Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,151,066 members, 7,810,981 topics. Date: Saturday, 27 April 2024 at 07:58 PM

FG To Commence Work On Three Coal Power Plants - Business (5) - Nairaland

Nairaland Forum / Nairaland / General / Business / FG To Commence Work On Three Coal Power Plants (20375 Views)

Azikel Refinery To Commence Operations In 2018 / Travelex To Commence Sales Of Forex To Bdcs Today / Dangote/black Rhino Group To Construct $10bn Power Plants In Kano (2) (3) (4)

(1) (2) (3) (4) (5) (6) (Reply) (Go Down)

Re: FG To Commence Work On Three Coal Power Plants by charismaticdave(m): 5:18pm On Jan 05, 2015
Vikkie14:
Good move FG
But
I think it's time we go "Nuclear".
BTW, we should be utilizing our "solar" energy more effectively than even this coal and hydro projects. If we could combine solar with coal with Nuclear(exempting Hydro<cox water level may drop anytime> and thermal<that consume fuel>wink, Nigeria will be a better place. Imagine the job these will generate---millions of job seekers will be taken off the "job-market".

But, last time, i read about China spending 25Billion to generate 22,000MW, and Nigeria spending 35Billion to generate 2500MW, though i'm not sure how true this is, but, it's time we focus on the "future" and that future is Nuclear.

IT'S TIME TO GO NUCLEAR NIGERIA


We can't go Nuclear yet, we don't have the manpower to go nuclear, one step at a time
Re: FG To Commence Work On Three Coal Power Plants by Hardetayour: 5:27pm On Jan 05, 2015
Vikkie14:
Good move FG
But
I think it's time we go "Nuclear".
BTW, we should be utilizing our "solar" energy more effectively than even this coal and hydro projects. If we could combine solar with coal with Nuclear(exempting Hydro<cox water level may drop anytime> and thermal<that consume fuel>wink, Nigeria will be a better place. Imagine the job these will generate---millions of job seekers will be taken off the "job-market".

But, last time, i read about China spending 25Billion to generate 22,000MW, and Nigeria spending 35Billion to generate 2500MW, though i'm not sure how true this is, but, it's time we focus on the "future" and that future is Nuclear.

IT'S TIME TO GO NUCLEAR NIGERIA
Bro. U need to read up about Fukushima Power Plant. U want Nigeria that has bad maintenance culture to go and start generating with Nuclear, that's the very wrong move to take now.
Re: FG To Commence Work On Three Coal Power Plants by Hardetayour: 5:31pm On Jan 05, 2015
kennaustine:
All of you crying white elephant project please you must show me the elephant in the project. Or what elephant project is whiter than the Lagos-Badagry Expressway scam that was "attracted" by Fashola since 2008 for 10 Billion Naira and dated to be completed by 2015. This is 2015, the road hasnt even gone half, with Nigerian suffering mindlessly on it and transporters ripping of helpless citizen gladly. When the Fed Govt wanted to take over Fashola cried to high heavens because the source of his godfathers looting bag [CCECC]was threatened. This is 2015. Fashola is going. The road is not finished. And Lagosians are still suffering.
.... but I don't care no more. Cause we ve all seen propaganda in APC work clothes. Fashola is going. And Uncle Jimi is coming. grin
LOOOL. What do u really know? U think Lagos Ibadan expressway is a Lagos state project? Go and do ur research well. Abi when Lagos Ibadan expressway turn State road?
Re: FG To Commence Work On Three Coal Power Plants by Hardetayour: 5:33pm On Jan 05, 2015
Collynzo9:
Way to go!
There is no serious country with even half of our population that doesn't use coal as its primary source of energy.
USA (50%)
UK (50%)
Germany (70%)
South Africa (90%)
In all Coal powered plants account for over 50% of the words electricity. When you consider other so called sources that are available, that is a huge figure.
Coal is cheap, convenient and are more efficient in terms of megawatts produced than all these 100mw gas plants littered around.
A single coal power plant can produce more than the 4500MW we currently generate from several sources.
Na when Oyel finish una know sey coal dey waste for one place abi. Nonsense.
Re: FG To Commence Work On Three Coal Power Plants by tola9ja: 5:37pm On Jan 05, 2015
like father like son stealing is not corruption

1 Share

Re: FG To Commence Work On Three Coal Power Plants by irewolepeter(m): 5:39pm On Jan 05, 2015
priscaoge:
Jonathan is working.....!

