Properties › Re: Bringing Contemporary Architecture To Benin City: 5 Bedroom Duplex Construction! by skimanski(op): 11:56am On Aug 25, 2017 |
BlueMountain1: Good job Skimanski. Would you kindly throw more light on the construction details of the incorporated swimming pool in this building project? Thanks. Construction Phase shall be posted on this Thread detail by Detail for every follower. |
Properties › Re: Finishing Our Building In Benin (a New Dimension To Nigerian Architecture) by skimanski(op): 5:10pm On Aug 24, 2017 |
|
Properties › Re: Finishing Our Building In Benin (a New Dimension To Nigerian Architecture) by skimanski(op): 5:08pm On Aug 24, 2017 |
.
|
Properties › Re: Finishing Our Building In Benin (a New Dimension To Nigerian Architecture) by skimanski(op): 5:07pm On Aug 24, 2017 |
POP WORKS: Resumption
|
Properties › Re: Finishing Our Building In Benin (a New Dimension To Nigerian Architecture) by skimanski(op): 4:58pm On Aug 24, 2017 |
EXTERNAL WORKS: Parameter fencing
|
Properties › Re: Finishing Our Building In Benin (a New Dimension To Nigerian Architecture) by skimanski(op): 4:53pm On Aug 24, 2017 |
PLASTERING WORKS: Updates on External Plastering
|
Properties › Re: Bringing Contemporary Architecture To Benin City: 5 Bedroom Duplex Construction! by skimanski(op): 4:22pm On Aug 24, 2017 |
FIRST FLOOR SLAB WORKS: Resumption of Wood Works
|
Properties › Re: Bringing Contemporary Architecture To Benin City: 5 Bedroom Duplex Construction! by skimanski(op): 4:18pm On Aug 24, 2017 |
.
|
Properties › Re: Bringing Contemporary Architecture To Benin City: 5 Bedroom Duplex Construction! by skimanski(op): 4:17pm On Aug 24, 2017 |
GROUND FLOOR MASONRY WORKS: Conclusion of column works and resumption of Brick Work to take Final Block Level. (Final Block Level including proposed Deck beam from DPC is 3.42meters. That is 11.2feet)
|
Properties › Re: Best Architectural, Interior And Construction Works by skimanski(op): 10:57pm On Aug 23, 2017 |
juliusocean: What's the estimated cost of this project Cost estimate varies on a lot of factors. Kindly email on jude@dnstructures.com for estimates. |
Properties › Re: Best Architectural, Interior And Construction Works by skimanski(op): 7:29pm On Aug 23, 2017 |
Proposed 5 Bedroom Duplex Building Area. 216 Sq.m
GROUND FLOOR Guest w/c Main Living Room Dinning Kitchen Store Guest Bedroom Laundry Maids Room
FIRST FLOOR Family Lounge Master's Bedroom Boy's Room Girl's Room madam's Room all rooms ensuite.
PENT FLOOR Study Room Gym
|
Properties › Re: Best Architectural, Interior And Construction Works by skimanski(op): 9:03pm On Aug 21, 2017 |
OPTION 4
|
Properties › Re: Best Architectural, Interior And Construction Works by skimanski(op): 9:02pm On Aug 21, 2017 |
OPTION 3
|
Properties › Re: Best Architectural, Interior And Construction Works by skimanski(op): 9:02pm On Aug 21, 2017 |
OPTION 2
|
Properties › Re: Best Architectural, Interior And Construction Works by skimanski(op): 8:53pm On Aug 21, 2017 |
Proposed 6 Bedroom Duplex Building Area. 276 Sq.m
GROUND FLOOR Guest w/c Main Living Room Dinning Kitchen Store Guest Bedroom Laundry Gym Selfcontained BQ
FIRST FLOOR Family Lounge Master's Bedroom Boy's Room Girl's Room madam's Room all rooms ensuite.
