. Water supply N112,000
15. Wooden planks N64,000
16. Workmanship/Supervision N1,119,950

Total N4,801,225.00

2 Likes

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 5:52pm On Feb 07, 2023
medoty:
Thank you for the update Sir. We will continue to follow for more updates and hopefully you will find time to do costs update for duplex to DPC.

The cement cost, I am confused because it is 4k plus in other places.


Very valid observation. I made a mistake there. It's one of the problems of buying in bulk and checking costs later. I actually bought the first 150 bags at N4200 and the second batch of 75 bags at 4,600. When I wanted to calculate, I used N2543 as average cost instead of N4257.14. The total cost should have been 745,000 for all cement used. I will correct the budget now. Thank you.

1 Like

Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(m): 5:58pm On Feb 07, 2023
1. Cost of removal of old house N10,000
2. Pegging materials/ wheel barrow N66,750
3. Cement (175) x 4,257.14 = N745,000
4. 9" blocks (2275) 260 = N591,000
5. Trips of Sharp sand (14) 28,000 = N392,000
6. Chippings (2) 160,000 = N320,000
7. Local gravel (4) 53,000 = N212,000
8. Filling sand (32) 25,000 = N800,000
9. 16mm rods (18) 8500 = N153,000
10. 12mm rods (63) 4800 = N302,400
11. 8mm rods (35) 2500 = N87,500
12. Binding wire (1) N15,500
13. All transportation N109,600
14. Water supply N112,000
15. Wooden planks N64,000
16. Workmanship/Supervision N1,119,950

Total N5,000,700.00

The above is the corrected estimates for this foundation. More pictures later.

2 Likes 1 Share

(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply)

For Sale Land Measuring 550sqm at Milk & Honey Estate Lugbe, Abuja 09058818181 / Fire Accident Occur At Shibiri Ojo, Lagos (photos) / Occupants Of Rented Apartments !!! Why This Attitude? As In Why??.?

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 33
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.