Plastering just began
|
Dear esteemed stakeholders and community members, We are pleased to announce that we are reopening our mansion construction site at Obodoeze Nomeh Unataeze kingdom here in Nairaland. Currently, we are resuming work on the final finishes of this prestigious project as promised to continue during the finishing. As you may recall, we initially shared updates on this project on August 14, 2024. We appreciate your interest and enthusiasm, and we are excited to share the progress we've made so far. Our team is committed to delivering a world-class mansion that meets the standards of quality and excellence. We are working diligently to ensure that the final finishes are completed soon and perfectly too. We have redesigned and attached the new approach view we also touch up /open up some walls in the building layout to suite the future. We invite you to join us again as we embark on this final phase of the project. We will be sharing regular updates, photos, and videos of the construction process, so please stay tuned! Thank you for your continued support and interest in our project. We look forward to delivering an iconic landmark that will be a source of pride for our building construction. Best regards, Engr. Dubem For Berean Brothers Ltd
|
Yeah, not all at once
|
Approach appearance
|
The block pillars formation
|
Looking differently now
|
The process
|
Here we go. The Works
|
While leveling was on, i was considering a different design of concrete facia ( parapet) given that the architect has done his best but i normally redesign at the site once am happy at work, creative inspiration will flow freely ![]() So, this is the drawing but i will give the house a different paparazzi parapet arrangement for touch up sake and better appearance, free of charge of course. Though as a bonus to the client. However we have discussed it and we have his consent.
|
Follow up, update on the construction
|
Obinnau:Sofar, we have concluded with the 2nd deck but would not update until during final finishings |
Block formation
|
More Details on the deck
|
Details of the deck
|
completed the deck reinforcement
|
psychologist:Firstly, Inorder to come close in understanding with some of us who are not professionals in this field, sometimes i use a very common or individual word more like a layman's terms provided everyone understands my explanation and analysis. In this context; Deck or decking = Concrete Slab Beam = Beam Put together = Deck beam But what i mean here is the beam installation at the deck reinforcement level. ( in a layman's term) Nevertheless, in a professional terms, what we ment here is a Monolithic slab and beam system ( MSB) Monolithic Slab and Beam (MSB) : are a structural elements that are cast integrally, forming a continuous and interconnected system. Beams are used to support the slab in it reinforcement and by so distribute loads to the columns or walls below. By casting the beams and slab together, the system becomes more rigid and efficient in transferring loads. However, the monolithic construction method offers several advantages, including: Improved structural integrity : The integration of slabs and beams creates a more robust and stable structure. Reduced construction time : Casting the slabs and beams together can streamline the construction process. Cost-effectiveness : Monolithic construction can be more economical compared to other structural systems. Enhanced load distribution : the Beams help distribute loads evenly across the structure, reducing stress concentrations. Now, to your question, The monolithic slab and beam (MSB) system serves several structural and theoretical functions in building construction: Structural Functions : 1. Load transfer : The MSB system transfers loads from the building to the foundation or soil. 2. Flexure : The MSB system resists bending and flexural stresses. 3. Shear resistance : The system resists shear forces and prevents cracking. 4. Torsion resistance : The MSB system resists twisting forces. Theoretical Functions : 1. Load distribution : The system distributes loads evenly, reducing stress concentrations. 2.Structural integrity : The MSB system provides a continuous, unified structure. 3 Compression and tension : The MSB system resists compressive and tensile stresses. 4. Redundancy : The MSB system provides redundant load paths, enhancing structural reliability. 5. Stability : The system ensures stability and resistance to settlement or movement. 6. Structural integrity : The MSB system provides a continuous, unified structure. Monolithic slab and beam system creates a strong, efficient, and robust structural solution for building construction. Please bear with me, the response came late, i was a bit tight. Thanks Engr. Dubem |
Overview
|
* The compressive strength of the concrete protective measures * Deck beam installation * Panel reinforcement * Zero vibration measures
|
*leveling off the blocks to the head roof * deck formation * panel reinforcement * block hole closure
|
*Block formation *The layout are clearly defined * lintel boarding and cast work on going
|
*Foundation walling *Foundation reinforcement *Back filling * filled soil settlement * Compaction I went for a treatment of an accident that occurred in Abriba, Abia State and before i could visit the site these (five) 5 processes have already been completed and we are headed to DPM & OSC Block work will be eminent Honestly, we have gone pass this stage but i will run a catch-up update.
|
Blinding off the straps
|
More on reinforcement
|
Luckylife:Amen, thanks a million |
Excavation Details
|
Excavation supervision and review on project
|
Building positioning & Adjustment Marking out Excavation
|
In Nomeh Unataeze Kingdom, Nkanu East LGA a construction of 5 bedroom duplex just began. Please follow us again Setting out in less than 6hours
|
Reinforcement ........................................ Happy birthday to me. It can only be God...
|
Concrete contractors or cast workers in or around Enugu, call 08030799100 for a job |
VanuatuWycombe:Honestly speaking o, the lost is usually massive, when you trust chippings supplying in the hands of this suppliers. Even the material estimate, BEME (Bill of Engineering Measurement and Evaluation) that is estimated to handle the project will be affected because the will be a drastic shortage from the prepared BEME. Is always better you go and buy it yourself or loss happily ![]() |