Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 9:16pm On Jul 28, 2023 |
. |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 9:17pm On Jul 28, 2023 |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Gen2men: 10:32pm On Jul 28, 2023 |
spyder880:Okay, the building is taking shape. 1 Like |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 12:29pm On Aug 04, 2023 |
Work on the parapet fascia of this house has reached advanced stages, we might start the concrete cast today, or tomorrow morning. More pictures later. |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 8:40pm On Aug 05, 2023 |
Updates on the iron reinforcement works on this parapet fascia..........
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by erico2k2(m): 10:06pm On Aug 05, 2023 |
spyder880:Bro last pic no roof or decking but there is windows on the ground floor, is this a good idea? |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 7:17am On Aug 06, 2023 |
erico2k2: Good morning bro, that's another house in the other compound. We haven't even started building this house as at that time. Welcome. |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by erico2k2(m): 7:34am On Aug 06, 2023 |
spyder880:Good morning my guy long time ohh, yeh I now get it 1 Like |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 9:02am On Aug 06, 2023 |
erico2k2: Happy weekend Sir. |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 7:54am On Aug 08, 2023 |
Parapet cast almost completed this morning............
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 7:56am On Aug 08, 2023 |
We are going ahead to buy roofing wood today.............
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 9:18pm On Aug 08, 2023 |
Today, we took delivery of the roofing wood with which to roof this house..............
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 10:14am On Aug 10, 2023 |
Roofing wood offloaded and ready to use ...........
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 4:02pm On Aug 10, 2023 |
This house today...............
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 4:04pm On Aug 10, 2023 |
From the top of the completed parapet fascia............
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 4:06pm On Aug 10, 2023 |
More......
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 1:45pm On Aug 12, 2023 |
Roofing wood works for this building is in progress.............. |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 5:59am On Aug 13, 2023 |
We are still doing the roofing wood works of this house.................
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 8:05am On Aug 13, 2023 |
Preparing for the aluminium sheets roofing of this house. |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 5:25pm On Aug 15, 2023 |
We have completed the roofing wood works on this house today.............. 1 Like
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 8:42am On Aug 19, 2023 |
Preparing to install the roofing sheets here, more pictures later today..... |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 11:49am On Aug 19, 2023 |
Roofing wood works done..........
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by Chidimercy: 6:40pm On Aug 19, 2023 |
spyder880: Your works are very clean and neat, please what's the height of this roof? |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 7:59pm On Aug 19, 2023 |
Chidimercy: About 19 feet high. Thank you very much. 2 Likes |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 8:00pm On Aug 19, 2023 |
More pictures from our work here..........
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 8:16pm On Aug 19, 2023 |
Some pictures from around this house today.............
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 8:25pm On Aug 19, 2023 |
Arrival of the roofing sheets thos evening...........
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 11:31am On Aug 21, 2023 |
Installation of roofing sheets is ongoing in this site today, more pictures later. |
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 12:48pm On Aug 21, 2023 |
Some pictures of roofing installation........... 1 Like
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 7:56am On Aug 23, 2023 |
We have completed the roofing sheets installation of this house, more pictures later.
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by michlins(m): 9:04am On Aug 23, 2023 |
Delivering these doors to the site 1 Like
|
Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(m): 9:00am On Aug 24, 2023 |
As at this morning, all arrangements to start and complete the finish of this building just kicked off, we are starting from the: 1. The rework of the scaffolding 2. The plumbing internal piping 3. Electrical piping, thunder arrestor equipment, distribution boards 4. Plastering of this entire building walls, and all the beautiful designs that came with it 5. POP ceiling 6. Wall screeding 7. Doors and windows installation and dressing 8. Electrical wiring 9. Handrails and stair rails dressing 10. Floor and wall tiles 11. Sanitary wares, 12. Soakaway system construction and connection 13. Wardrobe and kitchen cabinets 14. Water tank connections 15. Fencing of this property 16. Painting 17. Lights and electrical fittings 18. Compound works, concrete stamping 19. Industrial cleaning we will be doing all these and showing the updates of this work here from today. More updates later. Thanks for following. |
(1) (2) (3) ... (5) (6) (7) (8) (9) (10) (11) ... (18) (Reply)
Hotel On A Full Plot Of Land For Sale. Selling Cheap. / FASTEST ONE STOREY BUILDING CONSTRUCTION EVER BUILT IN 3 WEEKS & 5 DAYS / Give your House A Quality Pop Design
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 22 |