Properties › Re: My 4 Bedroom Project by Larwin(m): 6:50am On Jul 11, 2016 |
Chelseafan1: Lol....boss, major huddle has not passed o, na finishing be another crazy aspect wey collect money pass. Tiling Painting Fencing Kitchen cabinet Beds Wardrobes Living room furnitures and gadgets. Dining Fittings (WC nd co) Interior Decor Interlocking tiles for compound Gate. Na when u enter all ds one, e go be like say u just dey start building all over again.....lool House too dey chop money no be small.
Rough estimate, this beautiful edifice needs like another 2 to 3m to make it look sweet and very livable. God go provide my oga. All ds no b wàhálà na. Na tó Get artisan with correct brain  |
Properties › Re: Advice On Building A 3 Bedroom Bungalow by Larwin(m): 6:21pm On Jul 10, 2016 |
larryblack007: The land is located at ayetoro-itele.... Any idea about the land there? I thank u all. Ayetoro-itele is a sedimentary environment though some part r basesment... Meaning it's a transition zone. Particular to your site, just try n get a good foundation, maybe raft. dnt cut cost here... |
Properties › Re: Civil Engineers Forum by Larwin(m): 1:32pm On Jul 10, 2016 |
Wat about Geotechnical engineers  |
Properties › Re: My 4 Bedroom Project by Larwin(m): 10:53am On Jul 10, 2016 |
bplenty: @Larwin
Your so right. When the time comes for painting trust me the best would be given to it. Thanks again Smile, I so much trust u jor.  |
Properties › Re: Advice On Building A 3 Bedroom Bungalow by Larwin(m): 10:48am On Jul 10, 2016 |
@larryblack007, where is your site located. Dat will speak a lot about studies or soil test u have to conduct. And eventually type of foundation to do. U can't just judge by sight seeing.
If you are sure the soil properties are OK and stable. Then you don't need any pillar what so ever. |
Properties › Re: 3 Bedroom Project At Shimawa, Expert Needed. by Larwin(m): 10:35am On Jul 10, 2016 |
Nice move, try and put borehole drilling in your initial plan... At most do a geophysical investigation to know the point you will drill. You will appreciate this later. |
Properties › Re: My 4 Bedroom Project by Larwin(m): 10:26am On Jul 10, 2016 |
bplenty: @Larwin
Off course I am smiling. Nor be small tin o. Major hurdle has been crossed. Yea, dats tru. Na just to use correct 3D wall decor bring d beauty out |
Properties › Re: My 4 Bedroom Project by Larwin(m): 9:56pm On Jul 09, 2016 |
My boss @bplenty, Weldone ó. I believe yr smiling nw. |
Properties › Re: My House Project Up To Living Level by Larwin(m): 11:01am On Jul 08, 2016 |
Congratulations, where is d location. Call us for house warming o |
Properties › Re: DIY: Project Management/Supervision Of Commercial Development [ogbomosho] by Larwin(m): 10:20pm On Jul 05, 2016 |
Mehn, I can only say wow. Weldone BITSWORKS. |
Properties › Re: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by Larwin(m): 8:28pm On Jul 05, 2016 |
mufutau55: Noted o, Oga mi.
Hajji M. Smile, thanks my boss.  |
Properties › Re: Cost Of Building Twins Flat Of 3 Bedrooms In Ibadan by Larwin(m): 8:46pm On Jul 04, 2016 |
Good to see people putting up structures in ibadan. Don't forget to contact me for your borehole drilling and geophysical investigations.
micbjrex, damizee, flexxydo, ricki, cityNG, mufutau55, nycobama and others.... God will give you all speed to complete your projects
Cheers |
Properties › Re: My 4 Bedroom Project by Larwin(m): 8:12am On Jul 02, 2016 |
Oga bplenty everything is making all sense now.... Weldone oga kolashangeone. |
Properties › Re: Building A Solar-powered Hostel - A Learning Experience by Larwin(m): 8:17pm On Jun 30, 2016 |
Just read through d whole thread, sir u did a great work here. I just hope you can find peace from within. That's the only thing that can satisfy u at such a time like this |
Properties › Re: My 4 Bedroom Project by Larwin(m): 2:20pm On Jun 29, 2016 |
@bplenty, thanks for the opportunity to work for you.... Let's move to the next step in a short while. |
Properties › Re: DIY: Project Management/supervision Of Hotel Development [ogbomosho] by Larwin(m): 12:12pm On Jun 29, 2016 |
This s massive. Am follow up sir. A very great work. BITSWORKS: Blockwork on the 2nd floor now at lintel level, we are making preparation to cast the roof beam and slab that will carry the roofing carcass.
