Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 5:52pm On Oct 19, 2018
More update shortly...
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:00am On Oct 20, 2018
Mixing begins to blind pad bases and cast the bases.

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:01am On Oct 20, 2018
Blinding of the pad bases

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:11am On Oct 20, 2018
Extremely straight

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:18am On Oct 20, 2018
Circular column for the boy's quater.

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:19am On Oct 20, 2018
The third largest pad base mat

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:21am On Oct 20, 2018
Our iron blenders did a marvelous job and completely their work under two days for this stage.
It's extremely nice and perfect.

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op):
Checking out the accuracy

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:07am On Oct 21, 2018
Blinding on going.
Nothing less than the BEST QUALITY WORKS.
Almost done.

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by isahkadir1(m): 9:12am On Oct 21, 2018
I love this, following
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 10:07pm On Oct 21, 2018
isahkadir1:
I love this, following
Appreciated!
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Peter4luv: 12:06am On Oct 22, 2018
How much is the cost of doing this borehole..
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 4:56am On Oct 22, 2018
Peter4luv:
How much is the cost of doing this borehole..
The negotiation is between the client family and the borehole man,but at it stands per distance and the hard soil hitting a rock underground I was informed 650k.
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op):
Block work in substructure

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:24am On Oct 23, 2018
More update shortly
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 9:24pm On Oct 23, 2018
..
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bless2tom(m): 10:51pm On Oct 23, 2018
Nice work. following and learning from this.
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 1:48am On Oct 24, 2018
Taken our German level from the back.

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 1:52am On Oct 24, 2018
Nothing like an extremely straight wall.
"The taste is in the difference,the difference is in the taste"
All could see the difference.
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 1:53am On Oct 24, 2018
Straight planks for straight and smooth casting

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Amastermovic(m): 6:40am On Oct 24, 2018
following ..
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:27pm On Oct 24, 2018
...

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:29pm On Oct 24, 2018
Another 30tonnes of granite

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 6:43pm On Oct 24, 2018
....

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 2:35pm On Oct 25, 2018
We have our columns casted now
Next to filling, ramming, spreading of DPM and German... thanks for following

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 3:35pm On Oct 25, 2018
PPR pipes for wastes.

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by jp130(m): 6:49pm On Oct 25, 2018
May God giv u d strength to complete dis
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 8:43pm On Oct 25, 2018
jp130:
May God giv u d strength to complete dis
Amen
Thanks
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 8:48pm On Oct 25, 2018
Laterite for filling when we don't have sharp sand in abeokuta and ordering most of our materials from Lagos but sharp sand from Lagos too is expensive and there are still some that has salt which is dangerous for rods so we wanna manage our laterite jejeli* for compact it well.
We will use a rammer as well.
Tomorrow next for filling
Thanks for following.
Over 150cement bags used for foundation.

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Amastermovic(m): 10:14pm On Oct 25, 2018
Timtol:
Laterite for filling when we don't have sharp sand in abeokuta and ordering most of our materials from Lagos but sharp sand from Lagos too is expensive and there are still some that has salt which is dangerous for rods so we wanna manage our laterite jejeli* for compact it well.
We will use a rammer as well.
Tomorrow next for filling
Thanks for following.
Over 150cement bags used for foundation.
I don't want to believe you are saying no sharp sand in Abk ..ccecc and other companies move nothing less 1000 tonnes daily from oba axis..

you will get quality maybe you need to change ur supplies.. Thanks and still following.. and you forgot to tell us the bearing capacity of the soil and depth of pads... and what's the maximum beam span
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op):
Amastermovic:
I don't want to believe you are saying no sharp sand in Abk ..ccecc and other companies move nothing less 1000 tonnes daily from oba axis..

you will get quality maybe you need to change ur supplies.. Thanks and still following.. and you forgot to tell us the bearing capacity of the soil and depth of pads... and what's the maximum beam span
We tried to get it oo but as it stands was told "e no dey" (the ones for filling but there's sharp sand) and I know if we later get it as planned it will be very expensive.
We have a good soil here.
No soil test was done only a survey of the soil was done for the borehole which we use as well but as it stands,we arrived at about 15 types of soil before we get our water in which we have a rock and the borehole depth is over 100m.
There are even storey buildings around that only column was done @the edges and that's all because of good soil.
We don't have problem about soil sir.
The depth of the foundation is 750mm and the pad bases for the mat and columns is 300mm so for the pad bases we have 1,050mm and for blocks in substructure we have 750mm.
If I could understand you clearly now.
Thanks for mentioning ccecc... will try to ask about that.
We only have a cartilever of 1.575m which TMT rods of Y20 will take that.
The sitout in front in such of a curved form.
All our rods are TMT anyways.
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(op): 7:45pm On Oct 26, 2018
Ongoing filling Getting done gradually in respect to the ongoing terrace columns growing out to the height of 7650mm from the pad bases.
Foundation done for 2weeks.
Over 3m used.

1 2 3 4 5 6 7 8 9 10 ... 12 Reply

Cost, Estimate For Building A 4bedroom Bungalow In Nigeria (detailed Info)Construction Thread For A 4bedroom DuplexConstruction Of A 4bd/rm Duplex With A Bq @Abeokuta by Dioritestructures234

Documents Required For Property Transfer In NigeriaBuilding A Block Of Four 3-bedroom Flats -my Journey.Tenant Sets House On Fire ! (video)