Egina FPSO Sails To Offshore Field - Travel (4) - Nairaland
Nairaland Forum › Nairaland General › Travel › Egina FPSO Sails To Offshore Field (21013 Views)
| Re: Egina FPSO Sails To Offshore Field by kenex4ever(m): 10:59am On Aug 27, 2018 |
Butterflyleo:then it's PDP project because it the project started years ago and the date has been fixed before buhari came in |
| Re: Egina FPSO Sails To Offshore Field by toolovely(m): 11:09am On Aug 27, 2018 |
Butterflyleo:wetin concern buhari with the project? |
| Re: Egina FPSO Sails To Offshore Field by Nobody: 11:09am On Aug 27, 2018 |
iammo:Don't mind the stupid idiots. A roject by Total E&P is now Buhari's achievements. Stupidity and some Nigerians.... |
| Re: Egina FPSO Sails To Offshore Field by GiantParrot(m): 11:17am On Aug 27, 2018 |
Butterflyleo:Engineer here. Anyone who is familiar with oil and gas projects knows that the construction phase can take at least 2 years, not to mention the time spent on the prior FEED and detailed design phases, and the many value assurance reviews that would have taken place before a final investment decision (FID) was made. Your reduction of the entire lifespan of this project to two years only advertises how ignorant you are of the subject. The FID for Egina was taken in 2013, that should be about the same time Buhari was distracting the government of the day with complaints about how the clampdown against book haram was anti-north. I have no love whatsoever for the wasteful PDP regime. But the arrogance you have displayed in your responses while revealing the depth of your ignorance of the subject is too difficult to ignore. |
| Re: Egina FPSO Sails To Offshore Field by toolovely(m): 11:17am On Aug 27, 2018 |
Butterflyleo:oga stop disgracing yourself here na? if you dont know anything, just keep quiet? so its in Buhari's regime that the construction of the egina floating construction storage was awarded, started? |
| Re: Egina FPSO Sails To Offshore Field by docadams: 11:18am On Aug 27, 2018 |
SarkinYarki:See above |
| Re: Egina FPSO Sails To Offshore Field by toprealman: 11:20am On Aug 27, 2018 |
Nigerians are FOOLS! Are we not supposed to have many more of this facility? Why celebrate under performance? |
| Re: Egina FPSO Sails To Offshore Field by Dalam0n: 11:31am On Aug 27, 2018 |
Butterflyliar has ran to the politics section to ply his lie lie trade. A contact that was awarded in 2013 is what this lie lie man is tring to tell.people that it was awarded in 2016. He did not even read what he was posting. If he did he would ha e seen that the 2016 date was for an additional part. Shameless liar. |
| Re: Egina FPSO Sails To Offshore Field by xest(m): 11:39am On Aug 27, 2018 |
iammo:pls tell the fools that are claiming is pmb achievement |
| Re: Egina FPSO Sails To Offshore Field by xest(m): 11:40am On Aug 27, 2018 |
Kyase:go and grow Brain. Egina project started sin.ce 2003 |
| Re: Egina FPSO Sails To Offshore Field by xest(m): 11:41am On Aug 27, 2018 |
Butterflyleo:probably u did copy and paste. Did the project start 2015? Insane asshole |
| Re: Egina FPSO Sails To Offshore Field by TEODIN: 11:43am On Aug 27, 2018 |
fashrola:lol, I worked in some part of that Egina project from 2014 to 2016....no need to answer him...let him wallow in his folly |
| Re: Egina FPSO Sails To Offshore Field by icon02(m): 11:51am On Aug 27, 2018 |
54 Nigerians were sent to south Korea for training on this project and a friend of mine was among. They came back Jan 2017 and all 54 of them are onboard Egina. They will be saddled with the responsibility of servicing and maintaining her. |
| Re: Egina FPSO Sails To Offshore Field by TEODIN: 11:52am On Aug 27, 2018 |
Fashdeejay:I don't know which of our past leaders was in charge of that local content policy...but whoever it was either Obasanjo, Yaradua or Jonathan the person played a massive role to the actualization of this |
| Re: Egina FPSO Sails To Offshore Field by chiddyj: 11:55am On Aug 27, 2018 |
Guiderlaurel:My bro...u don touch d egina mega money....about to b mobilised myself.... politicians celebrating success which they had lil or no input since 1960 |
| Re: Egina FPSO Sails To Offshore Field by TEODIN: 12:09pm On Aug 27, 2018 |
GiantParrot:Don't answer them abeg someone who has no engineering knowledge or any knowledge of the oil and gas sector will just come and start vomiting rubbish and calling them fact on the Internet... how can you finish the design and construction of an FPSO in 2 years...even constuction of some parts of the vessels that were Awarded and started construction in early 2014. So it's Buhari that was responsible then..Don't answer them.. |
| Re: Egina FPSO Sails To Offshore Field by idesylvester(m): 12:18pm On Aug 27, 2018 |
