Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,156,503 members, 7,830,514 topics. Date: Friday, 17 May 2024 at 12:35 AM

Second Niger Bridge: Asphalt Laying And Street Light Installation Begins - Politics (8) - Nairaland

Nairaland Forum / Nairaland / General / Politics / Second Niger Bridge: Asphalt Laying And Street Light Installation Begins (64930 Views)

Concrete Vs Asphalt Roads: Pros And Cons Of Each / VIDEO : Julius Berger Begins Asphalt Laying Of 2nd Niger Bridge, Streetlights / My Visit To Second Niger Bridge Site Onitsha Anambra State-photos (2) (3) (4)

(1) (2) (3) ... (5) (6) (7) (8) (9) (10) (11) ... (14) (Reply) (Go Down)

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Landlord97: 7:10pm On Aug 18, 2022
kingthreat:
All these for the most ungrateful part of Nigeria.
THUNDER FIRE YOU FOR SAYING THIS RUBBISH,DO YOU KNOW HOW MUCH ANAMBRA AND DELTA STATES CONTRIBUTE S TO THE NIGERIAN GOVERNMENT COMPARING THIS EVER TAKING PROJECT,IS ACTUALLY NIGERIAN GOVERNMENT THAT IS UNGRATEFUL.

2 Likes

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by casualobserver: 7:11pm On Aug 18, 2022
Elliotwaveforec:


I don't like him because of his nepotism and his foolish fulanisation agenda; but he has tried for infrastructures.

This is Agbara Badagry Expressway, Lagos state. Good job!

I am not sure if this so called Fulani agenda. With due respect it is the talk of mediocre minds. It is impossible to Fulanis or islamize Nigeria. Every head of state puts people he can trust to head the security agencies. Do you know there were coup attempts against Jonathan and Osinbajo? Do t forget Buhari himself was overthrown by a coup. So imho it is understandable that he puts his people in key security positions.

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by nkemjika6006(m): 7:11pm On Aug 18, 2022
When will they finish this thing abeg
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Morgan9(m): 7:11pm On Aug 18, 2022
Biodun556:
In terms of infrastructure from 1999 till date, Buhari government is number one
Thunder fire u
To ur 4th generation
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by asanausana91: 7:13pm On Aug 18, 2022
PresidObi:
It has been like this in the last one year. I pass the area daily.
you are not serious.

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by captianfreeman(m): 7:13pm On Aug 18, 2022
How many times did he visit Adamawa in the last four years?
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by TheGoodJoe(m): 7:13pm On Aug 18, 2022
comodo:

Please can someone educate me on why this bridge must be tolled. And how many of such infrastructure is tolled in d country. I don try to explain to pipu but be like I no dey make sense.

Because of borrow borrow from international bodies and CBN. Some way, the money siphoned must be paid back.

So, they will toll the bridge to repay CBN and co.
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by sammhi(m): 7:14pm On Aug 18, 2022
Dannyset:
Hopefully, some people will be grateful.
Can't imagine someone is already lying that it has been like this for over a year.

I passed through this bridge on my way to Oko village in Asaba last year Oct., and what I am seeing now is a great improvement on what was done then.

May you all be cured from the spirit of lying.
U must be an idiot .
Same President built railway to Niger republic built pipelines to Niger , imports fuel from Niger republic and even bought cars worth 1bn for them
But it is a bridge built with our Money and to be repaid back by toll they should be grateful for ...
U must be high on expired weed
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by edosignature(m): 7:16pm On Aug 18, 2022
100% true.
Vote Atiku Abubakar for president 2023.



Biodun556:
In terms of infrastructure from 1999 till date, Buhari government is number one

Vote Atiku for president 2023.
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by moshino(m): 7:23pm On Aug 18, 2022
Biodun556:
In terms of infrastructure from 1999 till date, Buhari government is number one

Violence Loading.......
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by yusluvad(m): 7:26pm On Aug 18, 2022
Biodun556:
In terms of infrastructure from 1999 till date, Buhari government is number one
It's arguably true. But the cabals have grounded the Nigeria economy to zero...
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Rupertek: 7:27pm On Aug 18, 2022
PresidObi:
What will APC campaign with in the South east?

