Welcome, Guest: Register On Nairaland / LOGIN! / Trending / Recent / New
Stats: 3,151,640 members, 7,813,150 topics. Date: Tuesday, 30 April 2024 at 07:48 AM

Gantt Chart Of Activities For The Construction Of A Duplex - Properties - Nairaland

Nairaland Forum / Nairaland / General / Properties / Gantt Chart Of Activities For The Construction Of A Duplex (1785 Views)

Photos From The Construction Of Asaba Mall (shoprite) From Inception To Completi / The Construction Of 2-bedroom Twin Flats In Calabar / Simple Guild To The Construction Of Timber Roof Truss In Nigeria (2) (3) (4)

(1) (Reply) (Go Down)

Gantt Chart Of Activities For The Construction Of A Duplex by Kswiss001(m): 9:34am On Jul 17, 2015
Pls can someone help me out on how a gantt chart showing the activities of planning for the construction of a duplex should look like...
Re: Gantt Chart Of Activities For The Construction Of A Duplex by Kswiss001(m): 9:47am On Jul 17, 2015
Like I need the procedures in the construction of a storey buildingI from the design stage...
Re: Gantt Chart Of Activities For The Construction Of A Duplex by Nobody: 10:18am On Jul 17, 2015
Gantt chat without duration? Cos the durations will depend on the size of the duplex.

But basically its 2 stages. Design and construction.

Design:
U will need a survey plan of the site, showing the site area, shape, access road and geographical north.
You talk to the client about his preferences in the building. Thereafter u get to doing the architectutal design or give to an architect is you dont know how to design. You present initial drawing for corrections and modification to ur client. Once approved u proceed to do the structural, mechanical, and electrical aspects of the drawing. Get dem stamped by registered professions in each field and submit the final drawings to your client fot him to get LGA/ council approval.

Construction:
Site clearing
Set up temporary or permanent perimeter fence
Setting out (iron wotos can start as soon as u finish setting up perimeter fence)
Excavation.
Bliding of foundation footing and strip foundation base (column base)
Block work to dpc level.
Cast columns up to dpc level
Cast ground floor slab (German floor)
Block work to lintel.
Boarding and casting of column and lintels
Block work after lintel to beams
Form work for columns beams and slabs as well as supports and brazing
Construct and fix reinforcement
Cast slab beams and column.
Block work to lintel.
Formwork for column
Cast column concrete
Block work to roof beam
Cast roof beam.
Roof work
Electrical and plumbing firings
Ceilings
Plastering and finishing
Doors and windows and other furniture
Dressing. Tiling etc.

Stair case can be cast anywhere before or after casting of first floor slab!

These are basically the proceedures. I may have missed some, but that's it basically!

1 Like

Re: Gantt Chart Of Activities For The Construction Of A Duplex by Kswiss001(m): 11:36am On Jul 17, 2015
vfactor:
Gantt chat without duration? Cos the durations will depend on the size of the duplex.

But basically its 2 stages. Design and construction.

Design:
U will need a survey plan of the site, showing the site area, shape, access road and geographical north.
You talk to the client about his preferences in the building. Thereafter u get to doing the architectutal design or give to an architect is you dont know how to design. You present initial drawing for corrections and modification to ur client. Once approved u proceed to do the structural, mechanical, and electrical aspects of the drawing. Get dem stamped by registered professions in each field and submit the final drawings to your client fot him to get LGA/ council approval.

Construction:
Site clearing
Set up temporary or permanent perimeter fence
Setting out (iron wotos can start as soon as u finish setting up perimeter fence)
Excavation.
Bliding of foundation footing and strip foundation base (column base)
Block work to dpc level.
Cast columns up to dpc level
Cast ground floor slab (German floor)
Block work to lintel.
Boarding and casting of column and lintels
Block work after lintel to beams
Form work for columns beams and slabs as well as supports and brazing
Construct and fix reinforcement
Cast slab beams and column.
Block work to lintel.
Formwork for column
Cast column concrete
Block work to roof beam
Cast roof beam.
Roof work
Electrical and plumbing firings
Ceilings
Plastering and finishing
Doors and windows and other furniture
Dressing. Tiling etc.

Stair case can be cast anywhere before or after casting of first floor slab!

These are basically the proceedures. I may have missed some, but that's it basically!

Thanks for the contribution. Pls can u also help on the durations for these procedures
Re: Gantt Chart Of Activities For The Construction Of A Duplex by Nobody: 12:54pm On Jul 17, 2015
Kswiss001:


Thanks for the contribution. Pls can u also help on the durations for these procedures

Durations depend on the work lord and work force u mobilize to do the work.

I can only give u durations for curing of slabs (21 days) and lintels (3 days to remove the boards on the sides).

(1) (Reply)

Brand New Wrought Iron Security Gate For Sale In Ph (pics) / Room And Parlor Self Contain For Rent / Fenced 1&half Plot 4sale@peter Odili Portharcourt

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 33
Disclaimer: Every Nairaland member is solely responsible for anything that he/she posts or uploads on Nairaland.