Spyder880's Posts
Nairaland Forum › Spyder880's Profile › Spyder880's Posts
1 2 3 4 5 6 7 8 9 10 (of 1148 pages)
. |
. |
michlins:Thank you my brother, I will rest for sometime and maybe come back later. Thanks for all your help and collaboration. |
Remembering this project ............. |
DrinkWater10:This looks nice. |
Some roads will be closed to other traffic in the morning.
|
Its surprising to say the least, that people will go out and take medications which untrained people will administer just because they heard it cures one sickness or the other. Nobody checks to see the side effects or the long term damage it does while curing the present small sickness, then creating a bigger one instead. |
I watched the whole video, and the only thing that's true about the video is the single gutter where a puddle of water is, in a rainy season o And maybe the back of the terminal where a little grass is growing, not even tall enough to attract concern. The true situation of the stations is that they are working properly every day, with buses shuttling from one terminal to the other every minute of everyday, even to Nsukka and Agbani. The video showed keke moving around to pick and drop passengers at the terminal, that proves it's very operational. The masses in Enugu are enjoying the buses and that's what matters. As for the small complain about the environment at the terminals, I am sure the government will do something about it soon, they have proven to be the listening types, and sanitation in the state is on a very high level. They seem to be starting another new terminal at Abakpa, around 1st bus stop area, you can see the demolition of the old buildings there, I heard they will compensate the owners. |
We are happy with these new projects, our governor is doing well. |
I agree, Enugu is a decent state. |
Still available, happy new month. |
Plastering of this house is currently ongoing......,..
|
Inception:130m |
Happy weekend everyone |
This is very commendable, we are loving it. |
Beautiful, that's a nice rendition of a powerful cultured heritage. |
Jman06:Okpa cannot compare with moi moi, okpa is ahead in the scale of choice. One woman was selling okpa even at night yesterday. People love it that much. |
johannesburg:How is it overrated? Its actually the most underrated food in Nigeria. I plan to buy some this morning to take to far work sites, workers will work extra if they know I came with it ![]() |
Okpa is the best snack in the world today, enjoyed in many different flavours and methods of preparation. There are festivals framed around okpa and it's still advancing in popularity. There are many variants of this great food Okpa with egg Okpa with fish Okpa with vegetables Okpa with meat Okpa with local spices What about the okpa without oil, appearing white and eaten on some native festivals, that tastes superb.
|
ArcToyin:Thank you very much Architect. You're doing well. |
D00msDay:Good morning bro, Lokoja is a little far for me at this time. Thanks for the offer. |
sommerfeltservi:You are right, I think what he should have said is average total cost. |
Qsand:If you get a place inside town for about 40m, the construction cost of a 4 bedroom bungalow will be roughly 50m with standard materials, not luxury finish. That will be an average of N90m for a new building of 4 bedroom bungalow. Thanks. |
CARLOSZ:You're welcome. |
Esthered:No it wont be. Just like 10 feet x 11 feet rooms. |
CARLOSZ:About 23 to 28m, depending on actual finish materials. |
Ok, let's see extraordinary mansions ![]() For a princely cost of 292.5m, this mansion could be standing in your compound. Everything from start to finish. You can call us to your site as soon as tomorrow 0803 335 0750 for more information, call or WhatsApp.
|
A 5 bedroom bungalow here for 37.5m for
|
This contemporary design 4 bedroom bungalow for 30m for everything.
|
This bungalow is made up of 4 bedrooms (2 ensuite, 2 shares a bathroom) 1 main living room 1 kitchen 1 front porch 1 back sit out This building will cost about 33m to build from start to finish using modern materials and technology.
|
What about this style? 5 bedrooms. 120m for everything, all building materials, workmanship and supervision plus finish materials, all works till painting and ready to move in.
|
Let's look at this style of building with the following features; 4 ensuite bedrooms 1 front porch 1 main living room downstairs 1 dining room 1 kitchen 1 kitchen store 1 central lobby downstairs 1 staircase Main building only, start to finish, painting, hand over of keys is N85m.
|
