Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op):
Oliran:
Good morning Oga Dennis, I have been a silent folllower. Please I have few questions to ask if you don't mind.


1. You said the blocks are heavy, did you mould the blocks yourself? If yes, how many blocks did you mould from a bag of cement?

2. What's the spacing of the links for the column, they kind of look like 500mm spacing to me, maybe it's the camera Sha.

That will be all for now, thank you sir.
Have a great day!
Thank you for your questions.
1. It's hand mould they do here. About 33 - 35 per bag and their mould here is different.

2. 250mm spacing is the links. 10mm full.
But there are other technicalities we bring in to it too. So before you do it ensure that you are going to get it right
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:45am On Jul 07, 2020
Critical points are followed.
See the site Concrete...
Minimum of 5inches to 7 inches averagely...

Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 6:40am On Jul 07, 2020
Keep following up with us
Precision is everything and we pay attention to details.

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 3:20am On Jul 07, 2020
Hello guys.
See this amazing transformation work we did here. Follow it up until we furnish it.

See Before Construction
During Construction

Then wait for the final finish on the thread
https://www.nairaland.com/5825308/interior-redesign-reconstruction-3-bedroom

You will find other interior renovation works on the thread. Just follow and see updates coming through

Properties › Re: All Interior Redesign - Reconstruction Works of Dennis3D by Dennis3D(op): 3:15am On Jul 07, 2020
Work updates on this flat.

Properties › Re: Architect & Project Manager Needed Urgently For Renovation Works by Dennis3D(m): 3:13am On Jul 07, 2020
Also visit this link to see our most recent job.

https://www.nairaland.com/5825308/interior-redesign-reconstruction-3-bedroom

Its all about face-lift and upgrade.
Properties › Re: Architect & Project Manager Needed Urgently For Renovation Works by Dennis3D(m): 3:12am On Jul 07, 2020
Also visit this link to see our most recent job.
https://www.nairaland.com/5825308/interior-redesign-reconstruction-3-bedroom/3#91458634

Its all about face-lift and upgrade.
Properties › Re: All Interior Redesign - Reconstruction Works of Dennis3D by Dennis3D(op): 3:10am On Jul 07, 2020
Our work
Properties › Re: Architect & Project Manager Needed Urgently For Renovation Works by Dennis3D(m): 3:09am On Jul 07, 2020
taland:
We urgently need the service of an Architect who will also double as project supervisor for a repair and renovation works on a property in Lagos State.

The property is a two-story building and it needs a complete makeover. The building is located specifically in Itire Ikate, Lagos state.

If you're are interested, please send:
1. Your individual or company profile detailing completed jobs in the last five years showing pictures verifiable address and contact persons,
2. List of completed jobs, location, and contact persons

Send required info to: ramonworks75@gmail.com and

Call: 08032897801, 08158141331

I will be glad to hear from you soon.
Definitely it's something we can do.
Check out my profile here to see works we have done.

Also find time to look through www.facebook.com/dennis3ds and www.instagram.com/nwabuisidennis

Contact us if you convinced by what you see.
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 3:05am On Jul 07, 2020
On this Day - Day 8 On site and Officially Day 1 of Ground Floor Works. This is where we are.
We got here with 12 Labour and 4 Bricklayer OK site. 12 labour was for a reason though coz the blocks are exceptionally heavy. So some labour are dedicated to only carry them.

Properties › Re: New 5 Bedroom Duplex With BQ by Dennis3D(op): 1:39am On Jul 07, 2020
... Call us
Properties › Re: TWIN 4 Bedroom Duplex In A Plot Of 600sqm² by Dennis3D(op): 1:39am On Jul 07, 2020
Call us
Properties › Re: 5 Bedroom Mansion (Duplex) Aba - Abia State Project by Dennis3D(op): 1:38am On Jul 07, 2020
Contact us
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 1:38am On Jul 07, 2020
Keep following
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 8:44pm On Jul 06, 2020
vivaciousvivi:
Good day sir. Longest time!

