Proposed Design for Front Unit (2 Units of 3 Bedroom FLats)
|
Proposed Design for Front Unit (a 5 Bedroom Duplex)
|
Current Look of building as we arrive on site.
|
Welcome once again to Dezyns and Structures. this time we're consulted to continue the construction of 2 Units of Building. One, a 5 Bedroom duplex and the Other, 2 Units of 3 bedroom Flats. Just realized we come highly recommended by people we have worked for, and those our clients expect us to deliver same and more once they refer us to others. As a result, we have had to pinch our selves to note that there is no room for errors, as every new one should be an improvement on the previous one. Follow our other works on https://www.nairaland.com/1164230/best-architectural-interior-construction-works Back to the Matter on ground, Construction will commence from First floor slab. |
Kitchen POP
|
Pictures from our concrete cast.
|
Final reinforcement works
|
.
|
Resumption of brick works
|
Pictures from Our German FLoor works
|
Conclusion of Brick works and we erect our scaffolds in preparation for Plastering.
|
Provision for Drains on roof gutters using 100mm Thick Pipe on every 2m interval.
|
Brick works on roof gutters
|
We Design Unique and good designs for very affordable prices. We also build and finish your houses at top quality workmanship. our designs are always unique, so we always advise to handle the project personally. We also do Interior Designs, Shops, Kitchen Rooms e.t.c attached is some of my designs and finishes. Action the say, speaks louder than words architectural designs. Construction, Renovations, and Interiors. (Tiling, Kitchen, furnishings and solving general House problems) Dezyns and Structures. Architect Jude O. Odemwingie. follow us on Instagram: @ dezynstructures email: jude@dnstructures.com email: skimanski4life@yahoo.com website: www.dnstructures.com Tel; 08038390386 or 08185174782 Kindly take your time to Follow our numerous professional works on every page of these links below https://www.nairaland.com/1164230/best-architectural-interior-construction-works https://www.nairaland.com/2067260/lekki-gardens-finishings https://www.nairaland.com/1331375/architecture-lagos-nigeria-construction-duplex https://www.nairaland.com/1522743/new-dimension-nigerian-architecture-construction https://www.nairaland.com/2543797/4-bedroom-duplex-new-dimension https://www.nairaland.com/2963940/arcadia-groove-estate-constructing-4 https://www.nairaland.com/2770635/construction-works-units-flats-new https://www.nairaland.com/2985698/construction-flats-owerri-new-dimension https://www.nairaland.com/3079756/renovation-diary-new-dimension-nigerian https://www.nairaland.com/3349788/renovation-diary-platinum-row-new-dimension https://www.nairaland.com/3364355/contemporary-architecture-story-4-bedroom https://www.nairaland.com/3436850/construction-duplex-4-units-flats https://www.nairaland.com/3591888/building-detached-duplexes-lekki-new https://www.nairaland.com/3587326/finishing-beach-house-new-dimension |
Installation of Window's and Sliding works.
|
Private Lounge POP Works
|
EgunMogaji:is the guy that assisted you a seller or a buyer like you. |
EgunMogaji:The answer is no! Everyone has the way they view how they want to live in their house. The only thing is the let them know what you thing is professionally bad with the plan, and trust me, even if my layout plan might be different, but still doesn't make this one bad. except the fact that light doesn't supply to the lobby. Note it can be better, but will require more space, hence the reason my i asked if there is more space on the land to expand the plan. |
CASTOSVILLA:What are the missing facilities? You don't just say he should design another plan without properly spelling out what you think is wrong with this one. Abeg OP. If you feel this is the only space you have available carry on jare nothing do the plan, only just follow your own advice of putting glass block or glass to illuminate the lobby. The issue of visitors toilet is an issue of preference. I have a visitors toilet in my house that cobwebs have taken over. Then the issue of store window is also secondary. If the space doesn't allow then you are also good. The only way you can re-design to add more things is if you have money or extra land to add more space |
Flaghouse1:It's my pleasure sir !! |
Updates as we resume work on our contemporary duplex. Roof gutter brick works ongoing!!!
|
Updates as we resume reinforcement of Front Unit 1
|
[quote author=Flaghouse1 post=53390990][/quote]To answer your question 1- Its more expensive to use, as a piece of the conventional 9 inch Block cost N200 while this red one I heard is up to N700 as of recently. 2- It can withstand load a lot, but also to some extent. but far more than our conventional. 3- Yes it can be use for decking of floor slab 4- it is highly durable. |
Frame works still on for Front Unit
|
Reinforcement works ongoing on Back Unit
|
abbatoir:My Oga I no know say na u b this ooo. This your new Username so, em b like bad guy name ooo ![]() |
Conclusion of Filling works and We resume mechanical works and Prepare for Iron works on floor area.
|
Decided to Cut off Existing lintel to create new one as We wish to Increase the Height of our doors from the conventional 2.1m (7 Ft) to 2.4m (8ft). A finished Idea of our custom made 2.4m High doors is attached below for us to appreciate the taught behind it.
|
.
|
Updates on POP Works
|
darami:No! Bought them here in Lagos. |
Resumption of POP Works
|