Properties › Re: The New CONCRETE STAMP Floor Finish! by Mayor78: 1:44am On Sep 26, 2016 |
This looks very good, but if I got you right, are you suggesting that you will first prepare the grounds, apply concrete and allow it cure for days ever before you return to do the impressions?? If above is the case what guarantees that the upper layer of concrete on which the impressions would be made will not disintegrate in a shorter period of 15years as stated with cars in/out the compound  Again you mentioned applying mesh wires in swampy areas, does your cost per sqm include the mesh where needed, as well preparing the ground to get a flat level field  |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Mayor78: 1:17am On Sep 26, 2016 |
Can somebody help to suggest the composition and equipments from solar energy that will allow me to have a minimum of 18hrs of electric power in the house enough to power at least two 1.5HP split unit, two fan, 2 televisions, standard fridge/freezer and couple of security lights/bulbs all at a time and bearing in mind the system will be 100% independent of any connections to external power generation systems PHNC or likes. Any help will be appreciated. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Mayor78: 11:45pm On Sep 25, 2016 |
parisbluefox: I need advice from the house please....I'm about to commence with the construction of a 4 bedroom bungalow and the builder sent me the quotation below for labour/workmanship. Please I would like to know if the amount he's asking for is reasonable!
SITE LOCATION: AGBOR, DELTA STATE.
1. PEGGING:....................30,000 2. DIGGING.....................40,000 3. FOUNDATION CONCREATE BLINDING:.............40,000 4. BLOCK WORK ( FOUNDATION)............180,000 5. FOUNDATION FILLING AND COMPACTION:............70, 000 6. FOUNDATION CONCRATE FLOORING:...................100,000 7. BLOCK WORK FROM DPC TO LINTEL:....................240,000 8. CASTING OF LINTEL:.........................................50,000 9. BLOCK LEVELLING:......................................125,000 10.CARPENTRY WORK:...............50,000 11. IRON WORK:......................40,000
===================================== TOTAL 965,000 NAIRA. Well I wouldnt say anything yet on other quotes from this your builder but it is either you mistyped the cost of block levelling @ 125,000 or he may be refering to something else. How can he qoute 240k for blockwork from DPC to Lintel as at No. 7 then charge 125k for levelling as in No. 9 perhaps after the lintel except if he is talking of chaining after last blocks which usually is between 2-3 blocks after lintel depending on structural specifications. If he is talking of just block levelling, the quote didnt make sense @125k given his quote 9 of 240k from DPC to lintel which is usually between 9-12 blocks again depending on design. Because hypothetically, assumming from DPC to lintel for your building is 10coaches, it then means that his qoute for each coach at that stage round the house is 24K per coach. If that is the case, then a 2or3 block leveling after lintel would workout at either 48 or 72k, which either way is far below the 125k he qouted. If you happen to find any spurious quote on a qoutation, you will better be on the side of caution as other items qouted are most probably spurious too. Again if variations are above 5-10% margin from the ordinary, accepting and qualifying the value and integrity of the quote is subjective but for me I wouldn't trust such builder and most likely not accept the quote. I didnt comment on blockwork for foundation as at No.4 @180k because using the above calculations 4 or 5coaches from foundation would be between 96 and 120k respectively. For most bungalows 4coaches is ideal except if your site is around the Tomopolo's Niger Delta!!  |
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:58am On Sep 24, 2016 |
Still coming...... You cant imagine the phone cards gone, latenight whatsApp messages to Abdulwastecx....the guy too no dey sleepooo! Even when you say make you leave message for early morning whatsApp return, you will hear kpom...he responded.
He is a workaholic, very detailed and down to earth personality. Always at your service as the Project Consultant Engineer.
More updates to come as work has progressed beyond the last...... |
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:51am On Sep 24, 2016 |
.......Did I forgot these.....
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:48am On Sep 24, 2016 |
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:47am On Sep 24, 2016 |
......so more katakata......
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:42am On Sep 24, 2016 |
.......so that this chaining will be possible round the attachment
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:40am On Sep 24, 2016 |
Then katakata start.....
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:38am On Sep 24, 2016 |
......and got this
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:35am On Sep 24, 2016 |
They got the alert!!!! Then applied local remedy using bicycle chain and double manpower each side of the wall as this........
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:31am On Sep 24, 2016 |
They were busy thinking of next wire tranfer and forgot a window here........
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:29am On Sep 24, 2016 |
.......more
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:22am On Sep 24, 2016 |
Then we have spaces or are they rooms yet!! clearly carved out......and
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:17am On Sep 24, 2016 |
..............and block work
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:10am On Sep 24, 2016 |
More block work
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:08am On Sep 24, 2016 |
......the bock work continued
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:06am On Sep 24, 2016 |
......then settig of blocks
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:04am On Sep 24, 2016 |
........more DPC or what we called German floor
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 6:00am On Sep 24, 2016 |
.....then rhis
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 5:56am On Sep 24, 2016 |
More compacting
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 5:48am On Sep 24, 2016 |
.....then compacting after torential down pour enabling near settlement of soils, one advantage of building during rainy season.
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 5:40am On Sep 24, 2016 |
......filling started
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 5:37am On Sep 24, 2016 |
......And progress
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 4:36am On Sep 24, 2016 |
.....and progress
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 4:36am On Sep 24, 2016 |
.....and progress....
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 4:34am On Sep 24, 2016 |
......as the work continue to progress
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 4:32am On Sep 24, 2016 |
..........then we have to call in these guys to ensure that we got sound bags
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 4:27am On Sep 24, 2016 |
......then the work continued
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 4:20am On Sep 24, 2016 |
......But not after Mallam fixed the submersible pumb (sumo is it?) That tall shiny thing eeh!
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 4:18am On Sep 24, 2016 |
Remember the borehole... It was real handy supplying water for the job
|
Properties › Re: Applying Lessons From Nairaland To Micro-manage Building 5BDR Duplex From Abroad by Mayor78(op): 4:04am On Sep 24, 2016 |
......well then these
|