GEJ Keep doing it!

You are coming back to complete ur good works whether d DEVIL like it or YES cheesy

GEJ till 2019!!!!! kiss
I support you but......


...

Gej till 2015
Re: FG To Commence Work On Three Coal Power Plants by Nobody: 5:48pm On Jan 05, 2015
Collynzo9:
Way to go!
There is no serious country with even half of our population that doesn't use coal as its primary source of energy.
USA (50%)
UK (50%)
Germany (70%)
South Africa (90%)
In all Coal powered plants account for over 50% of the words electricity. When you consider other so called sources that are available, that is a huge figure.
Coal is cheap, convenient and are more efficient in terms of megawatts produced than all these 100mw gas plants littered around.
A single coal power plant can produce more than the 4500MW we currently generate from several sources.

I have read your previous comments regarding the power sector in Nigeria and you seem to me, to be a fellow strong coal advocate.

Kudos dude, I just don't know what Nigeria has been waiting for all these years, but I guess that's just the surreal nature of Nigeria on display; A country stuck in limbo.
Re: FG To Commence Work On Three Coal Power Plants by Vikkie14: 5:49pm On Jan 05, 2015
Hardetayour:
Bro. U need to read up about Fukushima Power Plant. U want Nigeria that has bad maintenance culture to go and start generating with Nuclear, that's the very wrong move to take now.
Bro, you should have been the one to read that.#NoBeef. Fukushima reactor problem is not because of "poor maintenance" or due to "maintenance" related issue. It'a caused by a major Earthquake which cause a 15metres tsunami to hit the Fukushima Nuclear reactor. That incident make them evacuate 150,000 people within the radius of radioactivities and radiation coming from the "world most dangerous room---the reactor". So my bro, this isn't about maintenance disaster on the part of Japan. Even the Chernobyl Nuclear Disaster isn't cause by "Negligence", and presently, peopl from chernobyl, are the only "permanent" nuclear refugee in the world. So now that africa and especially Nigeria has less "natural disasters", it would have been a "fine" thing to go Nuclear if we want to conquer this power issue though the "money,cautions,maintenance,Years" in building such is a very lenghty one but IT'S NOT IMPOSSIBLE.
If we were to dwell on Nigeria "poor maintenance", aint we the Nigerian we are talking about? So, it's feasible but an enormous task to do bro.
Re: FG To Commence Work On Three Coal Power Plants by Nobody: 5:52pm On Jan 05, 2015
ooshinibos:


solar power will do more ...most of the contries you mentioned have dumped coal ..do your research

Naive.

Solar power would do more than coal?

Oh my days!

1 Like

Re: FG To Commence Work On Three Coal Power Plants by xkris11(m): 5:53pm On Jan 05, 2015
All na wash.
Re: FG To Commence Work On Three Coal Power Plants by Vikkie14: 5:54pm On Jan 05, 2015
charismaticdave:



We can't go Nuclear yet, we don't have the manpower to go nuclear, one step at a time
we have the manpower, but what we lack is its technology---i mean Nuclear technology. Even UN would view us as "ambitious"---meaning we are secretly planning on developing Nuclear weapon. I agree a step at a time, but when will the NEXT step of building that starts? The problem we have most is that of our Government not sponsoring Researches on various field.

1 Like

Re: FG To Commence Work On Three Coal Power Plants by wierdpsycho: 5:58pm On Jan 05, 2015
UchihaMadara:


Naive.

Solar power would do more than coal?

