Keep following up with us here still. Updates on glad fixing coming up. |
Still on the Beams. Duplex area now. Lots of Beam formation The bedrock that carries the decking slab.
|
Good morning |
.. |
... |
... |
Iron works on beams ongoing Its basically beam formation we are doing at the moment
|
Good evening Viewers |
Burglary works set on for these windows here
|
More perspective view of the Building One of our biggest challenge so far in this project is steady rainfall. Today, it's been raining since morning till now. ![]()
|
Decking works update
|
Good morning Viewers. As promised. This is the next stage of works 3D Model of the proposed DECKING construction
|
Would be sharing the 3D Model of the Decking Slab here today!!! Stay tuned.it's becoming interesting the more. Designing and Building In real time 3D and Life Construction simultaneously. Every element is represented. |
In preparation for the decking works Some 3D models have Been established to show a few adjustments on the design. The entrance area to the flat have been worked upon. See the updates on the design and watch out for the construction ASAP
|
Decking materials. We have got already 350 pieces of planks. 300 pieces of Bamboo sticks. 250 pieces of 2x3x12 wood. 4 Bags of nails. 16mm 12mm 10mm 3 roles of binding wires. Set for the decking works now.
|
We have successfully completed the application holding leveling. Total blocks purchased was 4200 pieces in all. Decking stage is next and we have equally made some procurements for a start. Bamboo here are sold at 750 but they are full length as compared to Lagos own. Lagos is selling for 650 the last I bought 3 months ago but this one here is x2 Lagos size. So Lagos building material market is quite expensive when it comes to wood and a few other things down here. There are only but a few building materials in Lagos that I will say are better of than here but they are barely significant when it comes to cost. Though some practice in the east here are different too than Lagos. Like when you buy stuffs here you pay for loading and Offloading yourself. You pay for transport yourself. Just the few procurements done yesterday costed 40K transport and 20K loading and Offloading.
|
BiigTee:Thanks sir. Good morning to you. |
Keep following |
Good morning. |
Keep following |
Consistency is Key. Regardless. Thank you for those watching and following up silently too. We see and notice your presence on the page views. ![]() We will definitely continue to update the thread as work goes on here. |
Leveling works ongoing still
|
So far on the ground floor we have used over 3700 Blocks of 9 inches and still counting. Our leveling is 3 coaches of blocks after lintel.
|
Good morning
|
Picture update. Earlier yesterday. The Duplex has an open Kitchen design. Picture 1 and 2 - Main Sitting room Picture 3 and 4 - Showing the Flat Area
|
More work updates from here Results and going forward of the concrete works we did yesterday. Leveling ongoing simultaneously. We are doing 3 coaches as against 2 coaches initially planned. Client wants more headroom for the decking. For finishing concepts on POP designs.
|
Result of the area we poured concrete before the rain.
|
Well done bro. |
Good morning Viewers. Keep following up with us for more update. We will continue with our works on colum and Lintel today. Rain was much yesterday. We had to stop concrete works. |
Good morning. Windows are now set for: Preparing for Glass and Burglary installation now.
|
Without wasting much time. We have started preparing for decking. Starting with the decking rings/stirrups
|
Working at this time in the east is quite challenging. But we are doing our best as always
|