Nothing.

They should just apologise to the south east and kneel down and beg.

Apart from insecurity and destabization, the south east got nothing because of the 5% policy.


Thank you Obasanjo for building the Onitsha - Owerri dual carriage road without any long stories. Buhari has been on the only project he's doing in the south east for 7 years and still never completed it.

Apart from dualizing Onitsha owerri road, what other project did PDP carried out in south east for 15 years? Absolutely nothing. Jonathan we supported massively in 2015, what single project did he do in south east? None.
Buhari is doing second niger bridge that successive PDP governents have used as campaign trick, Onitsha/ Enugu road, Enugu/ PH road, Nnewi/Okigwe road and other ones. You should be ashamed of your hatred

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by chypotenti(m): 7:28pm On Aug 18, 2022
PresidObi:


What did they do on this? 7 years to do a kilometer bridge?
Haba my guy, 7yrs kwa Abeg them try for this one. Remember they gave us a time frame as per when the bridge will be ready for use and from what I am seeing, them go deliver for sure...it will be ready for use by February Next year grin grin grin

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Invitationn: 7:29pm On Aug 18, 2022
TheGoodJoe:


You people keep talking this fake mediocre points looters have filled your heads with.

Investment is what will bring returns brings economic growth.

No family can grow economically without investing in a business that will bring returns.

If anyone wants economic growth, you invest in where you get returns before talking of bridges.

Now there is no revenue, is it not pathetic that the only solution is to tax individuals and businesses.

That means, the so called infrastructure can not bring economic boost.

Invest in the people and businesses to get economic boost.

Think basic economics.
Apparently, you seem to have set out for this path of ignorance. It seems to suit you too.
So, Godspeed SeƱor!
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Ingocof(m): 7:30pm On Aug 18, 2022
Biodun556:
https://twitter.com/DeeOneAyekooto/status/1560301044172824577?t=S8ugkBetSd5U5fNll9f8Xg&s=19


No government has the interest of Igbo people at heart like this regime yet Buhari is the most hated being in Igbo land.

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by asanausana91: 7:31pm On Aug 18, 2022
PresidObi:
What will APC campaign with in the South east?

Nothing.

They should just apologise to the south east and kneel down and beg.

Apart from insecurity and destabization, the south east got nothing because of the 5% policy.


Thank you Obasanjo for building the Onitsha - Owerri dual carriage road without any long stories. Buhari has been on the only project he's doing in the south east for 7 years and still never completed it.
the Tafawa Balewa that build the first Niger bridge was killed by the same igbos so iam not surprised.
From your mind you wish that the bridge will just fall so that you will have something you blame Buhari.
The gej who is your messiah doesn't have one single project in the east.
PDP have no single project in the east for 16 years yet you guys worship them.

3 Likes

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Ingocof(m): 7:31pm On Aug 18, 2022
PresidObi:
It has been like this in the last one year. I pass the area daily.


You are a product of Peter Obi, your lies are like his.
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Nobody: 7:31pm On Aug 18, 2022
grin Great Job I just wish they are better barrier so that Suicides won't be plenty on that bridge.

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Bouncing2(m): 7:32pm On Aug 18, 2022
New shooting site for Nollywood loading grin

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by egunna(m): 7:34pm On Aug 18, 2022
PresidObi:
It has been like this in the last one year. I pass the area daily.
is a lie.thats how one idiot came here d other day to claim he passes dere every day and that no work was ongoing,,boom now,this.o don't believe u.give credit where and when it is due,u wont die.

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by AmehTsaev: 7:34pm On Aug 18, 2022
Buhari tried for the SE...make we tell ourselves the truth

2 Likes

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by MuslimMuslim: 7:35pm On Aug 18, 2022
Biodun556:
In terms of infrastructure from 1999 till date, Buhari government is number one
With 90% of federal roads in terrible condition, no single megawatts added to the national electricity grid what infrastructure exactly did he work on?
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by egunna(m): 7:37pm On Aug 18, 2022
PresidObi:


Prove it? Has the link roads even been done?