PENT FLOOR Make-up Studio Library Bedroom Ensuite
|
Properties › Re: Our Renovation Diary-lekki Scheme I (a New Dimension To Nigerian Architecture) by skimanski(op): 9:43pm On Aug 20, 2017 |
.
|
Properties › Re: Our Renovation Diary-lekki Scheme I (a New Dimension To Nigerian Architecture) by skimanski(op): 9:40pm On Aug 20, 2017 |
MASTER'S BATHROOM
|
Properties › Re: Our Renovation Diary-lekki Scheme I (a New Dimension To Nigerian Architecture) by skimanski(op): 9:36pm On Aug 20, 2017 |
|
Properties › Re: Our Renovation Diary-lekki Scheme I (a New Dimension To Nigerian Architecture) by skimanski(op): 9:25pm On Aug 20, 2017 |
LOUNGE
|
Properties › Re: Doors, Cabinets, Wardrobe And Other Wood Works by skimanski(op): 9:17pm On Aug 20, 2017 |
D&S CONTEMPORARY DOORS MODEL: S-005
|
Properties › Re: Doors, Cabinets, Wardrobe And Other Wood Works by skimanski(op): 9:14pm On Aug 20, 2017 |
D&S CONTEMPORARY DOORS MODEL: S-009
|
Properties › Re: Our Renovation Diary-lekki Scheme I (a New Dimension To Nigerian Architecture) by skimanski(op): 9:05pm On Aug 20, 2017 |
.
|
Properties › Re: Our Renovation Diary-lekki Scheme I (a New Dimension To Nigerian Architecture) by skimanski(op): 9:04pm On Aug 20, 2017 |
KITCHEN
|
Properties › Re: Our Renovation Diary-lekki Scheme I (a New Dimension To Nigerian Architecture) by skimanski(op): 8:50pm On Aug 20, 2017 |
|
Properties › Re: Our Renovation Diary-lekki Scheme I (a New Dimension To Nigerian Architecture) by skimanski(op): 8:48pm On Aug 20, 2017 |
.
|
Properties › Re: Our Renovation Diary-lekki Scheme I (a New Dimension To Nigerian Architecture) by skimanski(op): 8:47pm On Aug 20, 2017 |
KITCHEN PANTRY
|
Properties › Re: Our Renovation Diary-lekki Scheme I (a New Dimension To Nigerian Architecture) by skimanski(op): 8:15pm On Aug 20, 2017 |
MAIN LOUNGE/DINNING
|
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 7:47pm On Aug 20, 2017 |
wanaj0: Seems this project has stopped? Is it recession Was looking forward to see what the finishing will look like. Tiling has been rounded up. Still trying to agree on other Aspects of the projects |
Properties › Re: Doors, Cabinets, Wardrobe And Other Wood Works by skimanski(op): 9:09am On Aug 19, 2017 |
whalleh: Hello sir,
I will like to have some inputs and advice concerning my situation.
I have just completed the foundation for my twin flats (2bed and 1bedroom) and I'm about to take a decision on the German flooring.
Due to cost constraints I have at the moment, I'm forced to think of other options that will possibly achieve the same end results.
Instead of German flooring, I'm considering a 150mm thick concrete layer on the blocks alone throughout the entire foundation. I'm of the opinion that this option will stop ingress of moisture from the soil to the superstructure, prevent insects and rodents from moving through the soil to the roof, offer some sort of atabilizatin for the building and of course drastically reduce the cost associaTed with filling the entire foundation with concrete.
I'll like that you please look into my idea and advise me based on your experience.
Thanks in advance If you do not Pour the entire floor with concrete now, note you will still have to do that before Tiling. so Its not necessarily dodging the cost but postponing the cost for a later date. Which ever the floor will still have to be poured with concrete. |
Properties › Re: Doors, Cabinets, Wardrobe And Other Wood Works by skimanski(op): 10:52am On Aug 16, 2017 |
[quote author=allhavesinned post=59523900][/quote]jude@dnstructures.com
Meanwhile I should be in Owerri Next week. |
Properties › Re: Contemporary Architecture: The Story Of Our 4 Bedroom Duplex By Skimanski by skimanski(op): 10:33am On Aug 16, 2017 |
MADE OF BLACK !!!
( Car Port by @StainlessH )
|
Properties › Re: Contemporary Architecture: The Story Of Our 4 Bedroom Duplex By Skimanski by skimanski(op): 9:56am On Aug 16, 2017 |
Natudu: Chief, Is it possible for you to set me up for an inspection of this work. I am interested in doing something similar, though commercial. You can reach me egbudu2007@yahoo.com Inspection for this house will be possible from now till end of tomorrow as Internals will be done with and locked out by Thursday evening. I will be glad if you could come in before tomorrow evening for inspection. |