Oh my days!
thank heavens smart people like u still exist...........
Re: FG To Commence Work On Three Coal Power Plants by Vikkie14: 6:00pm On Jan 05, 2015
highmood:

would you like the nuclear plant sited in ur community owing to the negative effects on the people living close to it if mismanaged?
Firstly, your comment is abusive bro.
On the other hand if they want to, they are free. Every Nuclear sites in the world i have knowledge about are not build around residential area, they are sited far away from the city. Take Chernobyl city for instance, that city was created majorly for workers working at the Nuclear site only for civilian to pour into the city. The day the Reactor mishap happened, all the people were taken on exodus out of the city. There are alot of Hazards related with Nuclear reactors, but with caution, civilian would be hit less from malfunctions from the facility. So just forget about where to site it, a "secluded" site would be created for such an hazardous facility.
Re: FG To Commence Work On Three Coal Power Plants by Nobody: 6:03pm On Jan 05, 2015
Obinoscopy:
http://www.dailytimes.com.ng/article/fg-commence-work-three-coal-power-plants

I believe some govt officials do read Nairaland.

The issue of power generation with coal was treated some days....and someone is talking about it.

Good one, if likely 3000MW + is added to the 4000MW + we have now...
Oh boy, difference go dey.

1 Like

Re: FG To Commence Work On Three Coal Power Plants by anonimi: 6:05pm On Jan 05, 2015
hazyfm:
PROPAGANDA

WHY NOW? WHAT HAVE THEY BEEN DOING SINCE 2011?

WHY COMMENCE A PROJECT U WON'T FINISH?

I thought government is about CONTINUITY, is it not

Oh, I forgot that the pretending A-Looter old soldier is too daft to understand this basic element of governance hence he cancelled Lagos metro project 30 years ago despite incurring breach of contract costs shocked
Unlike Dr. Goodluck Ebele Jonathan who continued, updated & improved the plans & projects of his predecessors.


BTW, why don't you ask Project Engineers around you the life cycle of this type of plant from Conception, Design, Costing, Contracting, Execution to Handover & Testing.
A little extra education does not hurt anyone wink
Re: FG To Commence Work On Three Coal Power Plants by mahyowah(m): 6:08pm On Jan 05, 2015
priscaoge:


Buhari said and I quote..."God willing, we will not stop the Agitation for the total implementation of Sharia in the COUNTRY ". Now tell me what u understand by this statement! cool
it hurt me that sentiment has taken away some pple's education. how can a man islamise a country that has had a history of diverse culture & religion for a long time. for many years northerners have led this country, none has islamised us why now? is it possible? pls have a rethink.
Re: FG To Commence Work On Three Coal Power Plants by Hamatrony(m): 6:08pm On Jan 05, 2015
priscaoge:


Women are taking over politics please wake up tongue....Days are gone when we are been neglected n left @ d background! Jonathan is working,even d blind can see it clearly!

Well I school in UK not France cheesy cheesy

Go GEJ!!!!!!!!!

And y shuldnt u ladies tak it al? Cn u tel me y men ar more?, lemme ansa dat 4 u, u ar meant to stay in d kitchen nt politics grin

Did u realise dat u just implicate ursef, y study in UK if d standard of education in ur country bein lead by ur jonathan is ok? Y do ladies tink lik ds, chai!!! undecided u ar sayin rubbish cos u neva experience any minor strike lik 2-5months left alone 2years strike.....u knw wat!!, go back 2 ur UK n contribute wateva u lik nt Nigeria whr we citizens seize 2 remain fools, we cnt main blind 2 reality naa, enuf is enuf!!!

