Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 9:09pm On Jan 30, 2017 |
Updates also on wiring
|
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 9:07pm On Jan 30, 2017 |
Updates on Window installation
|
Properties › Re: Building Detached Duplexes In Lekki (new Dimension To Nigerian Architecture) by skimanski(op): 9:02pm On Jan 30, 2017 |
Frame works for Raft Foundation Reinforcement
|
Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 8:19am On Jan 28, 2017 |
|
Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by skimanski(op): 8:16am On Jan 28, 2017 |
vickzie: magnificent piece. thumbs up Bro. I would like to know the cost of this edifice from start to finish. email: icelanny993@gmail.com Email sent |
Properties › Re: Building Detached Duplexes In Lekki (new Dimension To Nigerian Architecture) by skimanski(op): 11:09pm On Jan 27, 2017 |
My Very tall Staff. Taking one for the album collection
|
Properties › Re: Building Detached Duplexes In Lekki (new Dimension To Nigerian Architecture) by skimanski(op): 11:05pm On Jan 27, 2017 |
Resumption of Pegging and setting out
|
Properties › Re: Finishing Our Beach House (new Dimension To Nigerian Architecture) by skimanski(op): 11:03pm On Jan 27, 2017 |
Bedroom POP Works ongoing
|
Properties › Re: Best Architectural, Interior And Construction Works by skimanski(op): 9:40pm On Jan 27, 2017 |
sleekdre: Please which product is this AC? I've been looking for ac with piping outlet that is on the left so that it can cover the prepared hole for the outdoor unit. This particular one is still on the right |
Properties › Re: OUR RENOVATION Diary-platinum Row (A New Dimension To Nigerian Architecture) by skimanski(op): 9:39pm On Jan 27, 2017 |
AK007: Excellent job...I should engage you soon. Thanks sir, We'll be waiting. |
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 9:02am On Jan 26, 2017 |
ice4u999: Is this Place in Lekki and is there enough space to mount solar panels on the roof and still have enough space to relax? Yes ! Arcadia Groove Estate. Femi Okunu st. There is enough space on the balcony and roof for Solar panels |
Properties › Re: Building Detached Duplexes In Lekki (new Dimension To Nigerian Architecture) by skimanski(op): 9:00am On Jan 26, 2017 |
amanikondo: A don follow My oga your boy is loyal ooo |
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 10:42pm On Jan 25, 2017 |
ice4u999: Lovely and a beautiful waterside view Yes ooo.Very nice! even better in real life. |
Properties › Re: Building Detached Duplexes In Lekki (new Dimension To Nigerian Architecture) by skimanski(op): 9:56pm On Jan 25, 2017 |
Reinforcing and concrete works on front fence Parameter before we kickoff Foundation setout tomorrow
|
Properties › Re: Lekki Gardens Finishings. by skimanski(op): 9:52pm On Jan 25, 2017 |
Updates on Living room wall design
|
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 9:49pm On Jan 25, 2017 |
Drawing our Cable Points
|
Properties › Re: Building Detached Duplexes In Lekki (new Dimension To Nigerian Architecture) by skimanski(op): 12:11pm On Jan 25, 2017 |
crisycent: Distribution board and inverter are not the same. Are you aware that batteries explode? Yes sir, Likewise the Indicator for Usage. and the Inverter board switch. I understand if you have the Opportunity locating it on an external portion you do. but doesn't mean locating inside the house is dangerous. |
Properties › Re: Building Detached Duplexes In Lekki (new Dimension To Nigerian Architecture) by skimanski(op): 11:33am On Jan 25, 2017 |
crisycent: Oga, don't you think it is dangerous to have inverter inside the main building? If it is then it means it is dangerous to have the Distribution Board inside the house. So that means it is not dangerous sir. Whats important is that area must be properly ventilated for proper cooling. |
Properties › Re: Building Detached Duplexes In Lekki (new Dimension To Nigerian Architecture) by skimanski(op): 10:33am On Jan 25, 2017 |
Arrival of materials gradually. Iron rods are something else these days. Em be like poor man no go fit build house again.
