dejavus:Not an expert, but I don't see why not. The concrete floor needs to be perfectly level and a vapor barrier needs to be put down before the laminate. There are some that are made for wet areas and I think those will be best because of the climate. Personally, I wouldn't use laminate flooring because it is not as durable as tile. |
AyeMaDaFunMi:Any knowledgeable engineer available to offer their thoughts on this breakdown? |
goldcorn:I know construction is in stages. What I want to know is what can I do to build a house to completion, but doing a project every 6-12 months? Can exposed/untreated concrete and steel retain their strength for 12 months? I'm thinking maybe.. Phase 1: DPC ... wait 6-12 months or until funds are ready Phase 2: German floor and plumbing ... wait Phase 3: 1st floor walls to lintel ... wait Phase 4: Decking and plumbing ... wait Phase 5: 2nd floor walls to lintel ... wait Phase 6: Decking/roofing and plumbing Phase 7: Windows and door ... wait Phase 8: Electrical ... wait Phase 9: Plastering ... wait Phase 10: Tiling ... wait Phase 11: Painting |
Hello good people. If you plan to build a duplex in stages because the funds for the entire project is not yet available, how will you identify the various phases to ensure the integrity of the structure is not comprised? Maybe a phase can be completed every 6 months - 1 year. Thanks in advance. |
princejones:Aluminum roofing sheet? |
rotecch77:I read it wrong. That is not the total. Below is the breakdown. Iron materials = 37K Carpenter = 20K Cement = 22,500 Bricklayer = 15K Total = 94,500 Does "Iron Bender" include material and workmanship? Iron bender (iron, binding wire etc) 25-30k |
rotecch77:Interesting. I was given a quote of 38K total in Ibadan. |
rotecch77:Please, can you let me know what a rough estimate for material and workmanship is to install a double gate? I've already purchased the gate so I'm expecting an estimate in the next day or so to have it installed. They need to build the pillars and everything else involved in installing the gate. I just want to make sure the pricing I receive is around what someone should be expecting to pay. Thank you in advance. |
What is the normal charge for materials and labor to install a gate? I only have a gate. I need everything else. |
gordonbarrett:Bros. How much did you pay/charge for labor and materials to install the gate. I have a gate and need it installed so I want to compare it with the estimate I will receive. I don’t have pillars to mount the gate on. |
segzy14:No. I was told they are waiting for it to dry. |
They call this clearing the bush. I feel ripped off.
|
segzy14:Has pricing for this gone up? I was just quoted 10K total to cut down bush on 2 plots in Ibadan. All they will do is chop it and then burn it.
|
is it less expensive to go with a tiled roof or use concrete slab? I like the look of flat roofs, but I think it’s less expensive to use a tiled roof. Is it possible to use a tiled roof on a slighted sloped void? I think this will give the look of a flat roof but will use tiled. Easier to maintain and longer lasting. |
saydfact:Thank you for your reply! |
darenyx:Thank you for your prompt reply. |
darenyx:Like magic. Are you able to share how the tank was sunk? |
darenyx:Why do you need to ensure it's the highest around? |
darenyx:So how do you remove all the cut bush from the land? |
. |
This picture closesly shows what I attempted to describe above. In stead of 1 bar going up through the blocks, it will be starter bars.
|
Rubbiish:You answered my question as stated, but unfortunately I didn't explain properly and used the wrong terminology. That is my fault. Not columns. I meant the posts that are in corners of adjoining walls or long spans of walls like shown in the Shoprite example shared by @saydfact. Shoprite example - https://www.nairaland.com/4133188/construction-6self-contain-hostel-frm-start/5#61717032 |
Reading through your post has been very educational @saydfact. Thank you. I have 2 questions I hope you will entertain. 1. Is there any cost savings in laying plumbing pipes prior to pouring concrete? Would require precise measurements to ensure pipes for toilets, showers, etc. are in the correct locations. 2. I've been thinking about another approach for columns. It will be difficult to describe so hopefully you'll catch what I'm describing. Instead of forming the column by placing blocks on 2 sides and then securing planks on the remaining 2 sides, would there be cost savings in placing the blocks in a pattern so that the re-bar goes through the blocks and then pour concrete into the opening? |
What are the "proper documentations"? |
Dream369:What materials do you have? Do you already have the text for the newsletter or do you need the text composed and the newsletter designed? Will the newsletter be printed and delivered or emailed to your contacts? After you answer these questions, I'll contact you on WhatsApp. |
Contact Emmanuel at emmanuel@aqua360.consulting. He is the CEO of Aqua360 Consulting. I just completed his website. He is very experienced and knowledgeable about the water filtration and packaging business. Check www dot aqua360 dot consulting for more information. |
Hello Entrepreneurs!! I'm jumping in head first. I've just completed a website for my first client in Nigeria and I want to offer my services to all of you future millionaires. Check out www dot aqua360 dot consulting. The young CEO of this residential and commercial water filtration consulting business is extremely happy with his mobile friendly website and I'm confident that I can make you just as happy. Give me the opportunity to build your website and you don't have to pay until it's complete. No risk. No danger. If you don't like the site, don't pay. If you like the site, then it's yours after paying our agreed upon price. Feel free to email details about your needed website to me at naijawebsite@gmail.com. I look forward to hearing from all of you! Gbenga
|
Sebastine1994:I'm here to help. Feel free to email me details about your business or share them below. I can't help if you don't provide me with more info. You can start with answering these questions. What does your business actually do? What do you want your site to accomplish? What features do you want your website to have? |
Hello Entrepreneurs!! I'm jumping in head first. I've just completed a website for my first client in Nigeria and I want to offer my services to all of you future millionaires. Check out www dot aqua360 dot consulting. The young CEO of this residential and commercial water filtration consulting business is extremely happy with his mobile friendly website and I'm confident that I can make you just as happy. Give me the opportunity to build your website and you don't have to pay until it's complete. No risk. No danger. If you don't like the site, don't pay. If you like the site, then it's yours after paying our agreed upon price. Tell me about the website you want below or feel free to email details to me at naijawebsite@gmail.com. I look forward to hearing from all of you! Gbenga
|
Merely a coincidence. |