₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,344,605 members, 8,512,714 topics. Date: Tuesday, 03 November 2026 at 08:31 PM

Toggle theme

WebSurfer's Posts

Nairaland Forum › WebSurfer's Profile › WebSurfer's Posts

1 2 3 4 5 6 7 8 ... 100 101 102 103 104 105 106 107 108 (of 179 pages)

Phones › Re: Unwanted Calls/sms: MTN, Glo, Airtel, Others Fleece Nigerians N547bn Annually by WebSurfer(m): 9:33am On Mar 14, 2016
Criminals
Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 9:30am On Mar 14, 2016
laptopsale:
Lovely design you got there, good job.
thanks bro..

Kubs architects: 07061814655
Politics › Re: Financial Crisis Hits PDP, Debts Now N872 Million- Trail Newspaper by WebSurfer(m): 9:25am On Mar 14, 2016
JONATHAN SELF grin grin grin grin grin grin
Politics › Re: No More Single Bill For Presidential Assent –reps by WebSurfer(m): 9:24am On Mar 14, 2016
angry
Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 6:55am On Mar 14, 2016
twinskenny:
\


yes ooo baba.. saw someone displaying other people job sometime ago.. the owner ask him to snap himself with the background of the building lol
lol, Mr E.J is now very popular on Nairaland. I didnt call any name ooo grin grin grin
Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 6:17am On Mar 14, 2016
EgunMogaji:
I'm confused, is there a german floor or not?
there is brother. It was done before we continued block work..
Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 6:15am On Mar 14, 2016
olumide4christ:
Bros welldone on this project....

However, let me state that your not casting the german floor (ground floor bed) before continuing with the blockwork in superstructure will cause issues in the building later. These issues include:
- cracks between the floor & the walls of the rooms due to differential settlement between floor and walls
- influx of termites and other insects into the building due to the cracks
- cracks in the walls as a result of differential settlement of the walls
- rising dampness through the cracks created by the differential settlement

Note that casting the german floor before continuing the superstructural blockwork is STANDARD in construction; you may confirm from any qualified and registered construction professional (architect, quantity surveyor, engineer, builder).

However, you have already gone beyond the stage of remedy, so wishing you all the best.
we casted it, i only explained saying i wasnt around when it was done... Thank you
Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op):
I'll stop here for now

Cost enquired to the DPC level is around 2.1 million including community level of 100k ,
Survey , And some others not neccesary to point out.


Will give the later expensis procured to the decking/beam level. For now work is still on going
Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 10:28pm On Mar 13, 2016
Consisting ;
Two bedroom downstairs,
Antel/Visitor's room,
Living room,
Dinning,
Store,
Laundry room,
A Big kitchen with enough space for another dinning inside the kitchen for a modern house,
Visitors toilet.

A pool by the right but there an obstruction Of view
Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 10:23pm On Mar 13, 2016
Project sterotype.

Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 10:19pm On Mar 13, 2016
We'll pause for now as you can ask any question.
Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 10:14pm On Mar 13, 2016
Continued work. To the window level

Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 10:05pm On Mar 13, 2016
German flooring is completed,
Blocks available and molded by ourself= 3,200 for now as we targeted and estimated around 4,000 blocks to the beam/decking level excluding the recent foundation blocks already used.
Molder took 700 per one bag which produced 25 blocks per bag. (30 might have been used but for a stronger block, we choosed 25/bag)

Normally 800 per bag as normal standard price but ours was by a closely related contact.


From The below photo, we already continued with block works.

We actually wanted to erect only pillars completely to the decking level before block work but we thought it was going to procure more expenses as we might not need to buy and spend more on woods for boarding.

So we took the alternative of continuing block work.

Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 9:53pm On Mar 13, 2016
From this point. We took our time getting two trailer load of granite valued at 180k per trailer load amounting to 360k.

I wasnt around for the sand-filling process but it took 30 bush loading trailer loads of sharp white sand.

workmanship for filling the sand into it was at 1,500 per 1 load = 30*1,500 = 45k

DO NOT WORRY ABOUT THE OTHER EXPENSIS FROM THE BEGINNING, ALL RECORDS OF THE COMPLETE PROCESSES ARE KEPT ACCURATELY.
Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 9:48pm On Mar 13, 2016
I would have posted the design of the building to understand the class and standard of structure we are targeting but i will not like to do that for now.
Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 9:47pm On Mar 13, 2016
The view.
Note: this job is on a 30By30 piece of land (100x100)

Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op):
Up next, we must install our pipes and do neccessery plumbing works as we are building a completely standard and modern building.

Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 9:40pm On Mar 13, 2016
Now we must do chaining of the entire building.
Below are the capentry aspects

Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 9:34pm On Mar 13, 2016
We are using a 9-inch blocks for the project.. You can ask questions as i might not be very detailed on the processes..


Disclaimer : any part of these photos must not be reposted anywhere, copied or used for any part of advertisment or reproduction as this is solely for the purpose of educating, giving insightful knowlegde to determined and interested builders.
I would not like to mention some few names on this property section who is capable. grin grin
Thank you.

Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 9:26pm On Mar 13, 2016
At the begining of this project, there was a bit of hurry so we actually bought blocks. Also , bought granites in fragments. Until DPC level.
Below are pictures.

Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 9:20pm On Mar 13, 2016
More pictures with the third step.

Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 9:17pm On Mar 13, 2016
After the foundation and basket digging, we proceeded with the rods.

Properties › Re: Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 4:27pm On Mar 13, 2016
First steps for the proposed building project. Will give an analytic expenses enquired later in details

Properties › Construction and Cost of A 6 Bedroom Duplex In Details And Pictures by WebSurfer(op): 4:21pm On Mar 13, 2016
Location : Delta state.
Politics › Re: VP Osinbajo’s Trip To India Cancelled After Realizin Dat Saraki Will Take Over by WebSurfer(m): 2:03pm On Mar 13, 2016
luvinhubby:
$250,000 of public funds wasted like that.

APC is a scam.
na lie ee.. All these mediums might just be a way to take by force.. Trust me them for no even fit show you authentic receipt of payment.
Celebrities › Re: Olakunle Churchill Visits Ondo For Charity Projects (Photos) by WebSurfer(m): 1:27pm On Mar 13, 2016
tpiar:
why cant you people do things in a non mercenary manner and without highlighting states because of politics or greed? huh

you must be silly.
well, i have been on nairaland long enough to know id: tpia and her frequent bitter state . I wouldnt need to argue anything with you.
Properties › Re: Project Done Within The Past Weeks by WebSurfer(m): 1:23pm On Mar 13, 2016
back2sender:
Lets have your picture in the background of these "photo" of the different stage of the construction with timelines.
i can bet you he wont do that
Celebrities › Re: Olakunle Churchill Visits Ondo For Charity Projects (Photos) by WebSurfer(m): 1:02pm On Mar 13, 2016
tpiar:
The governor of Bayelsa also seems to be from Ogun state.

Has Mr Churchill ever visited the state before now? Just curious.

That aside, there seems to be widespread tracing of roots these days (eg Ooni's new wife from Benin who they said is from Ife).

In addition, Mr Churchill's wife said he is Obasanjo's son, so he is actually Ogun on his dad's side?

This is rather confusing can anyone clarify.

Welcome home Mr Churchill. Hope you enjoy your stay.

Where is his mum from btw, exactly.
why cant you people just appreciate something good for once and forget about where he is from or not?? Why
Properties › Re: How Can I Build A 6 Bedroom Duplex With 6.5m Naira by WebSurfer(m): 12:14pm On Mar 13, 2016
erico2k2:
Well said. Could you plz share fotos. It would help others and myself inclussive.
ok then.. I'll start a thread on that later this evening when i return from site.
Properties › Re: How Can I Build A 6 Bedroom Duplex With 6.5m Naira by WebSurfer(m): 7:55pm On Mar 12, 2016
and op, sorry. the last 3 bedroom flat i built to finishing, furnishing took around or more than 24-25Million naira from me
Properties › Re: How Can I Build A 6 Bedroom Duplex With 6.5m Naira by WebSurfer(m): 7:52pm On Mar 12, 2016
op, i am currently building a 6 bedroom duplex and so far, i have spent 4,109,710.00 , Building is on A block after window level, Granite , blocks , rods taking us to decking level available. with an estimate of around 400k more totally 4,500,000 Should take us to Beam level before Decking. i hope this helps. i can give you pictures or snapped complete records. Meanwhile, the location of where you are building matters alot.