|
Properties › Re: Building Detached Duplexes In Lekki (new Dimension To Nigerian Architecture) by skimanski(op): 10:28am On Jan 25, 2017 |
Doing our parameter Fence as it is required by the estate. (Take note of existing project in second Pic)
|
Properties › Re: Building Detached Duplexes In Lekki (new Dimension To Nigerian Architecture) by skimanski(op): 10:25am On Jan 25, 2017 |
Proposed Site for Project
|
Properties › Building Detached Duplexes In Lekki (new Dimension To Nigerian Architecture) by skimanski(op): 10:12am On Jan 25, 2017 |
We are still in Victory Park. and right behind our Existing Project. But this time 2 Units of Duplex. One a 5 bedroom duplex and the other a 4 Bedroom Duplex right behind the former. Quality is of high importance in this project and like the previous project in Victory park, we will put in out best. Kindly follow our previous project on the below Link. https://www.nairaland.com/2543797/4-bedroom-duplex-new-dimensionBack to the Matter on hand Building InformationProposed 4 Bedroom and 5 Bedroom detached duplex. Land Size 900 Sq.m Area of Building 310 Sq.m
BUILDING 1 GROUND FLOORGuest w/c Inverter Room Main Living Room Dinning Guest Bedroom Kitchen Store Maid's room FIRST FLOORPrivate Lounge Master's Bedroom (With Walk in Closet) Boy's Room Girl's Room Gym Study room PENT FLOORMaster's Lounge, with bedroom and w.c BUILDING 2 GROUND FLOOR [/b]Guest w/c Main Living Room Dinning Guest Bedroom Kitchen Store Maid's room
[b]FIRST FLOORPrivate Lounge Master's Bedroom (With Walk in Closet) Boy's Room Girl's Room Client: Non-Nairalander Architect: Dezyns and Structures Ltd Project Contractor: Dezyns and Structures Ltd Tel: +2348038390386 / +2348185174782 Email: skimanski4life@yahoo.com / info@dnstructures.com url: www.dnstructures.com Scope of Work: Architectural Drawings to Complete Finishing. Client Expectations: Ultra High 3D Design attached below.
|
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 10:33pm On Jan 24, 2017 |
Also Arrival of Coleman Electric Cables as prepare to resume Wiring works.
|
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 10:32pm On Jan 24, 2017 |
.
|
Properties › Re: Arcadia Groove Estate:constructing Our 4 BEDROOM DUPLEX by skimanski(op): 10:31pm On Jan 24, 2017 |
Arrival of PVC window Profile
|
Properties › Re: Finishing Our Beach House (new Dimension To Nigerian Architecture) by skimanski(op): 10:25pm On Jan 24, 2017 |
FastShipping: Yes, I will send you some updates. I just want this stage they are doing now to finish between this weekend and middle of next week before I take a stock.
The EBM guy disappointed since November. I had to get police to arrest him before he came back to his senses. We've had few setbacks there. Cable being pulled out of the wall and stolen. Few disappointment here and there. Not having windows there slow things down since they came to steal cable there, so we decided to freeze the work till the EBM guy finishes the window. We were to continue at the end of November but the EBM guy who happened to be a nairalander messed things up. Hopefully he finally delivers the windows by end of this week. Nairalanders have messed me up too. I dont know why it happens like that. I just hope they can realize what should be true priority and follow through properly. Anyway, we are here anyday any time. You know we have grown now. |
Properties › Re: Finishing Our Beach House (new Dimension To Nigerian Architecture) by skimanski(op): 9:09pm On Jan 24, 2017 |
FastShipping: Fantastic!
These POP ceilings look perfectly okay for my taste. These guys that work with you or for you are something else. They are born to do this.
I'm currently uneasy with how the finishing of my house is going. We are at a critical stage that I cannot afford to keep seeing mistakes after mistakes due to lack of supervision. I bought some of the best available materials for the finishing of my house and I cannot wrap my head around it to see those materials mishandled by incompetent hands working on my house without adequate supervision too. The supervision on the work is 4 / 10.
The next two weeks going to be critical. I have to assess the level of work done to this stage and decide if the same hands can continue to work there. I have big decision to make. I will like to have updates on that |
Properties › Re: Finishing Our Beach House (new Dimension To Nigerian Architecture) by skimanski(op): 10:38pm On Jan 23, 2017 |
FastShipping: Now we know 
Bunch of incompetent people parading themselves as professional builders. Welcome to the life of a honest Nigerian, looking for good builders to help them archive their dream home. |
Properties › Re: Finishing Our Beach House (new Dimension To Nigerian Architecture) by skimanski(op): 10:18pm On Jan 23, 2017 |
FastShipping: Oga, this house looks like one project Brabus displayed last year. Looked Like it to me too, but never ever got to see that project go further forward so couldn't get to compare and confirm. And besides, the guys that messed up the plastering is definitely not Next Home, because I met with the guy myself. |
Properties › Re: Finishing Our Beach House (new Dimension To Nigerian Architecture) by skimanski(op): 10:16pm On Jan 23, 2017 |
Toilet POP Works so far.
|
Properties › Re: Finishing Our Beach House (new Dimension To Nigerian Architecture) by skimanski(op): 9:59pm On Jan 23, 2017 |
Resumption of POP works as we await window profile.
|
Properties › Re: Finishing Our Beach House (new Dimension To Nigerian Architecture) by skimanski(op): 9:52pm On Jan 23, 2017 |
And a view of the Great view from the house
|