Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,153,244 members, 7,818,835 topics. Date: Monday, 06 May 2024 at 06:17 AM

The Road Transport System Since Gej Assumed Office, Positive Or Negative? - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / The Road Transport System Since Gej Assumed Office, Positive Or Negative? (416 Views)

Buhari: I Felt Like Absconding When I Assumed Office / 5 Governors Who Were Already Billionaires Before They Assumed Office / Things We Have Noticed Since PMB Assumed Power - Must Read (2) (3) (4)

(1) (Reply)

The Road Transport System Since Gej Assumed Office, Positive Or Negative? by topedorichkid: 5:56am On Mar 21, 2015
ROADS

•A total of 651km of roads was paved in bituminous layers in 2012.
•A total of 32 Highway projects were completed in 2012.
•Following the recent effects of floods in some parts of the country, the administration intervened by constructing new bridges and re-instating washed out embankments.
•The Ministry of Works on the order of President Jonathan unveiled Operation Safe Passage, a programme aimed at recovering deplorable sections of major roads in the country to ameliorate the sufferings usually experienced by road users during festive seasons. Under this programme, key roads in the six geo-political zones of the country, were rehabilitated.
•80 projects prioritized in 2012 two have been completed, three are over 90 percent completed, five are over 80 percent completed, eighteen are between 50-79 percent complete while the rest are in different stages of completion.

•The radical intervention by the Subsidy Reinvestment Programme SURE-P in the road sector in 2012 resulted in accelerated work on the rehabilitation of the following projects:
Abuja-Abaji-Lokoja;
Benin-Ore-Sagamu dual carriageway;
Onitsha-Enugu-Port Harcourt dual carriageway;
Kaduna-Maiduguri dual carriageway;
East-West Road
The Second Niger Bridge for which a sum of five billion naira has been set aside.

These roads cover a distance of 1,664 kilometres and are at various stages of completion. Most of these projects are due for completion and commissioning in this year..
•As a major turnaround Federal Government also terminated the concessioning
agreement with Bi Courtney company on the rehabilitation and reconstruction of the Lagos-Ibadan expressway. The road rehabilitation work is currently been handled by two construction firms and will be completed this year.
•The Jonathan administration has entered into collaboration with multi-lateral agencies under the Road Sector Development Team (RSDT) scheme.
•Under this framework, the RSDT is currently implementing road rehabilitation, upgrading and maintenance, institutional strengthening and policy reform, and road safety improvements with the credit from the World Bank; and additional funding from the Africa Development Bank (AfDB).
•The RSDT in collaboration with multi-lateral agencies rehabilitated/ maintained a total of 257 kilometres of road length in 2012. Two projects under the scheme, the Mokwa-Bida Road and the Akure-Ilesha Road will have their contracts awarded in June.
•Also, the Ministry of Works is currently working out modalities for the execution of the dualisation of the Keffi-Lafia-Makurdi-Enugu (9th Mile) roads in Nasarawa, Benue and Enugu States with funds from the Export-Import Bank of China.. this is why you can now travel round the whole NIGERIA on a Road! GEJ all the way
Re: The Road Transport System Since Gej Assumed Office, Positive Or Negative? by temitemi1(m): 5:59am On Mar 21, 2015
It can only get better with GEJ! GEJ till 2019!!!

1 Like

Re: The Road Transport System Since Gej Assumed Office, Positive Or Negative? by lilbabyak(m): 6:07am On Mar 21, 2015
disaster



sai baba

(1) (Reply)

I Will Never Forgive Buhari: Ayo Adebanjo / Even Obama Calls For Continuity. / 11 Embassies, 96 Others To Monitor Polls – INEC

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 50
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.