I knw ladies ar so strict, ur vote alone out of majority changes ntin, wat is d need ooO lolzzz grin

GMB/OSJ 2015 4 #CHANGE cheesy
Re: FG To Commence Work On Three Coal Power Plants by Vikkie14: 6:11pm On Jan 05, 2015
slimfit1:



Do you know anything about nuclear at all, i doubt if you do. Do you have knowledge about Nigerian's attitude on safety. However, as long as they construct it in your backyard its fine by me. If they cant maintain a road you think they can maintain nuclear power. People just come here and mention names of things they don't really understand thinking its generator they are dealing with.
grin surely yu are a pessimist. Whoever you are, am sure we should just debate this out and show me the stuff you are made off. So, you are saying am just ranting on something i didnt probably have knowledge about. #Dont make me tell you about History and Hazards accustomed with Nuclear reactor failure. This shows you really lack knowledge about what am typing out here. If you think Nuclear facility is something that could just be sited at a "backyard" then this show your level of knowledge about Nuclear facility. I would have love to challenge you on this nuclear stuff. I know that most of those criticising the move is mainly because of the news they heard in 2011 about the "fukushima nuclear reactor disaster". What most of you people fail to recognise is the fact that fukushima nuclear disaster is not due to maintenance problem---it's as a result of an earthquake causing a 15m tsunami to hit the facility. So just forget about "maintenance" here. Even the nuclear disaster of Chernobyl is not also by maintenance. Go and Check your Record well before airing your pointless facts here.
Even if Nigeria has a poor maintenance/management, who are the Nigerian? Is it not me and you and the rest? #Peace
Re: FG To Commence Work On Three Coal Power Plants by hazyfm: 6:12pm On Jan 05, 2015
anonimi:


I thought government is about CONTINUITY, is it not

Oh, I forgot that the pretending A-Looter old soldier is too daft to understand this basic element of governance hence he cancelled Lagos metro project 30 years ago despite incurring breach of contract costs shocked
Unlike Dr. Goodluck Ebele Jonathan who continued, updated & improved the plans & projects of his predecessors.


BTW, why don't you ask Project Engineers around you the life cycle of this type of plant from Conception, Design, Costing, Contracting, Execution to Handover & Testing.
A little extra education does not hurt anyone wink

Oga, Before i answer your question, Know this. I was not only referring to your Flag bearer, This goes to all politicians who wait till the last minute to start projects they know they won't complete. A Government with good strategic knowledge will take up this kind of project within the first and second year. Not 2 months to handing over ''Just saying ooo''
Re: FG To Commence Work On Three Coal Power Plants by ollyruffy: 6:18pm On Jan 05, 2015
Rubbish! Why now. Same stories since 1999.
Re: FG To Commence Work On Three Coal Power Plants by Frankestein08(m): 6:23pm On Jan 05, 2015
[quote author=alberto2k p

surry bruh, nigga moments grin
Re: FG To Commence Work On Three Coal Power Plants by Nobody: 6:27pm On Jan 05, 2015
Thank God for Mbaka who had d guts to tell Goodluck the simple truth. Now, they are bringing another news to cool the heated polity cos Enugu is a coal base. We cant be deceived anymore.

where is our 2nd Niger bridge?

1 Like

Re: FG To Commence Work On Three Coal Power Plants by obayaya(m): 6:31pm On Jan 05, 2015
dre11:
Does the president thinks that we are fools in this nations

Does he thinks the youths would be carjole with all this promise of this and that just to win votes

All this years..... Why didn't he fulfill all this programs
Why did he delayed to the last minute to start rolling programs that he will do this, he will do that.

All I keep hearing is rolling of elephant project just some few weeks to elections
Is it this programs that money for elections campaign or electoral spending going to come out.

I just don't understand the rush for all this programs and contract awarding at the tail end of his reign.

Dre!!!

Most of these contracts were awarded in 2012. Building power plants takes time..

Here's an article from September, 2011

www.247ureports.com/fg-to-establish-3000mw-coal-fired-power-stations-in-three-states/

google is your friend

1 Like

Re: FG To Commence Work On Three Coal Power Plants by Nobody: 6:33pm On Jan 05, 2015
Misogynist2014:
pollution

polution for where?

Abt 14 years ago, i saw some coal produced by some white men at Enugu International fair. The coal was in large cubes and didnt produce smoke while burning. We can get that technology to refine coal. Also, how do u think western ppl use coal? They refine it b4 usinh it.

