₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,326,323 members, 8,426,057 topics. Date: Saturday, 13 June 2026 at 03:15 PM

Toggle theme

Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ - Properties (12) - Nairaland

Nairaland ForumNairaland GeneralPropertiesIsheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ (34449 Views)

1 2 3 ... 9 10 11 12 13 14 15 ... 23 Reply (Go Down)

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 2:01pm On Aug 02, 2022
Benfornimo:
Is these house a smart house..... Following URL tread want to compare to another I saw, when u finish the project sir.
No problem sir.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 2:19pm On Aug 05, 2022
Stay tuned

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 1:30pm On Aug 07, 2022
...
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by ImperialCovfefe: 11:54pm On Aug 12, 2022
Kudos, bro. Regarding the windows, do you intend on adding a hood during finishing/plastering? In general, can you please comment how you deal with frameless windows without hoods that are not perfectly flushed with the enclosing walls?

Thanks
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 8:22am On Aug 13, 2022
Anxiously waiting for the next stage.

Good morning Dennis.. After internal first stage conduit work. What's next? Windows or plastering. I can only take on a stage at a time with months interval.. I would appreciate ur recommendations
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 11:01am On Aug 13, 2022
ImperialCovfefe:
Kudos, bro. Regarding the windows, do you intend on adding a hood during finishing/plastering? In general, can you please comment how you deal with frameless windows without hoods that are not perfectly flushed with the enclosing walls?

Thanks
Thank you very much for your time on our thread and to your questions.

Yes, we would be doing window hoods.
I don't do complicated designs.
I keep it simple and yet smart.
All windows will have the hood. Both frameless and casement.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 11:04am On Aug 13, 2022
BiigTee:
Anxiously waiting for the next stage.

Good morning Dennis.. After internal first stage conduit work. What's next? Windows or plastering. I can only take on a stage at a time with months interval.. I would appreciate ur recommendations
Good morning Sir.
In my own way of doing things.
Ensure that you have your windows ready before Plastering so that the bricklayers don't have to come back and charge you differently to do your window Plastering and dressing.

After Roofing.
- First floor plumbing and Electrical piping is what I do.
- Followed by Windows
- Plastering can then take place.
- Wiring
- POP ceiling and wall screeding (In and Out)
- Door installation at least the frames for a start.
- Tiling
- Plumbing fittings
- Etc
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 7:14pm On Aug 13, 2022
Stay tuned for updates here soon

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 8:11pm On Aug 13, 2022
God bless you man
Dennis3D:
Good morning Sir.
In my own way of doing things.
Ensure that you have your windows ready before Plastering so that the bricklayers don't have to come back and charge you differently to do your window Plastering and dressing.

After Roofing.
- First floor plumbing and Electrical piping is what I do.
- Followed by Windows
- Plastering can then take place.
- Wiring
- POP ceiling and wall screeding (In and Out)
- Door installation at least the frames for a start.
- Tiling
- Plumbing fittings
- Etc
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 8:59am On Aug 14, 2022
BiigTee:
God bless you man
You are welcome.
Do have a beautiful day.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 5:43pm On Aug 14, 2022
.
.
.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 7:14am On Aug 15, 2022
Good morning followers

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 7:03am On Aug 18, 2022
Good morning Viewers
Keep following up with us.

Plastering is gonna commence 2nd week of September. So stay tuned. It's gonna be interesting.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 9:22am On Aug 19, 2022
Good morning

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 7:20pm On Aug 19, 2022
.
.
.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 8:11pm On Aug 20, 2022
.
.
.
Thank you for following up with us here

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 11:46am On Aug 21, 2022
.
.
.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 6:32pm On Aug 21, 2022
.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 10:22pm On Aug 22, 2022
Counting down to Plastering
Stay Tuned
Follow us
The thread is gonna get busy soon.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 2:55am On Aug 24, 2022
Update coming soon

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 8:35pm On Aug 26, 2022
...

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 1:37pm On Aug 27, 2022
.
.
.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 10:44am On Aug 29, 2022
Good morning Viewers

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 5:56am On Aug 31, 2022
Starting Plastering in 2nd week of September.
Stay tuned.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 7:16pm On Sep 02, 2022
Good evening Viewers
We are still counting down to Plastering...

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 8:05pm On Sep 05, 2022
.
.
.
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 2:19am On Sep 09, 2022
Counting down here

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 10:09pm On Sep 10, 2022
As promised.
We are starting Plastering here on Monday.
Some materials already procured today.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 8:01am On Sep 12, 2022
Plastering to commence this morning...
Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 6:07pm On Sep 12, 2022
Scaffolding works set to commence immediately from the outside too.

It was quite a heavy rainy day today. So our Plastering works would commence on the inside for now.

Whenever the weather is clear and sunny
We do external Plastering

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op):
Work update from here.
Madam's room.

Re: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by Dennis3D(op): 5:29am On Sep 14, 2022
Finishing look of the Madam's room now...

1 2 3 ... 9 10 11 12 13 14 15 ... 23 Reply

New: Luxury 3 Bedroom Terrace + 1 Bed BQ @ Abraham Adesanya AjahConstruction 4 Massive Bedroom With Garage All Ensuit7-bedroom Duplex + 2-bed Bq On 800+sqm @ Tijani Bello St Ojodu By Omole 1234

Can A Rented Apartment Contribute To The Downfall Or Growth Of A Tenant?43-year-old Realtor Jimi Folarin Missing In LagosWhat Is Land Banking? #unregretful Investment