FIRST FLOOR MASONRY WORKS: Updates on Masonry Works
|
Update on filling works
|
WINDOW WORKS (UNIT 1): Master's Bedroom Balcony Glass. With Door in the Middle and Window Openings to the left and the right side.
|
.
|
mufutau55:I always recommend a visit to our Ajah office to see for your self how these doors look like. Im sure you'll say to your self then that they are worth more than the prices. In Terms of Weight, Durability, Aesthetics and the fact that you can adjust designs to suit your style. Anyway, as my Ogas wey carry me reach where i don reach. I can always discount for you anyday anytime. |
POP WORKS (UNIT 2): Updates
|
FURNITURES: updates
|
Resumption of Concrete Stamping Floor
|
GATE & FENCE RAILINGS: Making of our Entrance gate in Pics.
|
diehard:Thanks Sir, We are available anytime. Our charges are based on what is requested and what we deliver. Not over not less. |
PAINTING: Dark Grey Matt Color
|
Kitchen Updates in Pics
|
WASH BASIN: Wood Works
|
GATE: Making Entrance Gate. Hard Wood Gate with Steel Framing.
|
We Design Unique and good designs for very affordable prices. We also build and finish your houses at top quality workmanship. our designs are always unique, so we always advise to handle the project personally. We also do Interior Designs, Shops, Kitchen Rooms e.t.c attached is some of my designs and finishes. Action the say, speaks louder than words architectural designs. Construction, Renovations, and Interiors. (Tiling, Kitchen, furnishings and solving general House problems) Dezyns and Structures. Architect Jude O. Odemwingie. email: jude@dnstructures.com email: skimanski4life@yahoo.com website: www.dnstructures.com Tel; 08038390386 follow us on Instagram: @ dezynstructures Kindly take your time to Follow our numerous professional works on every page of these links below https://www.nairaland.com/3691502/doors-cabinets-wardrobe-other-wood https://www.nairaland.com/1164230/best-architectural-interior-construction-works https://www.nairaland.com/2067260/lekki-gardens-finishings https://www.nairaland.com/1331375/architecture-lagos-nigeria-construction-duplex https://www.nairaland.com/1522743/new-dimension-nigerian-architecture-construction https://www.nairaland.com/2543797/4-bedroom-duplex-new-dimension https://www.nairaland.com/2963940/arcadia-groove-estate-constructing-4 https://www.nairaland.com/2770635/construction-works-units-flats-new https://www.nairaland.com/2985698/construction-flats-owerri-new-dimension https://www.nairaland.com/3079756/renovation-diary-new-dimension-nigerian https://www.nairaland.com/3349788/renovation-diary-platinum-row-new-dimension https://www.nairaland.com/3364355/contemporary-architecture-story-4-bedroom https://www.nairaland.com/3436850/construction-duplex-4-units-flats https://www.nairaland.com/3591888/building-detached-duplexes-lekki-new https://www.nairaland.com/3587326/finishing-beach-house-new-dimension https://www.nairaland.com/3623843/finishing-duplex-flats-lekki-new https://www.nairaland.com/3691502/doors-cabinets-wardrobe-other-wood https://www.nairaland.com/3725903/renovation-diary-lekki-scheme-new-dimension https://www.nairaland.com/3765344/finishing-building-benin-new-dimension https://www.nairaland.com/3821835/bringing-contemporary-architecture-benin-city https://www.nairaland.com/3821229/dairy-ikota-duplex-new-dimension https://www.nairaland.com/3895150/building-semi-detached-duplex-osapa-new |
DOOR: Fabricating our D&S Security Door. Pics Showing Inner panel with 6mm Thick Solid Steel Plate.
|
PLUMBING FITTINGS: Installation of W.c Fit on Wall.
|
WARDROBE: Fitting into Position Master's Warbrobe.
|
PAINTING: Arrival of paints as my Guys plan to resume work
|
GROUND FLOOR MASONRY WORKS: Updates
|
teshiem:Like you know the estate Very well. Every house has very short Fences. |
FIRST FLOOR SLAB WORKS: Conclusion of Slab Concrete Works and Resumption of Brick Works. Heading to 10 Coaches as my Lintel Level against the Conventional 9 Coaches.
|
GROUND FLOOR MASONRY WORKS: Resumption of Brick Works. 225mm Size Bricks Mainly used on Ground floor.
|
POP WORKS (UNIT 2): Resumption.
|
WINDOW WORKS (UNIT 2): Masonry works on Window Installation.
|
WINDOW WORKS (UNIT 2): Nylon Wrapping of Window casings and Installation before Masonry Works
|
Updates
|
I no know how una Look Us Nigerians. All you this Americans. See na Human Beign Remain make We make ooo. Country wey Human being for dey Fly na em una say no fit Make Plane Ok ooo!!! I hear Una. Make i go drink Coke. |
FOUNDATION: So Far. Filling was completed, COmpacting and Damproofing was done as well as Reinforcement before Poured Concrete Cast. Getting ready for Brick Works
|
jabolo: ![]() |
KITCHEN CABINET: Ceiling Design to Allow for 3 Points Drop Lighting on Sitting area of Kitchen Cabinet. Content of Ceiling Area is Plyboard for Framing of Design and 13mm Thich Plaster Board for Covering of FRamed work. Next is Screeding to cover its current messed up Look.
|