Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis - Properties - Nairaland
Nairaland Forum › Nairaland General › Properties › Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis (42362 Views)
1 2 3 4 5 6 7 8 9 10 ... 15 Reply (Go Down)
| Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:51am On Aug 13, 2015 |
Dear all @ Nairaland, we are grateful unto God for another opportunity to build another edifice together for a fellow NLder. Kindly find the details below: Structure Description | Three storey building (3 suspended floor and ground floor) of seven 3 bedroom flats and service rooms on the Ground Floor (see plans for details) Client | Confidential Project Location | Off Leki/EPE Express Way Ajah Design/ Project Architect | PR 'n' M Consult Structural design | Adebol consult Contractor | Behemoth Engineering Ltd (Sister company of Abidoy ventures Ltd aka Aventures) Contractors contact | website: www.behemothengineeringltd.com.ng email: abidoyventures@gmail.com , # 08023142108 Project Phase : Carcass to roofing level Project Phase budget: Tight budget (LOL) Project standard : Julius Berger standard (LOL) |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 11:06am On Aug 13, 2015 |
The floor [lan and site plan pics
|
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 11:08am On Aug 13, 2015 |
Project in progress Day 1: 12 August 2015 | Official site handing over Day 2: Pegging in progress |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by twinskenny(m): 11:37am On Aug 13, 2015 |
lol @julius berger standard. congrat boss. i wish you good success |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by twinskenny(m): 11:38am On Aug 13, 2015 |
lol @julius berger standard. congrat boss. i wish you good success #now following |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brag3: 11:38am On Aug 13, 2015 |
Aventures:Nice one Guys. Make God be with you all the way. look forward to following the progress of this work. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by twinskenny(m): 11:40am On Aug 13, 2015 |
brag3:Sir..i am still waiting for your invitation ooo at the latter stage ![]() need for dstv wiring and distribution.. cctv... intercom?? dont forget us. thanks ![]() |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by olaafirst: 12:06pm On Aug 13, 2015 |
Well don sir just want to inform you I'm compitent for the electrical work |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by smiley001(m): 12:55pm On Aug 13, 2015 |
Aventures:let me spread my mat. Engineer Niyi, dis is Tunji Adeniji ooo, if u wouldn't mind sir we can be part of dis ur project by supplying ur Granite as usual sir oooo. 07081961127. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by segcymoor(m): 2:03pm On Aug 13, 2015 |
Julius berger standard? That means you are considering using stone dust and quality reinforcement. ......I trust you for standard! Following. ...... |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by kopell: 2:32pm On Aug 13, 2015 |
@Aventures welcome Ooooo, in front seat of the class with book and pen. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by mufutau55(m): 2:46pm On Aug 13, 2015 |
Glory... to the Almighty. Hajji M. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by PeoplesArmy: 9:24pm On Aug 13, 2015 |
@Aventure, more grease to your elbows. What is the size of the land for this project? Where is the 7th flat....the 3 floors will contain 6 flats in all and there are serviced rooms on the ground floor. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:02pm On Aug 13, 2015 |
PeoplesArmy:the plot site is 60 x 120 The 3D model uploading........ |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by mufutau55(m): 11:34pm On Aug 13, 2015 |
Aventures:You were reading my mind... The Floor plan is excellent sir. Hajji M. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Meritgoal(m): 7:07am On Aug 14, 2015 |
Positioning my seat at the front with a bucket of popcorn, Aventures ride on always enjoying your style of construction. Zero tolerance for saltysand and all that. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brag3: 9:15am On Aug 14, 2015 |
smiley001:@smiley001 I will need some granite. Where are you based? My project is in lagos near LASU. I will store your number for contact soon. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:36am On Aug 14, 2015 |
Aventures:correction pls. The site is a plot and half but the building itself sits within a plot, and tge recreation area extends to the other half. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:38am On Aug 14, 2015 |
3D loaded
|
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by emmadejust(m): 10:44am On Aug 14, 2015 |
congrat mann ![]() divine guidance and direction to you until completed ...... OUR FAITH, OUR REALITY IN LIFE..... |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by smiley001(m): 11:36am On Aug 14, 2015 |
brag3:ok sir. I'm based in lagos but I work and av worked in all south west states. I would be glad to work wit u sir. contact me anytime u r ready. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by segcymoor(m): 12:02pm On Aug 14, 2015 |
Nice one! We are actually interested in the contrast sum . However tight. Do you mind sharing it ![]() |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brag3: 12:20pm On Aug 14, 2015 |
segcymoor:Sege, you like info ooo but it will be nice to have this info as well.hope it can be shared |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by spyder880(m): 12:24pm On Aug 14, 2015 |
@ Aventures, post the 3d rendition on the first post at the top of the page, beautiful house. Congratulations my man. Lol at tight budget ![]() |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brag3: 12:31pm On Aug 14, 2015 |
spyder880:@spyder880, Heard some good things about you. Hope we can do some work together in the future. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Fhemmmy: 12:42pm On Aug 14, 2015 |
Awesome, congratulations.... following the thread bumper to bumper BUT please let the pictures flow Oh |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by mufutau55(m): 2:24pm On Aug 14, 2015 |
Aventures:Killer design. Exactly what I was expecting. God help the Client and Aventures to complete the project in good health. Hajji M. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by brag3: 2:30pm On Aug 14, 2015 |
mufutau55:Amen |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by NL1960: 2:41pm On Aug 14, 2015 |
PeoplesArmy:@Aventures, congrats but you are yet to respond to the above. The 3D does not seems to show the 7th flat. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by mufutau55(m): 3:14pm On Aug 14, 2015 |
NL1960:May be one Flat is on the ground floor... just thinking aloud. Correction: The Ground Floor Plan does not show anything like that... Sorry! Hajji M. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Nobody: 3:15pm On Aug 14, 2015 |
I like seeing this 3D drawings, I just hope that the end result mimics this as most don't. |
| Re: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by mufutau55(m): 3:22pm On Aug 14, 2015 |
EgunMogaji:When it comes to Aventures... "What You See is What You Get". Do a search on some of his old threads and projects. Hajji M. |
Construction Of 6self-contain Hostel Frm Start To Finish With Cost Saving Advice • Construction Of My 3bedroom Flat All Ensuite • 2 • 3 • 4
How To Buy A Lagos State Government Residential Housing Scheme. Dos And Donts • Can ₦50 Million Build A Modern 3-Bedroom Bungalow With This Current Inflation? • 670sqm Land for sale at Osapa London....7mins WALK to Shoprite

but it will be nice to have this info as well.