PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 1:00am On Jul 04, 2020
omanzo02:
Soft wood, price of 1x12x12 in sawmills ranges between
₦1900 - ₦2200 depending on demand.
The one am using for my current project in Calabar is #1050 and full 1x12x12. In fact, I haven't seen 1x12 as full as this one. See pictures below.

PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op):
Ehimzy:
Please how much will a project like this cost.. Without the swimming pool, luxury finishing till turn key level, size of land is a plot.. Location Berger ,

Oh and the compound finished with interlocking stones and fence
Approximately 27m - 32would do it. On normal foundation for luxury finish.

Non luxury finish - 20 - 24m

Just ordinary finish - 18 - 20m
PropertiesRe: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 6:51pm On Jul 03, 2020
...
PropertiesRe: Offering Amazing Architectural Plan Discounts For Our Nairaland Clients by Dennis3D(op): 6:50pm On Jul 03, 2020
...
PropertiesRe: Build This Executive 4 Bedroom Bungalow With 10m Naira (Foundation - Finishing) by Dennis3D(op): 6:50pm On Jul 03, 2020
...
PropertiesRe: Simple 5 Bedroom Duplex - Architectural Design by Dennis3D(op): 6:50pm On Jul 03, 2020
...
PropertiesRe: 5 Bedroom Mansion (Duplex) Aba - Abia State Project by Dennis3D(op): 6:49pm On Jul 03, 2020
...
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 6:48pm On Jul 03, 2020
omanzo02:
1x12x12 is ₦2200 when I bought in May this year.
Hardwood or soft?
PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:45pm On Jul 03, 2020
More work updates on today coming.
We have done filling now at Day 5

PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:42pm On Jul 03, 2020
See the beam as the formwork is removed.

PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:40pm On Jul 03, 2020
jamalnation:
Following
Thank you for following
PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:39pm On Jul 03, 2020
diordaves:
Nice job.

Please throw more light on the choice of the foundation design. What's the soil condition like? Why the structural introduction of a ground beam? Given your knowledge of the soil condition, do you think there are alternative cost effective foundation designs without the ground beam?

The blocks are really unique. Very effective and practical for hollow blocks.

Well done.
Thank you for your questions.
The introduction of ground beam was as a result of historical background of the place. However, once it's ascertained that the land is good enough without ground movement and fast settlement, you may not need ground beam. Example of this was a two story we did in Uratta Owerri. There was no need for ground beam then because the soil was strong.

The foundation still remains pad and strip. The only new thing is the beam.
PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 1:31pm On Jul 03, 2020
...
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 1:01pm On Jul 03, 2020
You can follow up with this new project we are doing here. In just 4 Days we set out and got to this level of filling of the foundation.

https://www.nairaland.com/5955403/new-4-bedroom-duplex-construction#91334491

PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 12:56pm On Jul 03, 2020
... Work update still on day 4

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 5:59am On Jul 03, 2020
alstacs:
Baba, if another person had written what I wrote I would have said it is a lie. He was so unreasonable. He kept on speaking English about how he is a professional and how he worked for one of my neighbours on he street etc. Na so I leave am with my wife make dem de speak their English oh. As dem talk finish , no need to argue further. I just thanked him and told him we will get back to him.
grin cheesy
That line sha "I will get back to you".

Better say sorry I can't deal with this than to leave the person that way with that statement. It helps the person move on and maybe decide on how best to deal with clients subsequently. It's an honorable thing to dismiss a vendor, artisan or worker or even a contractor in a simple fashion than suspending or keeping the person hanging with that statement.

