Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,043 members, 7,818,098 topics. Date: Sunday, 05 May 2024 at 07:45 AM

Construction Of A 4bedroom Duplex With A Bq@ Abeokuta - Properties (5) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Construction Of A 4bedroom Duplex With A Bq@ Abeokuta (20388 Views)

Construction Of A 4bd/rm Duplex With A Bq @Abeokuta by Dioritestructures / CONSTRUCTION & DESIGN OF 4bedroom Duplex With 2bedroom 2flat Attach IN LAGOS / Construction Of 4bedroom Duplex With 2bedroom 2flat Attach At AIT Road Alagbado (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply) (Go Down)

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bixton(m): 8:11pm On Oct 31, 2018
Timtol:
Still @site casting...we plan to finish it up today and cure 2am and tomorrow morning before block work commence hopefully.
We spent more than budgeted

Well done.
So how many bags of cement was used for the flooring?

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 10:53pm On Oct 31, 2018
bixton:


Well done.
So how many bags of cement was used for the flooring?
Thanks bro.
When we are done with German I will let you know.
Just for what's on ground without German 170bags. German will take more than 100bags so let's wait and see the outcome.
I'm just getting in from site... Let's see what's up tomorrow... remains little to finish casting tho ought to be done but because of little issue and well settled.
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bless2tom(m): 8:51am On Nov 01, 2018
Nice job so far.. I am a graduate of Building Technology. I will love to learn from you, don't know if you could be of help.

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 9:50am On Nov 01, 2018
bless2tom:
Nice job so far.. I am a graduate of Building Technology. I will love to learn from you, don't know if you could be of help.
Cool!
In what way?
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bless2tom(m): 10:25am On Nov 01, 2018
Timtol:
Cool! I what way?
I will like to gain more site experience sir.

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 12:19pm On Nov 01, 2018
bless2tom:

I will like to gain more site experience sir.
Isn't this post comprehensive enough?
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bless2tom(m): 8:38pm On Nov 01, 2018
Timtol:

Isn't this post comprehensive enough?
it is, just that If I'm privileged to be in Abeokuta before the conclusion of the project, I will like visiting the site.
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 9:40pm On Nov 01, 2018
bless2tom:

it is, just that If I'm privileged to be in Abeokuta before the conclusion of the project, I will like visiting the site.
Toor!
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 9:44pm On Nov 01, 2018
Celebration... drinking and dining as we completed the foundation.
Millions gone.
Without German 170bags of cement used.
Cement used for German floor will be updated soon.
Project leader: Arc Tim (Timtol)
Contractor: Engr Vincent (HAJIVINCE)
Swelling stomach...lol

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Babs612000(m): 5:45am On Nov 02, 2018
Timtol:
The site is getting different gradually as the fence start coming up and the building taken shape. Filling finished but because of the rain that rained heavily in Lagos/abeokuta axis we need to top it up.
Machine was unable to move on the laterite soil which caused a major setback.
please how many trucks do you used for filling and at what price per one.
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 6:21am On Nov 02, 2018
Babs612000:
please how many trucks do you used for filling and at what price per one.
5 Chinnese truck,with the excavated ones before rammer then after rammer a tipper of sharp sand to top before rammer again.
You can deduct your answer from there.
Thanks
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Babs612000(m): 6:29am On Nov 02, 2018
Timtol:

5 Chinnese truck,with the excavated ones before rammer then after rammer a tipper of sharp sand to top before rammer again.
You can deduct your answer from there.
Thanks
wow!!! Many thanks.

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 8:40am On Nov 02, 2018
Babs612000:
wow!!! Many thanks.
Welcome

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 8:42am On Nov 02, 2018
bixton:


Well done.
So how many bags of cement was used for the flooring?
Okay now the figure is out.
170bags for foundation excluding German floor.
161bags for German floor only.
Total: 331bags for foundation.

2 Likes

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bixton(m): 8:51am On Nov 02, 2018
Timtol:

5 Chinnese truck,with the excavated ones before rammer then after rammer a tipper of sharp sand to top before rammer again.
You can deduct your answer from there.
Thanks

When you say 5 Chinese truck, how much tonnage of sand does each truck hold and how many tyres is it?
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 9:21am On Nov 02, 2018
bixton:


When you say 5 Chinese truck, how much tonnage of sand does each truck hold and how many tyres is it?
10tyres

2 Likes

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by bixton(m): 9:38am On Nov 02, 2018
Timtol:

10tyres
Wow, that's nice.
How much is a truck of the filling sand (laterite) over there?
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 12:05pm On Nov 02, 2018
bixton:

Wow, that's nice.
How much is a truck of the filling sand (laterite) over there?
We are very close to the railway station so we got it 8k but any place far from railway goes for 20k.

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Peter4luv: 12:32pm On Nov 02, 2018
How much did you spend so far on the foundation
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 1:42pm On Nov 02, 2018
Peter4luv:
How much did you spend so far on the foundation
3m plus... exact figure soon.
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 10:20pm On Nov 02, 2018
...

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 4:17pm On Nov 04, 2018
we lost one of our workers due to sickness dahs irredeemable.
We gave our all & God knows best
We will be paying our last respect by not working for a week.

2 Likes

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Amastermovic(m): 4:27pm On Nov 04, 2018
RIP Man.. what's the height of the ground floor and depth of beam

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 5:13pm On Nov 04, 2018
Amastermovic:
RIP Man.. what's the height of the ground floor and depth of beam
The client want a high room so Ground floor height is 3300mm FF 3300 PF 3000 second thought on roofing.
Depth of beam 450mm tho we aren't there yet.
300mm for roof beam.
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 8:26pm On Nov 11, 2018
Happy Sunday from every corner.
Happy to start work back middle of this week.

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by MikoB: 8:54pm On Nov 11, 2018
Hello op,what is the size of the land?
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by MikoB: 8:55pm On Nov 11, 2018
[quote author=Timtol post=72677044]we lost one of our workers due to sickness dahs irredeemable.
We gave our all & God knows best
We will be paying our last respect by not working for a week.
Sorry for the loss.

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 9:22pm On Nov 11, 2018
[quote author=MikoB post=72883200][/quote]
Yeah!
Thanks
Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by MikoB: 11:06pm On Nov 11, 2018
So what is the size of the land?

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 7:42am On Nov 12, 2018
MikoB:
So what is the size of the land?
A little bigger than a plot of 120/60 because the plot isn't a perfect rectangle.

1 Like

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 6:50am On Nov 16, 2018
Morning here and Happy weekend.
Work resume on Thursday (Yesterday) but met some issues on ground with robbers trying to steal our pumping machine and more than half rings stolen despite the plans we made to secure the place.
Given community water and regretting a later.
The machine was removed and the pipes broken,wires were cut and many more.
Then: Out of bound to fetching of water on this site.

Re: Construction Of A 4bedroom Duplex With A Bq@ Abeokuta by Timtol(m): 6:58am On Nov 16, 2018
More pictures later today on block work

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) ... (12) (Reply)

Yaba Building Collapse: One Person Recovered Dead From The Rubble / Ikorodu Houses Marked For Demolition By LASG; The Residents React / LASG Arrests Developer Of Yaba Collapsed Building

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 27
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.