Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,150,874 members, 7,810,330 topics. Date: Saturday, 27 April 2024 at 07:11 AM

Egina FPSO Sails To Offshore Field - Travel - Nairaland

Nairaland Forum / Nairaland / General / Travel / Egina FPSO Sails To Offshore Field (19812 Views)

With Flights Banned, Son Sails Solo Across Atlantic To Reach Father, 90 / The Battle-Field Called “Lagos Traffic” / World's Largest Plane With A Wingspan Longer Than A FOOTBALL FIELD(Pic) (2) (3) (4)

(1) (2) (3) (4) (5) (Reply) (Go Down)

Egina FPSO Sails To Offshore Field by Butterflyleo: 11:05pm On Aug 26, 2018
The $3.3 billion Floating Production Storage Offloading (FPSO) unit built by Samsung Heavy Industries of Korea (SHI) for the 200,000 barrels per day capacity Egina oilfield began to sail to the oilfield Sunday.

The FPSO departed LADOL Free Zone in Lagos to the offshore field, according to THISDAY newspaper.
Following fabrication and integration works in Lagos, reports said the FPSO will arrive at the Egina oilfield located in Oil Mining Lease (OML) 130 in three days time.

In 2017, the FPSO sailed away from the quayside at Samsung Yard in Geoje, South Korea, before arriving at the Samsung Yard (SHI-MCI FZE quayside) in LADOL free zone in Lagos in January 2018. It was thereafter integrated locally by Samsung Heavy Industries Nigeria (SHIN) Limited.
Reputed as the first of its kind in Africa, the FPSO is headed to the oil field, which is being developed at the cost of $16 billion by the French oil major, Total.

The Oil Mining Lease (OML) 130, experts say, is located approximately 150 kilometres offshore Port Harcourt.
About 200,000b/d of oil is expected to be produced from the field which, reports said, would account for 10 per cent of Nigeria’s total oil production when finally in operation
.


https://www.premiumtimesng.com/business/business-news/281388-finally-egina-fpso-sails-to-offshore-field.html

YET, ANOTHER LAUDABLE ACHIEVEMENT

Finally, Egina FPSO sails to offshore field:

The $3.3 billion Floating Production Storage Offloading (FPSO) unit built by Samsung Heavy Industries of Korea (SHI) for the 200,000 barrels per day capacity Egina oilfield began to sail to the oilfield.

Please, do note that, Egina FPSO is the only one of its kind in Africa and one of the world's largest.

God Bless All Buharists.

God Bless President Mohammadu Buhari.
God Bless The Federal Republic of Nigeria.

Buhari Is The Best Thing That Has Happened To Nigeria And Nigerians After Independence.

PMB till 2023 CARRY GOOOO!!!! kiss kiss PMB keeps making us proud.

23 Likes 3 Shares

Re: Egina FPSO Sails To Offshore Field by Kyase(m): 11:11pm On Aug 26, 2018
Sai baba

10 Likes 1 Share

Re: Egina FPSO Sails To Offshore Field by iammo(m): 11:16pm On Aug 26, 2018
lipsrsealed how is this a PMB achievement? you are demarketing your paymaster with this kind of post, because a simple google search would burst your bubble and actually start making people focus on the initiator of the project. I hope BMC don't end up denting buhari's campaign by mistakenly bringing out more of PDP's achievements. Now you guys look ridiculous accusing PDP 16years as a waste, and you are only bringing out PDP projects that the completion date was already fixed for now

https://www.total.com/en/energy-expertise/projects/oil-gas/deep-offshore/egina-nigeria

123 Likes 7 Shares

Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 11:18pm On Aug 26, 2018
Lol
..Egina FPSO has nothing to do with Buhari

103 Likes 2 Shares

Re: Egina FPSO Sails To Offshore Field by amaniro: 11:18pm On Aug 26, 2018
PDP supporters right now

21 Likes 6 Shares

Re: Egina FPSO Sails To Offshore Field by Ndonu101: 11:22pm On Aug 26, 2018
meanwhile in another news truck load of citizens are being buried in Benue

their only crime is that they are farmers!

46 Likes 5 Shares

Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:24pm On Aug 26, 2018
iammo:
lipsrsealed how is this a PMB achievement? you are demarketing your paymaster with this kind of post, because a simple google search would burst your bubble and actually start making people focus on the initiator of the project. I hope BMC don't end up denting buhari's campaign by mistakenly bringing out more of PDP's achievements. Now you guys look ridiculous accusing PDP 16years as a waste, and you are only bringing out PDP projects that the completion date was already fixed for now

Where and when did PDP initiate this? Abi is your head paining you?

6 Likes 2 Shares

Re: Egina FPSO Sails To Offshore Field by Sharpshooota: 11:26pm On Aug 26, 2018
Expect news like this daily as elections draws near....

