Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 11:13am On Jul 22, 2022 |
More pictures from the plastering process
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 11:17am On Jul 22, 2022 |
More materials arriving
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 11:20am On Jul 22, 2022 |
Upstairs, and the ongoing plastering..........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 4:35pm On Jul 22, 2022 |
spyder880: What's the estimated number of bags of cement you plan to use for the plastering |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 4:39pm On Jul 22, 2022 |
rukyboy: Still counting, but it will get to 500 bags. 2 Likes |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by folyshow: 3:25pm On Jul 26, 2022 |
Engineer, the decking consumed up to how many bags of cements, please. The structure apparently has lots of beams which must've consumed more cements. spyder880: |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 10:22pm On Jul 26, 2022 |
folyshow: Almost 400 bags of cement. 1 Like |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by folyshow: 8:49am On Jul 27, 2022 |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:04pm On Jul 27, 2022 |
Inside a kitchen completed with rough walls.............. 1 Like
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:12pm On Jul 27, 2022 |
Starting work on the plastering for the outside walls.......... 1 Like
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:19pm On Jul 27, 2022 |
More from this work at this walls.......... 1 Like
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by Chriswazo(m): 3:46am On Jul 29, 2022 |
spyder880: Spyder, I don't know if u have already answered this question. Did you also use the nylon for the dpc of this building? What was the purpose for using the nylon at this decking level? |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 7:21am On Jul 29, 2022 |
Chriswazo: 1. Moisture retention in the freshly cast decking slab, the nylon makes quick drainage of water from below the slab difficult. This makes for good concrete curing practices. 2. Quality preservation for the decking wood, by keeping the wood separated from the decking slab, the quality of the wood remains high, this will allow me to reuse the wood for the next stages. Good morning. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by Chriswazo(m): 9:00pm On Jul 29, 2022 |
spyder880: Is alright sir |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by rukyboy(m): 9:29pm On Jul 29, 2022 |
spyder880: Can kitchens and bathrooms be left in plastered since they will be tiled |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 6:22pm On Jul 31, 2022 |
rukyboy:Yes they can be left unplastered if the plan is to use tiles adhesive. But in this method we are planning to apply the tiles with cement, so I usually plaster the walls and apply tiles on it with cement. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 7:06pm On Jul 31, 2022 |
More pictures from our work at this site..........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 7:11pm On Jul 31, 2022 |
More pictures.......
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by michlins(m): 7:12pm On Jul 31, 2022 |
We're still waiting for your call. We desire to be a part of this project |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by TCD: 10:48am On Aug 01, 2022 |
spyder880: Hello Spyder. Coukd u share contact of your architect? How much is it for drawings for 4 bed room bungalow and for 4 bed duplex |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 12:45pm On Aug 01, 2022 |
TCD: Call Nnamdi on 08061116988. Thanks. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 7:17am On Aug 02, 2022 |
Work goes on in this site, more pictures later today. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 5:34pm On Aug 02, 2022 |
Restocking our cement today.........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 5:35pm On Aug 02, 2022 |
Work in progress today.........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 5:40pm On Aug 02, 2022 |
Side of the house, still being done today...........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 10:49pm On Aug 05, 2022 |
Concluding the back of the house.........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 10:54pm On Aug 05, 2022 |
Front...........
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:16am On Aug 06, 2022 |
We are poised to start working on the ceiling of this house starting from today. We will be using POP. |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by folyshow: 7:24am On Aug 07, 2022 |
Engineer, please like how many tons of steel rods was utilized for the DPC & decking, approximately? Thanks spyder880: |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 8:12am On Aug 07, 2022 |
folyshow: I will check this later. Thanks. 1 Like |
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 9:38am On Aug 09, 2022 |
Starting to buy materials for the POP ceiling works............
|
Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(m): 11:43am On Aug 10, 2022 |
More pictures from our works here, ..........
|
(1) (2) (3) ... (14) (15) (16) (17) (18) (19) (20) ... (33) (Reply)
Prince Ebeano Supermarket In Lekki On Fire / How Much Will I Need To Roof This 3 Bedroom Bungalow - / What Are The Pros And Cons Of Flat Roof Design In Nigeria
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 25 |