Gradual Arrival of tiles for our Building.
|
Updates on Tiling Works
|
write2obi:Thanks My Oga them. I am Still learning oo! |
Door Subframes
|
My guys trying to work out what to do the the Short Height of the House on the First Floor. Think these Nuggins will have to go up a Bit to Touch the Tie Beams.
|
Looking for a TV Area for the Dinning Such That Everyone Sitting on the Dinning Can View Properly. Thanks to this Concept we have done before. It's save the Day.
|
Living Room Masonry Works Taking its Intended Shape
|
Oboy see class dey go on here ooo. As for me I will work everywhere ooo. Each of my site has a supervisor designated and is been paid properly. Trained and has been working for me for long. I basically don't appear in some of my sites for weeks. But my guys already know what to do. All I need is to draw out what is required and they deliver. It took me a long time to get to this but from the begining it's what I have been aiming for. I want to be able to travel overseas in future for 5 months and not worry about whether the SkiManSki legacy is still ongoing. So if I don't force my self to do it now, will never get there. Do you think the bosses in Cappa and other big construction firms visits all their sites? The answer is no. So how do we get there if we are scarred of projects. I only feel it's because some people do not want to engage the services of competent professionals and logistic officers. They want all the project profit to come to them, that's why they want to manage their projects little by little. To me that's dreaming small and not dreaming big. First thing first. Engrave your ideology into your workers. Create a chain of command. And leave the rest to them. It's not easy I must say, but when you get there is worth it. Because all I do these days is hold my camera like photographer and just patrol around. And also travel around too. Yes for sure when I see any shoddy jobs which is inevitable I repair it and count my losses there, also scold the workers so that they learn. But one things is surpose to be for sure, I must pay them well, because money is the motivation any Nigerian needs. |
Trying to Change the Face of the Living Room. Some Masonry Adjustment Required.
|
Raising of Final Block Level for Ground Floor. Height of Building At this Point before Deck Beam: 2880mm
|
Pictures of Pillars after Concrete cast
|
P291:It Doesn't Require a Structural Support for the Non-Landing as its reinforced connection between the German Floor DPC and First Floor Slab can carry the Flight of stairs. What I agree with you on is the Height of the Building. It is terrible. I wander why they didn't just add one Coach of Brick Works. It means we will have to work hard to ensure that our finishing is top notch so as to cover-up the issue of height in this Building. For all the Flaws of Lekki Gardens Estate, I still commend them for not building Short Houses. |
Attempting to relocate the Distribution Board from Current location to a new location. Wander why they had Situated on that location before.
|
Electrical Conduit Readjustment been Made Around the House. (Kitchen Piping In Pics)
|
Precast Molding Design. External Look taking Shape Gradually.
|
Flat 1: Kitchen Tiling
|
Complete Sealing of Septic Tank Floors. Been Watching it for days now and No Water Out Yet. Thumbs up to my Workers.
|
We plan to Increase the Door Heights. Doors look too short and Ugly. Hope Short People do not take this personal.
|
.
|
Breaking all Existing Wall Tiles, Floor Tiles Subframes, Railings, EtC. Skinning the House in Total
|
Jesusloveyou:Them Just dey form he cry. He's been dead since last year. They just didnt announce till now that they are ready to the New Oba |
.
|
More
|
.
|
Current Look ofthe Building
|
Welcome to Our Renovation Diary. As we did with Creating the Special Thread for Lekki Gardens https://www.nairaland.com/2067260/lekki-gardens-finishing A Special Thread for Architectural Drawings and Finishing. https://www.nairaland.com/1164230/best-architectural-interior-construction-works and Other Threads with Show some of our Construction works https://www.nairaland.com/1331375/architecture-lagos-nigeria-construction-duplex https://www.nairaland.com/1522743/new-dimension-nigerian-architecture-construction https://www.nairaland.com/2543797/4-bedroom-duplex-new-dimension https://www.nairaland.com/2963940/arcadia-groove-estate-constructing-4 https://www.nairaland.com/2770635/construction-works-units-flats-new https://www.nairaland.com/2985698/construction-flats-owerri-new-dimension This Thread has been created for the Sole Purpose of Educating our Followers and The Nairaland Public in General how Achieve the Most Difficult and Demanding tax of all Architectural Programs "(Renovation)". If you go Through our other threads you'll notice we have been on renovation works for some time, but feel we have to document our renovation programs from now on. This will be Starting from "LEKKI COUNTY HOMES". Built by Mega Monds Construction Limited. This 4 Bedroom Duplex plus Service Quarters have been Poorly finished and the Client, (a Guy with High Taste and an Eye for Good things, who will stop at nothing to get what he wants) has taxed us with the Job of Turning this into a Dream Home. So off we go. |
Person wey don die since middle of last year. Na now den dey announce am. Make den go sleep joor |
Proposed 2 Units of 4 Bedroom Semi Detached Duplex. GROUND FLOOR Ante Room Guest w/c Main Living Room Dinning Kitchen Store Guest Bedroom FIRST FLOOR Family Lounge Master's Bedroom Boy's Room Girl's Room
|
.
|
Resumption of Pillars & Lintel Works
|
segcymoor:An Experience Engineer Called Segcymoor Once said "Lets Do Structures Right". So I am following his Lead. |
AkProsper:Nice!! |