PropertiesRe: Luxury Construction - 7 Bedroom Smart Duplex (mansion) - Lekki Lagos by Dennis3D(op): 2:33pm On Jun 11, 2022
...
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 2:32pm On Jun 11, 2022
...
PropertiesRe: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 2:32pm On Jun 11, 2022
What we do
PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 11:53am On Jun 11, 2022
Concrete works now
Lintel and Colums

PropertiesRe: 5 Bedroom Mansion (Duplex) Aba - Abia State Project by Dennis3D(op): 6:29am On Jun 11, 2022
Work updates on the pillars here

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 8:58pm On Jun 10, 2022
We will continue tomorrow with other works on site.
PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 5:01pm On Jun 10, 2022
So much rain in this region of the country is very challenging. However, we are trying as much as we can to push through.

Just before the close of work today rain started falling after terrible 4hrs sun.

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 4:15pm On Jun 10, 2022
Lintel work still from here.
Picture 1 - Main Sitting room
Picture 2 and 3 - Ante Room with Visitor's Toilet
Picture 4 - Lintel Reinforcement on Visitor's Toilet

PropertiesRe: Luxury Construction - 7 Bedroom Smart Duplex (mansion) - Lekki Lagos by Dennis3D(op): 12:54pm On Jun 10, 2022
... Hoping to update this thread with the finishing works on this site when I get back to base.
PropertiesRe: FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS by Dennis3D(op): 12:54pm On Jun 10, 2022
We did it
PropertiesRe: Semi Detached - 6 Bedroom Duplex with Pent House Construction - Osapa London by Dennis3D(op): 12:54pm On Jun 10, 2022
... Hoping to update this thread with the finishing works on this site when I get back to base.
PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 12:52pm On Jun 10, 2022
So far we have bought up to 3600 Blocks of 9 inches and 500 6 inches blocks

Estimated Blocks was 4100 blocks for this ground floor works.
PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 12:44pm On Jun 10, 2022
Wrapping up the Lintel and colum form works from the flat session.

Picture 2 - Lintel Reinforcements

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 11:25am On Jun 10, 2022
Update from here

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 4:25pm On Jun 09, 2022
Lintel and colum work update

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 2:48am On Jun 09, 2022
Good morning Viewers.
Updates on the work progress to be shared today.
Stay tuned.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 5:38pm On Jun 08, 2022
Good evening followers.
Update coming soon
PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op):
Delivery of lintel planks and irons

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 9:55pm On Jun 06, 2022
More updates before the close of work today.
View of the Picture 1 - Ante Room and Visitor's Toilet

Picture 2 - Sitting room from external

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 5:36pm On Jun 06, 2022
More updates from here...
Main Sitting room view.
Size = 4.9m x 5.8m
That's about 28sqm
Very big sitting room

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 3:27pm On Jun 06, 2022
Block works update on the ground floor

Picture 1 and 2 = Over view of the main building
Picture 3 and 4 = Ante Room with visitor's Toilet.

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 12:34pm On Jun 06, 2022
We have on site now for a start of the ground floor works 2500 pieces of 9 inches and 500 pieces of of 6 inches blocks for a start.

9 inches here is sold 280 Naira
7 inches is sold 240
PropertiesRe: 5 Bedroom Mansion (Duplex) Aba - Abia State Project by Dennis3D(op): 2:15am On Jun 06, 2022
Lintel work update

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 2:10am On Jun 06, 2022
More work updates from Flat 1 and 2

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op):
Good afternoon Viewers.
As promised.
Here is the work update so far.

The layout...

Picture 1 - Flat 1 Ensuite rook toilet and bath
Picture 2 - Flat 3 and 4 Staircase area
Picture 3 - Flat 3 and 4 Staircase area
Picture 4 - Flat 1 - Visitor's Toilet area in the living room

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 9:55am On Jun 05, 2022
We are commencing block work forming and architectural layout today Sunday June 5 2022.

We have ordered for 2000 blocks for a start to wedge against the sit at home tomorrow Monday June 6th.

100 Bags of cement are delivered for this stage for a start.

The pillars are now mounted and properly tied to the starters with double binding 4 times on each pillar.

Kindly stay tuned and follow us up.

PropertiesRe: 5 Bedroom Mansion (Duplex) Aba - Abia State Project by Dennis3D(op): 4:03am On Jun 05, 2022
Meanwhile, the colum works and Lintel works are ongoing here

PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op): 4:02am On Jun 05, 2022
2 blocks are purchased already same yesterday evening. Deliveries will commence this morning while the block work layout will start today still.

No delaying. We will push as far as we can to See what we can achieve in the fastest time possible.
PropertiesRe: A Country Home Design And Construction with Swimming Pool - Enugu State by Dennis3D(op): 9:15pm On Jun 04, 2022
.....
PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by Dennis3D(op):
Foundation Summary
- Total of 44 Pillars
- Blinding works - 89Bags
- Block Works on foundation - 45Bags.
- Ground Beam with colum works - 55Bags
- Site concrete Works - 140 Bags
- 16 Trips of Laterite filling
- 1700 Blocks of 9 inches
- Over 9 Trips of Sharp Sand
Total of 110 Tons of Granite Bought, though remaining half a trailer.

So when you do the little maths on this particular procurements you will get to understand how far we have come in terms of materials

PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 7:04pm On Jun 04, 2022
ImperialCovfefe:
Can’t the net be also side-hung and open inwards, while the window opens outward?
I don't think so, though from my own observations and experience, it needs a hinge kinda thing to be able to make the net open that way. However, the essence of the net is best utilized as sliding.

Window aluminum people could probably speak more on this. Cc: Ade Edward, Rock of Ages Aluminum, Perfect Touch and a host of others can say more.

In construction, one can always try out new ideas than conventional.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 6:35pm On Jun 04, 2022
ImperialCovfefe:
Help me clarify something, bro. How does the net work in a side-hung window? Will it have to be a sliding net?
Yes sir. The Net will be sliding. While the window itself will be opening from the side... Reason why its called side hung