Show pictures?
who cares,we are happy with what we are seeing.meanwhile,obi will never be president in this country.u can take that to the bank.

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Parachoko: 7:37pm On Aug 18, 2022
ogatboy:


Lol. Be deceiving yourself. Every project under Buhari was started in PDP time even electoral reform. Name one project started by Buhari and completed by Buhari. NONE
Can you show evidence the PDP started the Lagos-Ibadan expressway?

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Haykings02: 7:37pm On Aug 18, 2022
PresidObi:
What will APC campaign with in the South east?

Nothing.

They should just apologise to the south east and kneel down and beg.

Apart from insecurity and destabization, the south east got nothing because of the 5% policy.


Thank you Obasanjo for building the Onitsha - Owerri dual carriage road without any long stories. Buhari has been on the only project he's doing in the south east for 7 years and still never completed it.

Is very easy to identify bad belle Igbos, they will NEVER appreciate anything good thing Buhari do for them. Meanwhile, this is the same project that PDP was awarded several times.

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by egunna(m): 7:38pm On Aug 18, 2022
chinae:


Bridge that is surrounded with toll gates which was first completed before conceptualization of the main bridge
wud u rather it is left undone?

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by Parachoko: 7:40pm On Aug 18, 2022
Creamz:


This is commendable from the APC government, but maybe you should Google more what Nigeria was before 1999. Most dualised Road in the country was done by the PDP government
Can you list out the dualise road let's see.
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by egunna(m): 7:40pm On Aug 18, 2022
SpatialKing:

Number what?

OBJ gov constructed LNG plant
Buhari government focused most on infrastructures that favored bandits and his Fulani

What happened to

Ajaokuta steel factory
Constructing a bigger seaport in Akwa Ibom
Constructing another LNG plant in Ojuta
Restoring the fabric and Textiles factories in Kaduna
Restoring Jos steel rolling mile
Building new refineries
hmmmm.the sun will always rise.u can decide not to see it though.all those things u are listing,if it was easy,y didn't past administration do them.since buharis infrastructure favours bandits,pls don't use dem

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by ogatboy(m): 7:41pm On Aug 18, 2022
Parachoko:
Can you show evidence the PDP started the Lagos-Ibadan expressway?

You dey find evidence?? When you begin pass the road?
Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by asanausana91: 7:41pm On Aug 18, 2022
SpatialKing:

Number what?

OBJ gov constructed LNG plant
Buhari government focused most on infrastructures that favored bandits and his Fulani

What happened to

Ajaokuta steel factory
Constructing a bigger seaport in Akwa Ibom
Constructing another LNG plant in Ojuta
Restoring the fabric and Textiles factories in Kaduna
Restoring Jos steel rolling mile
Building new refineries
who killed those factories you mention?
Kaduna arewa textile
Jos steel rolling mill
Etc were killed by the same obasanjo.
Even Nigeria airways was killed by PDP.
Atleast Buhari has tried rebuild infrastructure that were abandoned for years.

1 Like

Re: Second Niger Bridge: Asphalt Laying And Street Light Installation Begins by johnjose68: 7:43pm On Aug 18, 2022
PresidObi:
What will APC campaign with in the South east?

Nothing.

They should just apologise to the south east and kneel down and beg.

Apart from insecurity and destabization, the south east got nothing because of the 5% policy.


Thank you Obasanjo for building the Onitsha - Owerri dual carriage road without any long stories. Buhari has been on the only project he's doing in the south east for 7 years and still never completed it.

Does south east exist? What is south. East?

(1) (2) (3) ... (5) (6) (7) (8) (9) (10) (11) ... (14) (Reply)

Yemi Osinbajo And Parents During Graduation Ceremony (Throwback Photo) / Pictures Of Eid Celebration At The Aso Rock Villa. / Edo Election: Wike Held Hostage In Hotel Room - PDP Raises Alarm

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 40
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.