Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 3:48am On Oct 20, 2023 |
spyder880: Work is still ongoing at this site today...............
Tanks now hoisted on the tank stand...... What's the size of this individual tanks Sir? |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 12:47am On Oct 17, 2023 |
spyder880: Nigerian made tiles, Spanish is so so expensive these days due to the exchange rates. And the quality doesn't worth the difference in price. Oh I see, the Nigerian made tiles doesn't look bad . |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 2:51am On Oct 16, 2023 |
spyder880: We have bought all the tiles needed to complete the floor and wall tiles for this whole building, tiling starts soon.
More pictures later. Are these Spanish or Nigerian tiles? |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 4:21pm On Oct 12, 2023 |
spyder880: I couldn't get to the site, market was too rowdy with impending price hikes, after buying the tiles, I sent my workers to drop them at the site while I moved to another market to buy electrical fittings.
But these are examples of the tiles we want to use at this site. For walls. Nice selection |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 3:38am On Oct 12, 2023 |
spyder880: We have bought and dropped some if the floor and wall tiles at this site. Work is going on withe the wall screeding, doors and windows hanging and dressing, soakaway system completed. No pictures  |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 6:22pm On Oct 06, 2023 |
michlins: I did the doors and rails Okay nice job! |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 4:29pm On Oct 06, 2023 |
spyder880: Yes we did full POP on the under decking, the tank stand will carry 6 tanks. Thanks. Everything looks standard. The rails looks simple and sturdy. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 8:03pm On Oct 05, 2023 |
Was P.O.P done on the under deck, and how many tanks will this tank stand carry? |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 8:01pm On Oct 05, 2023 |
spyder880: 1 soakaway will be good for this house, I had to use 6" solid blocks to save more space. OK Sir |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 7:44pm On Oct 05, 2023 |
spyder880: Soakaway system How many soakaway will this building have. Can this be constructed using 9" hollow block? I see you're using 5"solid block . |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 10:38pm On Sep 21, 2023 |
spyder880: For buildings like this, the 3 stages may cost up to 5m. The wires obviously cost more. wow |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 9:04pm On Sep 21, 2023 |
What would the three stages of electrical cost you in this build . I heard the wiring part cost more. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 8:59pm On Sep 21, 2023 |
spyder880: If I have men working in the site that I think will be there till the finish, then I can have the house wired before doors and windows. The advantage of doing wiring early is the benefit of seeing where there are blocked piping, and the work of braking walls or under decking to correct the piping work when it's still early, which is before wall screeding or ceiling works under the decking as the case may be.
What makes me leave wiring till later in some sites is to save the wires from being stolen if the work is not continuous. Thanks. My thoughts |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 7:51pm On Sep 21, 2023 |
spyder880: Yes, I have my plastering team, ceiling team, screeding team, electrical team all working now, the door crew will arrive this weekend, to work with the windows guys, then all windows and doors will be dressed same time.
We are already moving for tiles and sanitary wares. Welcome. Spyder I thought electrical wiring comes after door and window installation? |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 5:56pm On Sep 21, 2023 |
Looks like you have multiple teams on the ground working on this site. Nice job |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 9:20pm On Sep 15, 2023 |
spyder880: Local iron doors are very good, and you can choose to re8nforcebit with additional security features, or thicker iron plates to make it difficult for anyone to break into. Easier to amend than foreign doors. Okay |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 8:31pm On Sep 15, 2023 |
spyder880: You mean the local wooden doors? No, local iron doors. I've seen you use doors you fabricated in one of your sites. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 9:15pm On Sep 14, 2023 |
spyder880: Arrival of more internal doors............ Are these doors better than the local Nigerian fabricated doors |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 2:49pm On Sep 08, 2023 |
spyder880: About 2.6m for all the whole house plus dressing of doors plus designs and removal of scaffolding. The house owner must be proud of your bargaining power  |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 2:30am On Sep 08, 2023 |
Very thick plaster. What's the labour cost to plaster this house |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 2:38am On Sep 03, 2023 |
spyder880: We have completed the dressing of the whole parapet in this house, we are now starting the plastering of the exterior walls of this building..............
More updates later. Any reason for starting the exterior plastering first ? |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 11:56pm On Aug 27, 2023 |
spyder880: Yes, other people still call it "Danta" but I think they are the same wood by different names. Okay |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 3:17pm On Aug 27, 2023 |
spyder880: Good morning Sir, these are mangrove woods, popularly known in our markets as "mango wood". They are very hard wood and most times need no for of treatment. I have never seen a site where termites attacked these type of hard wood.
Thanks. Thanks for the clarification. Would it be said that this wood is the best especially in your region. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 3:36am On Aug 27, 2023 |
spyder880: Roofing wood offloaded and ready to use ........... Mr Spyder what type of wood is this, and are they treated ? Your building speed is incredible. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 10:32pm On Jul 28, 2023 |
spyder880: Yes, it's two steps. Okay, the building is taking shape. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 7:49pm On Jul 28, 2023 |
spyder880: Seeing the parapet wood works from the top......... Is this two steps Engineer? |
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by Gen2men: 10:02pm On Jul 24, 2023 |
spyder880: Good evening bro, I am a lot busy now. Thanks. I understand..Thanks I will chat you on WhatsApp |
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by Gen2men: 4:39am On Jul 24, 2023*. Modified: 2:21pm On Jul 29, 2023 |
. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 10:15pm On Jul 20, 2023 |
Wow this house has gotten to this stage already  |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Gen2men: 8:17pm On Jul 13, 2023 |
KIDfurniture: Papylove07@yahoo.com I don’t want to paste my line here sir. Are you still giving out this tips  If yes, I'll be needing them too. Thanks |
Properties › Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by Gen2men: 7:59pm On Jun 23, 2023 |
spyder880: About 1200 or thereabouts. Thank you |
Properties › Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by Gen2men: 7:39pm On Jun 23, 2023 |
Sir can you estimate the total bags of cement it took to complete this build including plastering. |