Propaganda government at work

They have nothing to offer... They all forged certificates to deceive the gullible zombies

63 Likes 5 Shares

Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 11:27pm On Aug 26, 2018
Egina FPSO was ordered during the govt of Good luck Jonathan when Buhari was still wearing adult diapers and sipping kunu in Daura . Does Buhari even know the meaning of FPSO.

69 Likes 1 Share

Re: Egina FPSO Sails To Offshore Field by DeBrain045(m): 11:28pm On Aug 26, 2018
I keep saying it buhari is a rain no umbrella can shield from 2019
Buhari will surely win

6 Likes 2 Shares

Re: Egina FPSO Sails To Offshore Field by DeBrain045(m): 11:30pm On Aug 26, 2018
Wailers come and wail you where meant to do it.
If the broom of change sweep corruptions no umbrella can cover it

2 Likes 1 Share

Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:30pm On Aug 26, 2018
SarkinYarki:
Egina FPSO is owned by TOTAL and it's 100 percent their own initiative and it was built even before Buhari bought his form to contest ... Does Buhari even know the meaning of FPSO

Wrong!

This is a partnership with NNPC, CNOOC, Petrobras, Sapetro and Total (24%)

Wailers and lies

6 Likes 2 Shares

Re: Egina FPSO Sails To Offshore Field by iammo(m): 11:31pm On Aug 26, 2018
Butterflyleo:


Where and when did PDP initiate this? Abi is your head paining you?

Ode!, its a JV between total and NNPC, discovered and started way back 2003, here is the link on total website ;

https://www.total.com/en/energy-expertise/projects/oil-gas/deep-offshore/egina-nigeria

how can you claim to be promoting Mr integrity, with cheap lies HOW?!!!

49 Likes 2 Shares

Re: Egina FPSO Sails To Offshore Field by Dannyset(m): 11:31pm On Aug 26, 2018
Some people be making mockery of themselves by saying this is PDP initiative. How that sound to their hearing baffles me.

8 Likes 1 Share

Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:34pm On Aug 26, 2018
iammo:


Ode!, its a JV between total and NNPC, discovered and started way back 2003, here is the link on total website ;

https://www.total.com/en/energy-expertise/projects/oil-gas/deep-offshore/egina-nigeria

how can you claim to be promoting Mr integrity, with cheap lies

The oil field was discovered in 2003 called egina but not the construction of the egina floating construction storage.

Get your facts right.

This thread is not about the oil field. Ode!

Besides another wailer like you is claiming it is 100% owned by total while you just confirmed my position that NNPC is a partner.

So is your fellow wailer lying grin

12 Likes 4 Shares

Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 11:35pm On Aug 26, 2018
Butterflyleo:


Wrong!

This is a partnership with NNPC, CNOOC, Petrobras, Sapetro and Total (24%)

Wailers and lies

Buhari has nothing to do with Egina.

25 Likes 1 Share

Re: Egina FPSO Sails To Offshore Field by iammo(m): 11:36pm On Aug 26, 2018
Butterflyleo:


The oil field was discovered in 2003 called egina but not the construction of the egina floating construction storage.

Get your facts right.

This thread is not about the oil field. Ode!
Is your eyes paining you? Let me post the link for you again now make sure you read it slowly, before further embarrassing your paymaster by scoring own goal

https://www.total.com/en/energy-expertise/projects/oil-gas/deep-offshore/egina-nigeria

25 Likes 2 Shares

Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:39pm On Aug 26, 2018
iammo:

Is your eyes paining you? Let me post the link for you again now make sure you read it slowly, before further embarrassing you paymaster by scoring own goal

https://www.total.com/en/energy-expertise/projects/oil-gas/deep-offshore/egina-nigeria

The link is open right here. You wish this was so PDP but alas you fail. Drilling of the oil field began In 2014 and drilling continued through 2015 and your buffoon was removed in 2015 even before they could ascertain the volume of oil reserves available in the newly discovered oil field.

It was after they were able to determine this that they know were able to decide on the capacity this floating storage would have.

PDP SHAME!!!

10 Likes 3 Shares

Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:41pm On Aug 26, 2018
SarkinYarki:


Buhari has nothing to do with Egina.

Who is the minister for petroleum again? Who is in charge of NNPC which is a partner?

Your mumu never do?
Your wailing never do?
Your lies never do?

5 Likes 2 Shares

Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 11:45pm On Aug 26, 2018
Butterflyleo:


Who is the minister for petroleum again? Who is in charge of NNPC which is a partner?

Your mumu never do?
Your wailing never do?
Your lies never do?

EGINA FPSO has been in the works for almost a decade and it's 2018 field integration docking has been on schedule for 7 years .. ( ask any one who works in Total upstream)...

30 Likes

Re: Egina FPSO Sails To Offshore Field by deomelo: 11:47pm On Aug 26, 2018
#SAIBABA2019

1 Like

Re: Egina FPSO Sails To Offshore Field by Sirjamo: 11:49pm On Aug 26, 2018
SarkinYarki:
Lol
..Egina FPSO has nothing to do with Buhari
But Boko haram and killer herdsmen have everything to do with Buhari abi ?

