Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,151,612 members, 7,813,008 topics. Date: Tuesday, 30 April 2024 at 03:34 AM

PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI (53308 Views)

Construction Process Of A 6 Flats (3 Bedrooms House) / ABUJA:CONSTRUCTION PROCESS OF TERRACE BUILDING BY MOORE / Construction Process Of The 3 Bedroom Block Of Four Flats In Warri (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (43) (Reply) (Go Down)

PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 4:45pm On Mar 16, 2015
We set to embark on the construction process of Triplet with block of flats.
As usual we advise our clients to carried out soil test and investigation because the subject site is questionable to carry 2 slab. From the result, we decided to adopt short bore pile.

The contract agreement has been signed after various discussion with our clients..

In the process of this construction, you will see where over 16 nos of 16mm reinforcement is being used for beam as against normal 4 or 6 .




.........watch out as we proceed!
MOORE - DESIGNBUILD LTD | We do structure right!

1 Like 1 Share

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 8:48pm On Mar 16, 2015
DAY 1:Mobilisation

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 6:44am On Mar 17, 2015
Artistic impression for the proposed development!

1 Share

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by eudoh940(m): 8:24am On Mar 17, 2015
Good mng boss. Nice one. Pls sir keep us updated.. Tnks. I am following
Patiently

1 Like

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:54am On Mar 17, 2015
eudoh940:
Good mng boss. Nice one. Pls sir keep us updated.. Tnks. I am following
Patiently
Definitely!
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by mufutau55(m): 3:01pm On Mar 17, 2015
This design is very nice... keeping my eyes on the construction..

Hajji M.
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:53pm On Mar 17, 2015
Delivered of reinforcement

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by Onuokwu: 7:33pm On Mar 17, 2015
segcymoor:
Artistic impression for the proposed development!

Any idea about the size of the plot?
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:12am On Mar 18, 2015
Onuokwu:

Any idea about the size of the plot?
Virtually a plot
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 2:37pm On Mar 18, 2015
DAY 2:setting out of piling points

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 4:37pm On Mar 18, 2015
Establishing pilling points. ..........ensuring getting it right from the onset

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by eudoh940(m): 7:16am On Mar 19, 2015
Choi. I am missing alot o. I do enjoy this part of d project. Pegging of pile points. So interesting. But more interesting wen one is pegging in water. Smiles...... grin
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by eudoh940(m): 7:24am On Mar 19, 2015
Tnk you sir. I learnt alot
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:54pm On Mar 19, 2015
We established piling machine. .....set to go!

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:40am On Mar 20, 2015
DAY 3;first point

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:45am On Mar 20, 2015
segcymoor:
DAY 3;first point

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 1:49pm On Mar 20, 2015
2nd point in progress!
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 7:36am On Mar 21, 2015
This particular piling is not far from our previous project: 450 diameter with 6m depth
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:24pm On Mar 24, 2015
Pilling work in progress!

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by Chekitaut: 11:15pm On Mar 24, 2015
Weldone...
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by eudoh940(m): 7:21am On Mar 25, 2015
Weldone. Sir. Oga check it out I hail oo
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by Chekitaut: 8:42pm On Mar 26, 2015
eudoh940:
Weldone. Sir. Oga check it out I hail oo
I thro salute bros... Oga segcymoor, we will do this again...

Chekitaut, just accurate quantity materials you need for project... Call us: Cement, Granite, Sand, Iron Rod
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by Chekitaut: 9:15pm On Mar 26, 2015
From Lagos-Island, Victoria-Island, Banana Island, Ikoyi, Lekki to Songotedo
[size=14pt]Granite= N4,350/Ton[/size](Transportation Fee included)
Minimum Order=60tons

[size=14pt]Stone Dust= N2,800/ton[/size](Transportation Fee included)
Minimum Order=60tons

Call Now: 08055545355, 08032887233
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:08pm On Mar 26, 2015
Grade 25 conctrete mixture

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 10:11pm On Mar 26, 2015
Chekitaut:
I thro salute bros... Oga segcymoor, we will do this again...
Chekitaut, just accurate quantity materials you need for project... Call us: Cement, Granite, Sand, Iron Rod
Will surely do....
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 1:53pm On Mar 28, 2015
DAY:7 schedule to complete the Piling points by this coming week.

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:25pm On Mar 31, 2015
I see a change.....where cement is being sold for a thousand!

3 Likes

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by eudoh940(m): 9:22am On Apr 01, 2015
@#Boss as per builder concern. Hehehe
grin
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by jodeci01: 1:19am On Apr 02, 2015
Nice design!
Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:05pm On Apr 02, 2015
We are rounding up the Pilling points tomorrow

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 9:56pm On Apr 03, 2015
As schedule we round up the Pilling points

Re: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by segcymoor(m): 5:06pm On Apr 06, 2015
Have a blessed Easter!

1 Like

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (43) (Reply)

That’s Not Inside The Abuja Mansion Of Africa’s Richest Man, Dangote / See The Tallest Building In Africa / Chelsea Estate In Ajah Lagos: John Mikel Obi Is Building It...

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 18
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.