We are using steel for the roof carcass and long span aluminium for the roof cladding. |
Properties › Re: Construction Of Detached 3bedroom Flats Of 2 Storey High@ G.R.A Sagamu In Progr by Larwin(m): 12:45am On Jun 29, 2016 |
kcsystems: KC SYSTEMS LTD
Architect and Builder
Construction Of Detached 3bedroom flats of 2 storey high@ G.R.A Ssgamu in Progress
PROGRESS OF WORKS 1) Concrete cast on column and lintel completed Good work sir, you r doing great. |
Properties › Re: Building 4 Flats Of 3 Bedrooms Each - Survey, Architecting And Construction by Larwin(m): 7:39pm On Jun 27, 2016 |
olumz1: Thanks for the quote. I still intend to shop around and if yours is the most reasonable quote, I will get back to you on the next step.
Cheers. Alright, Please note that most times its more than quoting. Your selection should be based on professionalism and quality of service. My Regards Sir. |
|
|
Properties › Re: My 4 Bedroom Project by Larwin(m): 4:59pm On Jun 25, 2016 |
Oga ricki am still expecting yr call o |
|
Properties › Re: Building 4 Flats Of 3 Bedrooms Each - Survey, Architecting And Construction by Larwin(m): 4:12pm On Jun 25, 2016 |
@olumz1 I hope your weekend is going cool. I already sent you an email to your mail box. Pls check.
Regards. |
Properties › Re: My 4 Bedroom Project by Larwin(m): 11:36am On Jun 25, 2016 |
Good job @kolashangeone |
Adverts › Re: Borehole Drilling and Geophysical Investigations From The Experts by Larwin(op): 3:51pm On Jun 24, 2016 |
Get your borehole drilled within 3hours
|
Properties › Re: . by Larwin(m): 3:19pm On Jun 24, 2016 |
Candour: How did i miss this thread?? Egunmogaji, congrats on your project. I'm a silent follower of this section as i also started a project recently coincidentally in the same Elebu.
I'm looking forward to 'stealing' some ideas from you as i progress 
Wish you an unencumbered finish bro Welcome on board.... You will surely learn a lot here from our tasty gurus.  |
Properties › Re: . by Larwin(m): 2:14pm On Jun 24, 2016 |
|
Properties › Re: Building 4 Flats Of 3 Bedrooms Each - Survey, Architecting And Construction by Larwin(m): 11:48am On Jun 24, 2016 |
olumz1: are you able to send me a quote for the borehole? olumz1@yahoo.com Ailt, will get that across asap |
Properties › Re: My 4 Bedroom Project by Larwin(m): 11:15am On Jun 24, 2016 |
bplenty: Thanks @Larwin. Will add u up for a chat. Cheers. I feel you bro. |
Investment › Re: Do Your Soil Testing With Ease Using Landmapper® ERM-02 by Larwin(op): 9:19am On Jun 24, 2016 |
ricki: hmmmmm My boss, what you doing here  |
Properties › Re: Construction Of A 4-bedroom Bungalow For My Mom...all Bedroom Ensuite. by Larwin(m): 8:00am On Jun 24, 2016 |
Chelseafan1: Thanks man, im not misleading anyone like Kopell thought, everything I quoted is the truth and nothing but the truth, how else can I prove it to him, I've given pple contact of the large expanse of land dey want to sell here, when dey are ready to buy, they shud come I'll take then to the sellers. Thats the amount my mom has spent on that building, no lies, shey some guys av already agreed its actually possible, I don't have time to come here and decieve people.
If I do not practice architecture, I av no problems at all, I av anoda well paying job I do, my income is enuf for me. Smile, I got u Bro. We r too young to tamper with our integrity now. Sell land dey go n collect yr commission if u feel like..... It's not a bad thing. The koko is genuity. Ppl believe in you. Mesef believe in you. Regards. |
Properties › Re: My 4 Bedroom Project by Larwin(m): 7:55am On Jun 24, 2016*. Modified: 8:47am On Dec 06, 2017 |
Thanks olumide4christ @bplenty I will be waiting for yr message or call. So as to. Discuss better. 08060288869
Regards. |