PropertiesRe: Budget For A 3 Bedroom Bungalow by Heymus(m): 9:32pm On Dec 27, 2020
bayo2018:
Good day House
Please what’s the minimum amount one can budget on a 3 bedroom bungalow with a nice finishing

ion know much about building as this is my first time and my budget is around 12m for building. ion wanna spend much on building that’s why I’m tryna stay low.

3 bedroom
Laundry
Study room
With nice interior inclusive.
if there’s any other thing that’ll be added kindly lmk also.
Good day to you sir, 12m is more than enough. I will be glad if you can do business with us. 08036879623 you can check some of my previous posts.
PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:03pm On Dec 11, 2020
2

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:03pm On Dec 11, 2020
Casting of columns and lintel
PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 2:02pm On Dec 11, 2020
Casting of lintels and columns �% done.

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 5:52pm On Dec 06, 2020
So far

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 5:50pm On Dec 06, 2020
Pics

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 5:49pm On Dec 06, 2020
More

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 5:48pm On Dec 06, 2020
Still

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 5:48pm On Dec 06, 2020
More pics

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 5:46pm On Dec 06, 2020
Boarding of iron rods for lintels and columns before casting

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 8:44am On Nov 15, 2020
ladyteeks:
The total blocks and cement for the entire ground floor
we haven't gotten to the final level of the ground floor, we're still at the window base.
But as you can see from the post from the onset, we introduced ground beam (chaining), in the foundation due to the sloppy nature of the ground. At the lowest point we used double beam and the highest point we used one plank beam. Also 22 short columns then finally we chained it round with another beam before casting german floor.

I explained all these to you, just to let you know what we did was not only about the block settings.
For casting of ground beam
Block settings
Final beam
Short columns
German floor

So far we have used 110bags of cement.
1300 9inches vibrated blocks.
PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 11:42pm On Nov 14, 2020
ladyteeks:
How many blocks and cement did you use for the blockwork
.you mean the blockwork on this german floor?. If yes, we used 550 9inches block and 10bags of cements.
PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 7:34pm On Nov 14, 2020
4

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 7:33pm On Nov 14, 2020
3

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 7:32pm On Nov 14, 2020
More

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 7:31pm On Nov 14, 2020
Blocksettings to window base (4coaches).

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 3:48am On Nov 04, 2020
Pic 5.

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 3:47am On Nov 04, 2020
Pic 4.

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 3:46am On Nov 04, 2020
Pic 3.

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 3:45am On Nov 04, 2020
Pic 2.

PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 3:44am On Nov 04, 2020
Next phase of work is the construction of oversite concrete/German floor.

PropertiesRe: Please Kindly Criticize This 3bedroom Plan. by Heymus(m): 10:23am On Oct 30, 2020
nannymcphee:
Good day all, the architect has responded based on the brief I sent

CC
Josnac
Zabiboy
Heymus
Yosmen

Pls any inputs?
well, I love the justice he has done to the flows within the sitting room, dining and kitchen.

Your Architect can be creative more than this cos I'm still having issues with that lobby, just too much. I consider it as waste of space, that lobby itself has taken much percentage from the building.

That lobby it's a no no no for me.
PropertiesRe: Please Kindly Criticize This 3bedroom Plan. by Heymus(m): 2:51am On Oct 09, 2020
Nbotee:
I meant to say "Flat" not building. I want to assume dat plan is for the first floor whixh if it only leads to the balcony at the back
ground floor plan not first floor
PropertiesRe: Please Kindly Criticize This 3bedroom Plan. by Heymus(m): 2:46am On Oct 09, 2020
nannymcphee:
I dont fully get this, please can you explain in another way

A rough sketch might help please.


This is the front elevation, my understanding is that circle 1 leads to the entrace door to the ground floor

circle 2 leads to the staircase to the 1st floor

some folks advised I introduce window in the dining and passage, what i dont get is this is an enclosed staircase, what difference will the window make.
yes I understand that, where you marked 1 stands for the entrance to the flat on the ground floor and 2 is the entrance that leads to the upper floor, so I mean the staircase you're having at the back (exit from the kitchen). Just look at the sketch I attached, never mind about the look

Those who are telling you about the ventilation of the lobby and sitting room are very correct, that enclosed staircase is really choking the ventilation of the dining, lobby and sitting room.

Your Architect should be creative enough to give room for cross ventilation in your living room at least. Expecially that long lobby, it will be dark at the end of the day.

PropertiesRe: Please Kindly Criticize This 3bedroom Plan. by Heymus(m): 7:39pm On Oct 08, 2020
Nbotee:
Why is ur backyard balcony d only part of the building with access to the stairs?
That's not true, there are 2 staircase in that building, one for the entrance and other for the exit from kitchen (excape route).
To the op kindly tell your Architect to open the exit staircase outside not inside the balcony on the ground floor.
Reasons are
1. The staircase is not meant for the flat on the ground floor so why opening it in the apartment?.

2. This will enable the people using the upper floor to do anyhow on another people's balcony when they are trying to access the staircase.
PropertiesRe: On-going Construction Of 4bedroom Duplex For A Nairalander by Heymus(op): 4:59pm On Sep 21, 2020
We're done with the filling of the spaces

PropertiesRe: Construction Of 5bedroom Bungalow For A Nairalander by Heymus(op): 5:25am On Sep 19, 2020
Fonyeri:
Good job.
Thanks alot sir
PropertiesRe: Construction Of 5bedroom Bungalow For A Nairalander by Heymus(op): 1:08am On Sep 19, 2020
Johntemmy:
nice work bro.
Thank you sir.
PropertiesRe: Construction Of 5bedroom Bungalow For A Nairalander by Heymus(op): 11:36pm On Sep 18, 2020
Getintouch2004:
Commendable!
Very fast
Thank you sir. We're here for you.
PropertiesRe: Construction Of 5bedroom Bungalow For A Nairalander by Heymus(op): 11:25pm On Sep 18, 2020
Duration for this phase of work is 5days.