Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op):
flekky07:
I observed the foundation is not high enough any reason for that because access road is still not created.

Nice job following in 5D
The main road is actually 400mm below the site level.

The building level from the site is 800mm from the site level. So in total we have 1200m above the road level.

Back is 600mm because of the slope of the land.
See pictures below.

The last picture is the back View showing the exit and entrance from the laundry.

See the steps it has there.

Properties › Re: Reconstruction Of 4 Bedroom Semi Detached Duplex At Ikota Estate - Lekki Lagos by Dennis3D(op): 2:05am On Jul 05, 2020
...
Properties › Re: Oke Aro Ogun State Project - A 4 Bedroom Duplex With Saloon by Dennis3D(op): 2:04am On Jul 05, 2020
Update on the POP WORKS

Properties › Re: 4 Bedroom Duplex Construction: Live Photos - Less than half plot - Agege Lagos by Dennis3D(op): 2:03am On Jul 05, 2020
...
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 2:02am On Jul 05, 2020
...
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 1:58am On Jul 05, 2020
folmus:
following with rapt attention
Thank you for following
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 7:51pm On Jul 04, 2020
You can follow up with this project by clicking on this link...

https://www.nairaland.com/5955403/new-4-bedroom-duplex-construction

Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 7:43pm On Jul 04, 2020
Stair case pillar ready and Colums to lintel set too.
. Carpenter equally is set for slab Leveling as shown below.

Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 7:41pm On Jul 04, 2020
We successfully completed the laying of the membrane today. And we are set for site concrete tomorrow. Day 7

Properties › Re: 8 Bedroom Duplex Construction - Lakowe Golf � by Dennis3D(op): 2:49pm On Jul 04, 2020
... Our work
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 2:49pm On Jul 04, 2020
Watch out
Properties › Re: Semi Detached 4 Bedroom Duplex Design & Concepts by Dennis3D(op): 2:48pm On Jul 04, 2020
... Watch out
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 2:47pm On Jul 04, 2020
[quote author=Larry1960 post=91359313][/quote]Drawing is needed to know the area.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 2:47pm On Jul 04, 2020
omanzo02:
Woods seem cheaper in Calabar probably.
And it's full.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 2:46pm On Jul 04, 2020
One4me:
I think you are right, from the perspective of the Supplier/Contractor who wants to maximise his time/effort but from the perspective of a Client and Business continuity, l think that your line is not a good one.

The reason is that if we go by your line up there, you have completely dismissed the person and soured any possibility of working together again. It is a closure or final rejection.
There are instances when l want to discharge a Contractor/Supplier at that very moment but l want to keep the windown open, because l am still not sure of where l will fall or which decision l would take, finally.

By saying "l will get back to you", if l call him five days or ten days or one month after, he will still believe l was honoring my word (one told me: Oga, l think say you don dismiss me that day, be that? I told him: But l said l will get back to you, which is exactly what l am doing now, l was just busy all these while, that is why it took long. He was happy and we made love thereafter grin ).

Infact, there are times l feel very good and decide l dont want to go for the lowest price and will callup a Quote that l know was high and give out the job to that person, maybe l just like the aura of the person.

Some people will just open your file one day after you have all forgotten about it, call you and give you the job, like a miracle.
I have done it many times as l always take about four or five quotations and pick one and if that one does not perform, l pick another one.
If l had closed the door completely by saying "sorry, l cant deal with you", then that person would have missed the job because l wont have to go back to him and start explaining as if l am begging.
The 'Customer is King and Decider', when it comes to who gets or does not get the Contract!
It is incubent on the Contractor/Supplier/Employee to always keep a positive mind and spirit and not to take every job not given, as a rejection. Never close that door completely, the Contractor or Client that did not jell with you today, may jell with you tomorrow. You have to be flexible and take it lightly, if you dont get a job, despite all the effort you put in, it happens.
undecided undecided
Thumbs up cool
I quite understand your submission
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 2:41pm On Jul 04, 2020
Day 6
Site Update
We applied our membrane today and held as against tomorrow work. Site concrete...

Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 2:39pm On Jul 04, 2020
Salliet:
Nice job sir
Thank you
Properties › Re: TWIN 4 Bedroom Duplex In A Plot Of 600sqm² by Dennis3D(op): 8:39am On Jul 04, 2020
...
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 8:37am On Jul 04, 2020
obynocute:
Nice one boss, had it been in calabar, I would hv paid a site visit.
Ehya. We are still gonna work till late this year here
Properties › Re: 4 Bedroom Duplex Construction: Live Photos - Less than half plot - Agege Lagos by Dennis3D(op): 1:07am On Jul 04, 2020
Contact us
Properties › Re: 6 Unit Flats (INVESTMENT DESIGN) - Plot Of 50/100fit by Dennis3D(op): 1:06am On Jul 04, 2020
Contact us
Properties › Re: 3 Bedroom Bungalow Design - Photos by Dennis3D(op): 1:06am On Jul 04, 2020
Contact us
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 1:06am On Jul 04, 2020
See this
Properties › Re: Exotic Wall Designs for your Home and Office Spaces. by Dennis3D(m): 1:03am On Jul 04, 2020
Fonyeri:
Do you love what you see and you desire your home to look this lovely?
We are a phone call away.
Call or whatsApp 08090699076,08053187000
What's the cost like
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 1:01am On Jul 04, 2020
...
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 1:00am On Jul 04, 2020
omanzo02:
Soft wood, price of 1x12x12 in sawmills ranges between
₦1900 - ₦2200 depending on demand.
The one am using for my current project in Calabar is #1050 and full 1x12x12. In fact, I haven't seen 1x12 as full as this one. See pictures below.

Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op):
Ehimzy:
Please how much will a project like this cost.. Without the swimming pool, luxury finishing till turn key level, size of land is a plot.. Location Berger ,

Oh and the compound finished with interlocking stones and fence
Approximately 27m - 32would do it. On normal foundation for luxury finish.

Non luxury finish - 20 - 24m

Just ordinary finish - 18 - 20m
Properties › Re: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 6:51pm On Jul 03, 2020
...
Properties › Re: Offering Amazing Architectural Plan Discounts For Our Nairaland Clients by Dennis3D(op): 6:50pm On Jul 03, 2020
...
Properties › Re: Build This Executive 4 Bedroom Bungalow With 10m Naira (Foundation - Finishing) by Dennis3D(op): 6:50pm On Jul 03, 2020
...
Properties › Re: Simple 5 Bedroom Duplex - Architectural Design by Dennis3D(op): 6:50pm On Jul 03, 2020
...
Properties › Re: 5 Bedroom Mansion (Duplex) Aba - Abia State Project by Dennis3D(op): 6:49pm On Jul 03, 2020
...

1 2 3 4 5 6 7 8 ... 167 168 169 170 171 172 173 174 175 (of 269 pages)