If need be you don't say it in front of him. Leave them a text or whatsapp message thereafter. In my opinion, it's the best way to treat people. Positively or negatively in brings about a defining closure of a discussion. Thank you for your time.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 5:53am On Jul 03, 2020
JWTheocracy1:
This is what he sent to me this evening... are all these the actual prices of materials in the east (Aba, Abia state to be precise). I will appreciate to be guided by the wonderful people of this forum. Note this is for remodeling of a storey building. If need may be, I can still upload the existing building here, so as to be guided properly.
Some things here seem to be high as per unit prices. However, I can only say the prices of things I bought then with time. So you can do your plus or minus yourself to get an average.

Firstly, what do you need the 20mm for?

Secondly, use this price range coz that's what we bought then for the two story building we did then.
- 9 inches block - 145 - 155 Naira for one
- 6 inches block - 120 - 135 Naira for one.
- a trip of Sand - 16 - 19K then
- 1x12x12 - 1200 Naira then
- Bag of nail - 8,000
- Cement then a bag was - 2500
- 30 Tons Granite - 230 - 250K then depending on your supplier and distance to your site.

This is just to mention a few.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 5:47am On Jul 03, 2020
JWTheocracy1:
Thank you for that detailed explanation. I don't base at home and this is my first project. With all these years of hardwork I won't like to pay more than the actual cost of materials.
You are welcome. Good luck in your project.
PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 5:40am On Jul 03, 2020
Day 4.
Back filling and construction of ground beam.
Block works took about 900 pieces
Height of 850 from the back then 1m in front to achieve the level.

PropertiesRe: Build & Sale 4 Bedroom Duplex - Lekki Investment Style by Dennis3D(op): 2:04am On Jul 03, 2020
...
PropertiesRe: 5 Bedroom Mansion (Duplex) Aba - Abia State Project by Dennis3D(op): 2:04am On Jul 03, 2020
.....
PropertiesRe: Semi Detached 4 Bedroom Duplex Design & Concepts by Dennis3D(op): 2:03am On Jul 03, 2020
...
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 2:01am On Jul 03, 2020
JWTheocracy1:
Ok thanks. How many tipper trips will make up 30 tons? Any idea?
Approximately 3.5 - 4Trips
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 1:59am On Jul 03, 2020
Hum2020:
Op if your Engineer gave you a quoation on grantie 30 ton at 250k will advise you to pay him because I brought mind 25ton at220k in imo state I discovered that the price of building materials is very expensive down in the east than any other place in nigerian
.. True.

Granite costs in East is very expensive compared to Lagos. I remember working in Owerri 2018. 30 tons was for 240K then at Uratta Imo State. Note, the distance plays a role too. So if I want to put a range I would say 200 - 250K. Though they have some other things cheaper too like Blocks there are cheaper than those in Lagos and a few more materials.

Their plumbing pipes is shorter than that of PH and Lagos too. In fact east has their own advantages and disadvantages when it comes to materials and workforce
PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 1:52am On Jul 03, 2020
....
PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 7:40pm On Jul 02, 2020
Ratun:
Your 3D is not showing the swimming pool.
See it here
I believe with time I will update the 3D with my recent software to improve some things

PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 12:23pm On Jul 02, 2020
... July 2nd 2020
Updates
We have started back filling and preparing ground beam concrete work and reinforcement

PropertiesRe: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by Dennis3D(m): 10:58am On Jul 02, 2020
Badgers14:
Ok.. thanks.

I was praying it wasn't 50 x100.. grin

Man, I have seen people almost squeeze a whole neighborhood in a 50 x 100..

their excuse is, oh that's a rental property.
Me: and so ?

That's just appalling.
I have done something that can surprise someone on 50/100fit before. About 5 flats or so
PropertiesRe: 8 Bedroom Duplex Construction - Lakowe Golf � by Dennis3D(op): 10:55am On Jul 02, 2020
...
PropertiesRe: New 5 Bedroom Duplex With BQ by Dennis3D(op): 10:55am On Jul 02, 2020
...
PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 10:55am On Jul 02, 2020
Keep following
PropertiesRe: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 8:43am On Jul 02, 2020
Day 3.
Colum to Decking is getting set