Uwemjack's Posts
Nairaland Forum › Uwemjack's Profile › Uwemjack's Posts
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (of 27 pages)
[quote author=calabardick post=85050013][/quote]idioko, utom abadie |
computerglobal:Recieved with thanks |
computerglobal:Yet to get it uwemjack2000@yahoo.com omitted the *c* previously |
[quote author=computerglobal post=82531847][/quote]Uwemjack2000@yahoo.com |
4t1bk36b37u187391 help with report. Thanks |
How much |
Mjkwess:Location? |
GAZZUZZ:Good innovation. Permission to replicate this! |
GAZZUZZ:Telling someone to go hang himself is serious, no matter the history behind it? |
dannybrasky:This is very wrong even as a joke. |
Cosplay:He did not buy an accidented car! The accident as shown here was in 2014 and someone bought it repaired it and used it till he decided to sell it at auction in 2019! five years later! OP Instead of arguing or contesting the facts accept and excuse your oversight and continue your sales. The accident is not severe |
gigtrainee:Thanks |
Help with the report of jthba30g765164277. Thanks |
Debosneh31:https://www.google.com/url?sa=t&source=web&rct=j&url=%23&ved=2ahUKEwinq_2FoMnjAhUUV8AKHS67CHkQwqsBMAF6BAgHEAo&usg=AOvVaw0VTJzWxrN8ZFOD4xbU2nov |
Debosneh31:If i guess right you don't need to change the switch it needs to be reset. It's a safety mechanism on the car, the car was still rolling when you shifted gear into park. So its now hard to shift your gear to park, drive or reverse, pressing the gear release botton may help start the car but it goes back to being hard. If the symptoms described above is what you are experiencing and you are diy the attached will help.
|
Am interested in the black camry, more pictures will help |
uwemjack:� |
[quote author=computerglobal post=78871830][/quote]You are spamming! |
Kindly help with this vin 2hgfa16527h023707. Thanks |
amSTARboy:1.6m ready |
What is wrong with the asian specs? jceesquare: |
How to estimate cost of painting. |
In terms of paying labour for setting the blocks. Two options - you can pay them per block between ₦45 to ₦50 per block or - daily payment but with a minimum of 100 blocks layed per day |
For those who want to know materials required For total number of blocks multiply the area of the wall by 10 will give you the required quantity. For bags of cement you will need approximately 1 bag of cement to set 50 blocks For sand you will need a trip of 20ton sand to set 1500 blocks. |
Fun in what sense? I designed a fence using my parameters and i arrived at an estimate. I did an example with a survey plan i believe that should suffice for what you need to make your projection. essenceplus: |
You can use data provided to make a projection. Cheers sexy74: |
You can use data provided to make a projection. Cheers essenceplus: |
Example: From the design plan shown, the total perimeter of the site is = 29.4+13.7+26+13.2= 82.3m The cost of fencing the plot will then be 82.3 x ₦26,158 = ₦2,152,803. based on the height of the proposed fence, as well as the type of foundation to be used the rate (₦26,158) will vary i.e be more or less
|
Usually on most of our private lands we only do the substructure and superstructure to secure the land. Finishing only comes into play when we move in, as such i will leave this calculation at this level. In summary to arrive at an estimate of what it would cost you to build a fence around the perimeter of land you can use this estimate. First measure out the perimeter of the land in metres, then multiply by the cost calculated above. From my calculation s above a fence based on my designed example will cost ₦26,158 per m² to build. |
Superstructure Block wall Area for blockwall = 2.5 x 10 = 25m2 In 25m2 of wall there is approximately 225pieces of blocks each costing ₦240 Total cost of blocks = ₦54,000 Bags of cement required for setting 225 pieces of blocks is 5 bags, each costing ₦2,600 Total cost of cement =₦13,000 3tons of sand is required to set 225 pieces of blocks 20tons of sand cost ₦50,000 there required sand will cost ₦7,500 Cost of blocksetting for 10m of fence is ₦74,500 Cost of same for 1meter is ₦7,450 Columns There are 4 columns in my designed length Concrete in 4 column = 0.53m3 Reinforcement in column = 80 x 0.53 = 42.4kg Formwork to sides of column, each column needs 2 planks, total of 8planks required at ₦1500 each, labour with other materials should be around ₦640 Cost for columns Concrete = 0.53 x ₦32,000 = ₦16,960 Reinforcement = 42.4 x ₦260 = ₦11,024 Formwork = 8 x ₦2,100 =₦16,800 Total is ₦44,784 for 10m 1 metre of fence will cost ₦4,478 in columns Summary The superstructure of the fence block setting and columns only will cost ₦11,928 per metre |
Foundation The drawing below is a section through the foundation of the fence. Cost of excavation This can be calculated using the length of the fence or the volume of excavation If length is 10m then cost at N500 per m assuming the earth is not hard makes it N5,000 Using volume which is 0.6 x 0.7 x 10m = 4.2m3 Cost of excavation at ₦1,200/m3 = ₦5,040 Cost of blinding and inverted T-concret beam Volume of concrete blinding = 0.7 x 0.05 x 10m = 0.35m3 Concrete in inverted T-beam = (0.1 x 0.7 x 10m)+(0.4 x 0.23 x 10m) = 1.62m3 Total concrete in foundation = 1.62 + 0.35 = 1.97m3 approximately 2m3 Cost of 1m3 of concrete based on data = ₦32,000/m3 Cost = 32,000 x 2 = ₦64,000 Cost of reinforcement Since the reinforcement is not much i will use a factor of 80kg per m3 of concrete. In this case 1.62m3 of concrete will give 130kg of reinforcement 1000kg cost ₦230,000 to buy, Ironbender will collect ₦20,000 for every 1000kg And he will use approximately N10,000 worth of binding wire. Adding all up we have ₦260,000/1000kg So 130kg will cost me ₦33,800 Cost of formwork Total of 13 nr 1 x 12 planks required at ₦1,500 each; = ₦18,000 Total of 30 nr of 2 x 4 planks at ₦500 each; = ₦15,000 Nails of ₦1,500 required Carpenter will collect ₦500/m² ; = ₦5,000 Total on formwork = ₦39,500 for 10 metres Summary Cost of 10meter foundation = N142,300 Therefore 1meter foundation = N14,230
|