Following earnestly
.. Thank you for following up with us. Feel free to ask questions
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 8:43pm On Jul 06, 2020
mufutau55:
Wow! Really moving. With no fun problem... house will be ready for move-in within 3 months o. I like the way you work. Keep up the good work o.

Hajji M.
Thank you sir for following up always
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 7:02pm On Jul 06, 2020
Day 8 On site.
Day 1 of Ground Floor Works.
We formed and kicked off to 6 coarse straight.

12 Labourers on site and 4 Brick Layers.

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 1:47am On Jul 06, 2020
michlins:
I'm not in Calabar but I can deliver beautiful locally made doors to you. 07032fourfour6904 is my number. Why not call or WhatsApp me
Thank you for indicating interest in supply but
Sorry what I need is imported doors entrance, exit and bedroom doors. Not the local ones. I can find the local ones very close to my location here but that's not what I need.
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 1:44am On Jul 06, 2020
ElteeSupreme:
Please can you kindly explain how setting out is being carried out?
Sorry before I do that.
Can I know what you are and why you need such information?
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 10:19pm On Jul 05, 2020
Stay tuned for more updates
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Dennis3D(m): 10:17pm On Jul 05, 2020
Any Dealer here on Good Quality doors in Cross River State here. Kindly message me on via mail or whatsapp. Thanks.
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 9:36pm On Jul 05, 2020
Keep following.
There is a new Adjustment in view about the front pillars of the building. So we are reviewing it with client and have made a choice.

Now this is why we are unique. Our design doesn't just stop at the document stage. During construction we can simulate somethings to bring to fur new ideas.

See the two comparisons
To you following us.
Which option would you go for if you are asked to pick...

Properties › Re: 5 Bedroom Duplex - Open Decking (slab) PHOTOS - 1 Plot by Dennis3D(op): 7:26pm On Jul 05, 2020
We Design and Build
Properties › Re: Executive 4 Bedroom Bungalow by Dennis3D(op): 7:26pm On Jul 05, 2020
We Design and Build
Properties › Re: Simple but stylish One Bedroom Design Interior and Plan (PHOTOS) by Dennis3D(op): 7:26pm On Jul 05, 2020
See this..
Properties › Re: Uratta Imo State Project. Construction Of 6 Unit 2 Bedroom Flat by Dennis3D(op): 7:25pm On Jul 05, 2020
We did this too
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 5:56pm On Jul 05, 2020
temi4fash:
Boss..

I don't understand ooo...

75mm thickness for the German floor.

125mm for decking right??
75mm thickness is the screeding of the waterproof membrane.

While the slab is about 125 - 175mm respectively. Slab here is what you know as German Floor. 5 - 7inches thickness
Properties › Re: 6 Bedroom Duplex Design For A Plot + 2 Unit 2 Bedroom Flat - Plot 60/120fit by Dennis3D(op): 1:18pm On Jul 05, 2020
... See this
Properties › Re: 3 Bedroom Bungalow Design by Dennis3D(op): 1:18pm On Jul 05, 2020
...
Properties › Re: 6 Bedroom Duplex Design For A Plot + 2 Unit 2 Bedroom Flat - Plot 60/120fit by Dennis3D(op): 1:18pm On Jul 05, 2020
...
Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 1:14pm On Jul 05, 2020
We are currently doing the Site concrete in just Day 7

Properties › Re: New 4 Bedroom Duplex with Swimming Pool Construction - Calabar Project by Dennis3D(op): 1:05pm On Jul 05, 2020
temi4fash:
Please what is the thickness of the membrane?

Is it same as GERMAN floor??

How many pillars/columns in total??
We have 75mm thickness of membrane cover.
Average Slab is 125mm - 175mm.
Colums are 24 in number in the main building and 4 more external pillars coming in front.

Making it 28 pillars in All