When it is a good thing, it is some one else
when it's bad, it's Buhari, you all are useless hypocrites

11 Likes 1 Share

Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:50pm On Aug 26, 2018
SarkinYarki:


EGINA FPSO has been in the works for almost a decade and it's 2018 field integration docking has been on schedule for 7 years .. ( ask any one who works in Total upstream)...

Shut your trap.

Nexans was subcontracted by Samsung Heavy Industries (SHI) to deliver cables for the Egina FPSO project. MTE was contracted by SHI to deliver design, engineering, fabrication services and additional heat shields for the Egina FPSO, in February 2016.

From the OP


The $3.3 billion Floating Production Storage Offloading (FPSO) unit built by Samsung Heavy Industries of Korea (SHI)

2 Likes

Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 11:52pm On Aug 26, 2018
Butterflyleo:


The oil field was discovered in 2003 called egina but not the construction of the egina floating construction storage.

Get your facts right.

This thread is not about the oil field. Ode!

Besides another wailer like you is claiming it is 100% owned by total while you just confirmed my position that NNPC is a partner.

So is your fellow wailer lying grin

Samsung Heavy Industries was awarded the contract to build Egina FPSO in 2013 under the Jonathan govt ...so again Buhari has no hand in this

19 Likes

Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:52pm On Aug 26, 2018
SarkinYarki:


Samsung Heavy Industries was awarded the contract to build Egina FPSO in 2013 under the Jonathan govt ...so again Buhari has no hand in this

Shut up and look above your post

4 Likes 2 Shares

Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 11:53pm On Aug 26, 2018
Butterflyleo:


Shut your trap.



From the OP




You clearly know nothing about how long designing an FPSO takes ..

18 Likes

Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 11:54pm On Aug 26, 2018
SarkinYarki:



You clearly know nothing about how long designing an FPSO takes ..

Again I say shut your mouth you liar.

The contract was given to SHI in 2016. and not your 2013 under your imaginary GEJ you liar

3 Likes 2 Shares

Re: Egina FPSO Sails To Offshore Field by iammo(m): 11:58pm On Aug 26, 2018
Butterflyleo:


The link is open right here. You wish this was so PDP but alas you fail. Drilling of the oil field began In 2014 and drilling continued through 2015 and your buffoon was removed in 2015 even before they could ascertain the volume of oil reserves available in the newly discovered oil field.

It was after they were able to determine this that they know were able to decide on the capacity this floating storage would have.

PDP SHAME!!!

So in your very small mind, discovery was made 2003, OML was given prior to 2014, and drilling started December 2014 with spcific production date of 2018, and you believe buhari who doesn't even know a thing on the terms reached on the joint venture agreement miraculous is responsible for the building and purchase of a FSPO that had been contracted years prior to now?

13 Likes 1 Share

Re: Egina FPSO Sails To Offshore Field by spartan117(m): 11:59pm On Aug 26, 2018
BMC thread grin

23 Likes 3 Shares

Re: Egina FPSO Sails To Offshore Field by SarkinYarki: 12:00am On Aug 27, 2018
Butterflyleo:


Again I say shut your mouth you liar.

The contract was given to SHI in 2016. and not your 2013 under your imaginary GEJ you liar

The contract was awarded in 2013 ..there is nothing to dispute there

7 Likes

Re: Egina FPSO Sails To Offshore Field by Butterflyleo: 12:01am On Aug 27, 2018
iammo:


So in your very small mind, discovery was made 2003, OML was given prior to 2014, and drilling started December 2014 with spcific production date of 2018, and you believe buhari who doesn't even know a thing on the terms reached on the joint venture agreement miraculous is responsible for the building and purchase of a FSPO that had been contracted years prior to now?

I will keep exposing your lies.


Samsung Heavy Industries (SHI) received a turnkey contract from Total for the Egina FPSO. The scope of the contract includes design, procurement, construction, delivery and trial operations.
Nexans was subcontracted by Samsung Heavy Industries (SHI) to deliver cables for the Egina FPSO project. MTE was contracted by SHI to deliver design, engineering, fabrication services and additional heat shields for the Egina FPSO, in February 2016.

3 Likes

Re: Egina FPSO Sails To Offshore Field by MakeNigeriaGrea: 12:01am On Aug 27, 2018
Butterflyleo:

Where and when did PDP initiate this? Abi is your head paining you?
Your head is really paining you. Nigerians are wiser now. #PVCAgainstPMB.

15 Likes 1 Share

(1) (2) (3) (4) (5) (Reply)

Yaba BRT Terminal: Another Abandoned Project? - Photos / BRT Collides With Commercial Bus On Kara Bridge, Ogun State (photos) / Commercial Bus Plunges Into Ogun River, 10 People feared Dead

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 42
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.