1 Like

Re: FG To Commence Work On Three Coal Power Plants by slimfit1(m): 6:33pm On Jan 05, 2015
Vikkie14:
grin surely yu are a pessimist. Whoever you are, am sure we should just debate this out and show me the stuff you are made off. So, you are saying am just ranting on something i didnt probably have knowledge about. #Dont make me tell you about History and Hazards accustomed with Nuclear reactor failure. This shows you really lack knowledge about what am typing out here. If you think Nuclear facility is something that could just be sited at a "backyard" then this show your level of knowledge about Nuclear facility. I would have love to challenge you on this nuclear stuff. I know that most of those criticising the move is mainly because of the news they heard in 2011 about the "fukushima nuclear reactor disaster". What most of you people fail to recognise is the fact that fukushima nuclear disaster is not due to maintenance problem---it's as a result of an earthquake causing a 15m tsunami to hit the facility. So just forget about "maintenance" here. Even the nuclear disaster of Chernobyl is not also by maintenance. Go and Check your Record well before airing your pointless facts here.
Even if Nigeria has a poor maintenance/management, who are the Nigerian? Is it not me and you and the rest? #Peace


Alright then thanks for the info. Where are you from west east or north ma ?
Re: FG To Commence Work On Three Coal Power Plants by Modream: 6:43pm On Jan 05, 2015
This is d kind of news i wanna hear, keep doing ur best for this country Mr PRESIDENT.

1 Like

Re: FG To Commence Work On Three Coal Power Plants by dre11(m): 6:46pm On Jan 05, 2015
obayaya:


Dre!!!

Most of these contracts were awarded in 2012. Building power plants takes time..

Here's an article from September, 2011

www.247ureports.com/fg-to-establish-3000mw-coal-fired-power-stations-in-three-states/

google is your friend


Guy man
Check the link to the thread that the whole publication was copied from
Its was published today and a base article

So why is something of 2011 just springing up in year 2015
Re: FG To Commence Work On Three Coal Power Plants by donmalcolm21(m): 6:49pm On Jan 05, 2015
priscaoge:
Jonathan is working.....!

GEJ Keep doing it!

You are coming back to complete ur good works whether d DEVIL like it or YES cheesy

GEJ till 2019!!!!! kiss
where have you been since.
Re: FG To Commence Work On Three Coal Power Plants by priscaoge(f): 7:01pm On Jan 05, 2015
donmalcolm21:
where have you been since.

Lolest!

Have been around Dear!

Happy New Year!
Re: FG To Commence Work On Three Coal Power Plants by Chigold101(m): 7:18pm On Jan 05, 2015
Fairgodwin:
Hmmm

You people should please and please STOP telling us ''is set to commence," "is set to commence" everytime. Kilode?
If you people (government) are not tired of this your "is set to commence," we, the citizens, are tired of it.
#commence it immediately and tell us afterwards! Stop giving us FALSE HOPE everytime. Kilode nitori oloun?
tell me those projects that federal government said they commence that they didnt commence.

Tell me about that false hope they gave u...

1 Like

Re: FG To Commence Work On Three Coal Power Plants by obayaya(m): 7:26pm On Jan 05, 2015
dre11:



Guy man
Check the link to the thread that the whole publication was copied from
Its was published today and a base article

So why is something of 2011 just springing up in year 2015

The minister of Power was commenting on the progress so far and what the future holds for the power sector. He highlighted projects that are already underway but have not been delivered...

If you read the article again carefully, I'm sure you won't miss this part

but it is believed that the coal power plants could include the 3000 megawatts (MW) plant that is being developed by Zuma Power in Kogi state

1 Like

Re: FG To Commence Work On Three Coal Power Plants by Nobody: 7:36pm On Jan 05, 2015
Nigerians are really hopeless

When other nations are switching from coal to gas reduce pollution. Nigeria has enormous gas but would rather flare it and use coal.

Yet some people will come here and say GEJ till 3029.

What a hopeless nation

(1) (2) (3) (4) (5) (6) (Reply)

Jim Yong Kim Resigns As World Bank President / Banks Panic Over TSA Violation Sanctions / Ever Been Disappointed By An ATM Machine? Share Your Experiences

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 72
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.