where have you been? please google to know more... i work close to that site and for over four years such construction has been going on... Fact, no sentiment based on politics as all of them are the same Butterflyleo: |
| Re: Egina FPSO Sails To Offshore Field by gare(f): 12:18pm On Aug 27, 2018 |
SarkinYarki:please tell them , why dont PMB start his own or initiate his own project |
| Re: Egina FPSO Sails To Offshore Field by MrSkot(m): 12:50pm On Aug 27, 2018 |
Butterflyleo:Grosss Eewwww........ |
| Re: Egina FPSO Sails To Offshore Field by bluecircle470: 12:51pm On Aug 27, 2018 |
SarkinYarki:It is not even associated with the government rather it is own privately. You people should just stop saying what you don’t know. Stop the deception |
| Re: Egina FPSO Sails To Offshore Field by MrRitchie: 1:03pm On Aug 27, 2018 |
iammo:just shut the fvck up already, irritating human being |
| Re: Egina FPSO Sails To Offshore Field by MrSkot(m): 1:03pm On Aug 27, 2018 |
DeBrain045:Two categories of people I am sure cannot support buhari for 2019 1. People who depend on merit for their achievements. 2. People who do something legitimate unassociated with the government for a living. Please do you fall into any of these ![]() |
| Re: Egina FPSO Sails To Offshore Field by iammo(m): 1:10pm On Aug 27, 2018 |
MrRitchie:shows how you were trained and who trained you. shame!! |
| Re: Egina FPSO Sails To Offshore Field by jnoz23(m): 1:11pm On Aug 27, 2018 |
Frustration no go kill buhari fans |
| Re: Egina FPSO Sails To Offshore Field by mrsif: 1:12pm On Aug 27, 2018 |
why is it that this apc government thrive so much on lies my brother has been working on this fpso SINCE the the construction began 2011 it was Jonathan that started this project, not apc. even since apc came on board they have never don any thing to support the project they just look for the glory that does not belong to them. with this, I can confirm that APC IS A FRAUD. this one is not them say this am so so shock. |
| Re: Egina FPSO Sails To Offshore Field by masseratti: 1:41pm On Aug 27, 2018 |
Buhari that can not build second Niger bridge under three years BMC crew are giving him credit for building this FPSO under 2 years are you guys in dream land? Is it because of lack of projects that you guys are going so low? |
| Re: Egina FPSO Sails To Offshore Field by Nobody: 1:51pm On Aug 27, 2018 |
deomelo:Bros to be honest, whoever that is in charge of this BMC stuff needs to sack some of you guys on this forum cos you guys are really doing a bad job for the President. Atleast you should have done a detailed research first on the Egina fpso before coming here to expose your ignorance, making useless analogies on something you know nothing about. Whoever takes the glory for Egina Project is non of my business but fyi, this project started before 2015, I worked with NigerDock and saipem on this same project so tell me something else. |
| Re: Egina FPSO Sails To Offshore Field by Alcheringa(m): 1:52pm On Aug 27, 2018 |
Pls.,when will production commence on FPSO Egina? Heard the vessel has already sailed to the location/field. |
| Re: Egina FPSO Sails To Offshore Field by VictorEkwere: 3:08pm On Aug 27, 2018 |
Butterflyleo:Are u not ashamed of ur self by now. This project was initiated since 2003 to start operation in 2018.Is people like u that are sinking this country with fake news dont let me catch u here again oo. |
| Re: Egina FPSO Sails To Offshore Field by emecheboy2(m): 3:38pm On Aug 27, 2018 |
Butterflyleo: |
| Re: Egina FPSO Sails To Offshore Field by shotuns: 3:44pm On Aug 27, 2018 |
I've been trying to figure out the exact word to use to describe our people on nairaland untill I read your input, God bless you. Guiderlaurel: |
With Flights Banned, Son Sails Solo Across Atlantic To Reach Father, 90 • The Battle-Field Called “Lagos Traffic” • World's Largest Plane With A Wingspan Longer Than A FOOTBALL FIELD(Pic) • 2 • 3 • 4
COVID-19: FAAN To Deploy Robots In Airports • Nigeria Fines Uk-based Flairjet For Violating Aviation Regulations • Airfares Skyrocket Ahead Christmas, New Year
how is this a PMB achievement? you are demarketing your paymaster with this kind of post, because a simple google search would burst your bubble and actually start making people focus on the initiator of the project. I hope BMC don't end up denting buhari's campaign by mistakenly bringing out more of PDP's achievements. Now you guys look ridiculous accusing PDP 16years as a waste, and you are only bringing out PDP projects that the completion date was already fixed for now

the the construction began 2011 it was Jonathan that started this project, not apc. even since apc came on board they have never don any thing to support the project they just look for the glory that does not belong to them. with this, I can confirm that APC IS A FRAUD. this one is not them say this am so so shock.