Properties › Re: The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" by spyder880(op):
We made preparations and then started to cast the concrete slab...........

Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 6:36am On Oct 02, 2022
ananne:
Good work you are doing Oga Spyder.

I washed given this quotation for plastering are five bedroom bungalow. I don't know what to make of it.

The money for labour seem to be very high. Location is in anambra state.


Sharp Sand= 36,000 x 3 trips= 108,000

Gum Sand= 35,000 x 1= 35,000

Cement= 3900 x 100 bags = 390,000
Transport and job= 20,000

Water supply= 30,000

Workmanship for Plastering is 400,000
( Dressing of doors and windows is not included)

Total amount is 983,000
Workmanship is definitely high, try and bargain if he will throw in door and windows dressing with window hoods or any other designs to make up that workmanship to same amount.
Politics › Re: Gridlock As 'Obidients' Rally At Lekki - PUNCH by spyder880(m): 1:04pm On Oct 01, 2022
We don't mind the gridlock of one day, this is a small sacrifice we are willing to offer for a straight 8 years of good governance that will move most Nigerians into safety and prosperity.
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op):
tranxo:
Thanks. And if you are applying wall screeding?
Same two weeks.
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:02pm On Sep 29, 2022
More window designs.

Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 7:55pm On Sep 29, 2022
We continued work at this window dressings..........

Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 7:53pm On Sep 29, 2022
rukyboy:
Engr. Why the use of horizontal bars for your windows instead of vertical. This is the first time I'm seeing such.
Oh, we have used horizontal bars in so many other projects, it has proven to be tougher to manipulate than vertical bars.
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 7:51pm On Sep 29, 2022
landt:
Well-done sir. I am thrilled with this project as in, the way you were executing them one after the other. Please i want to ask, how many workforce did you use for this massive decking? (the machine operator, masons, sand feeder, stone feeder, water handler, cememt handler, mortar carrier and mortar loader.

Was the casting done in one day and with how many concrete mixer? Most importantly, the mixing ratio of sand/stone/cement
Welcome bro, in this particular project, I used manual mixing method to cast the decking slab. We completed the cast after 3 days work, we had up to 13 micers and 2 masons levelling the cast.
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 7:49pm On Sep 29, 2022
tranxo:
Great masterpiece as usual from the master.

Chief, does cement plaster interact with paint? If yes, how long after plastering should painting be done?

Thanks.
Cement plastering goes through normal curing process like other works, I usually paint after about 2 weeks of plastering if I am not applying wall screeding.
Properties › Re: The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 3:58pm On Sep 28, 2022
landt:
I mean the width and height of the stairup for the beam, I know that the stirrup for the lintel beam is always 9" x 9". What i also mean by the height of the shooting of the decking board is the height of the boards (side by side held together by the kickers) that houses the decking beam
Ok, stirrup height is about 225mm
Properties › Re: The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 3:54pm On Sep 28, 2022
olatalour:
Is the 430 length both Y16 and Y12?
Yes.
Properties › Re: The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 10:32am On Sep 28, 2022
landt:
Hello sir, please what is the measurement of the stirrup for the beams and also the height of the shooting of the deck?

I also noticed that all the beams are 2Y-16 Top and 2Y-16 Bottom, any reason for that?
Do you mean the stirrup spacing, I used 300mm, slab height is planned to be 150mm thick. 2Y16 top and bottom for the beams is consistent with the building plans. Welcome.
Properties › Re: The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 10:26am On Sep 28, 2022
olatalour:
Please how many iron rod was used for this slab?
About 430 lengths of rods worth about 2.1m.
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 9:15am On Sep 28, 2022
More works still ongoing at this site today, more updates later.
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:57am On Sep 28, 2022
Work in progress............

Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:55am On Sep 28, 2022
External window dressing with wall marking around the window area..............

Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:50am On Sep 28, 2022
An external window dressing, on the inside of a balcony........

Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:39am On Sep 28, 2022
Internal dressing of windows all done............

Properties › Re: The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 8:26am On Sep 28, 2022
As we start electrical piping works on the decking platform...........

Properties › Re: The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 8:17am On Sep 28, 2022
At the top of the decking............

Properties › Re: The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 8:12am On Sep 28, 2022
Our work at this site continues, decking slab iron reinforcement works all done...........

Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 7:26am On Sep 28, 2022
rukyboy:
What's your reason for using 5mm against 4mm that's more commonly used.
That's the specification on the windows schedule on the building plans.
Properties › Re: The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 7:24am On Sep 28, 2022
whirlout:
My guy, great job, following with great interest. How much are you budgeting for this entire project from start to finish, painting included?
The uncertainty in the cost of building materials has made a lot of cost estimation difficult in the long term. But N50 - N55m is a likely total sum for a house of this size.
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 11:29am On Sep 27, 2022
orriyomi33:
Hello sir. Well done

How much was the cost of the following casement window sizes?

5 x 4
4 x 4
3 x 4
2 x 2

Thanks in anticipation.
I will find out and let you know.
Properties › Re: Ceiling POP Designs For Your House by spyder880(op): 6:26pm On Sep 26, 2022
How about this style, it will form a continuous flow with the bed............

Properties › Re: Ceiling POP Designs For Your House by spyder880(op): 6:24pm On Sep 26, 2022
From some of our ongoing projects

Properties › Re: Ceiling POP Designs For Your House by spyder880(op): 6:20pm On Sep 26, 2022
More newer designs...........

Properties › Re: Ceiling POP Designs For Your House by spyder880(op): 6:18pm On Sep 26, 2022
Some new designs we have done recently.........

Properties › Re: The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 6:15pm On Sep 26, 2022
TenQ:
Thanks.
But does that make the cost on par with Aluminium pitch roof style?

Thanks again
My brother, I am not sure.
Properties › Re: The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 8:33pm On Sep 25, 2022
TenQ:
How about the difference cost-wise between normal decking and hollow block decking?

Thanks
The hollow block decking is said to be about 20% lower in costs, but I haven't done it personally myself, so my experience on that is very limited.
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:30pm On Sep 25, 2022
rukyboy:
Well-done Engr. Is the glass 4mm or 5mm
5mm glass.
Properties › Re: The Making Of The "Emene Enugu Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 11:15am On Sep 25, 2022
TenQ:
Hello,
I'll like some advice from you.

I am about building a 3 bedroom bungalow and I have an option between
1. Aluminium Pitched Roofing
2. Hollow Blocked Flat Decking and
3. Normal Decked flat Roof

Before committing funds, I'll like to know the cost differences between these three options.

Thank you
To be honest, I think the decking is costlier, followed by aluminium pitch roofing, but I cannot be sure since I don't even have the location of 4he project. Some costs are location dependent. Happy weekend.