Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs - Politics - Nairaland

Nairaland Forum / Nairaland / General / Politics / Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs (14104 Views)

Only 8 Agencies Allowed To Operate At Nigerian Ports - NPA / Ajaokuta Steel To Operate At Full Capacity By 2017 – FG / Security Patrol Men At The Shiroro Dam In Niger State (photo) (2) (3) (4)

(1) (2) (Reply) (Go Down)

Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by 989900E: 11:01pm On Jul 13, 2016
The Shiroro Hydro Power Station has expended about N2.4 billion for the repairs of its four turbine generators to bring the plant to full capacity of 600 megawatts.

Dr Olubunmi Peters, SHPS Executive Vice Chairman, disclosed this on Wednesday to newsmen in Shiroro, Niger.

He said that the completion of the repairs of the intake gate of unit four of the plant would sustain the installed capacity of the station to generate 600mw power.

“The SHPS which is situated on Kaduna River in Niger state with four turbine generator units as Unit 1, 2, 3 and 4. Each unit has a capacity of 150mw, giving the station an installed capacity of 600mw.



“When we took over the station on Nov. 1, 2013, under a 30 years concession agreement with the Federal Government, it was then we got to know that the water intake of Unit 4 was damaged.

“The damage of the water intake was about 60 meters under zero visibility which was difficult to access and repair.

“This resulted to the reduction of SHPS output from 600mw to 450mw.

“But after several failed consultations with engineering companies, finally, we reached an agreement with the Tetra Tech Inc of USA to assess all structures and the damages through the use of deep water sona technology.

“It was then discovered that there was a large piece of concrete measuring about 6 meters by 2 meters in the scroll case of the unit,” he said.

Peters said that after a disagreement with Tetra Tech Inc, the power station then engaged Power China Company in conjunction with Sinohydro of China to complete the project.

He added that the project is one quarter of the power station generation capacity, adding that the station is fully upgraded to the installed capacity standard.

“The piece of concrete then resulted to structural failure at the water intake of Unit 4.

“The Power China used high-tech equipment to repair the structural damage on the lintel of Unit 4, and the bulk head.

“Now this piece of concrete has been removed from the scroll thereby restoring the output of Unit 4 to 150mw.

“The four Units are now very fully functional and each Unit will now be generating 150mw energy which will amount to 600mw energy generation,” he added.

Similarly, Mr Isaac Akanbi, Assistant General Manager Hydrology and Dams, said that the repairs of Unit 4 would restore the initial generation capacity of 600mw.

“This project is a great achievement so far, and we are happy that the unit can now generate 150mw which will be added to the 450mw that is being generated making it 600mw,” he said.

However, he explained that the continuous attacks by the Niger Delta Militants on power stations that uses gas to supply electricity was responsible for shortage of power supply in the country.

“Most of the power stations that uses gas have been disconnected from their supply. The few hydro power stations like Kainji, Jebba and Shiroro cannot feed the national grid.

“Unless the power generation is increased through restoration of some of those power plants, we may not be able to resolve the problem easily,” he added.


http://punchng.com/shiroro-power-plant-operate-full-capacity-repairs/

9 Likes

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by LRNZH(m): 11:38pm On Jul 13, 2016

1 Like

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by slimfit1(m): 11:42pm On Jul 13, 2016
Solar time na him we dey so.

1 Like

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by Nobody: 11:44pm On Jul 13, 2016
I hear
Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by Femich18(m): 12:24am On Jul 14, 2016
Alryt we don hear...I hope the MW generated will rise to about 10000 if possible second quarter of next year.

2 Likes

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by Israel5(m): 1:02am On Jul 14, 2016
Thank God. God is working on Nigeria.

4 Likes

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by KINGwax007(m): 1:13am On Jul 14, 2016
Don't worry oga, we knw who dey cause the power failure and we urge them to continue.

13 Likes

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by EazyMoh(m): 2:16am On Jul 14, 2016
I think we shall consider either upgrading kainji if possible, or try build a bigger hydro plant similar to that China own. Since these people wouldn't allow us use the gas which is the cheapest and simplest form of power generation.

32 Likes 1 Share

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by adconline(m): 2:50am On Jul 14, 2016
Key word : TO OPERATE

1 Like 1 Share

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by TPAND(f): 6:13am On Jul 14, 2016
Companies are just scamming the gullibility out of Nigerian ministers. It's a know fact in the world, no amount of turn around maintenance can bring back. Machine to a 100% efficiency.

Anyway I hope someone communicates this to the SAN Minisiter of Darkness. He should stop going to the press to impress that he is working, we see no work

8 Likes

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by AntiWailer: 6:15am On Jul 14, 2016
TPAND:
Companies are just scamming the gullibility out of Nigerian ministers. It's a know fact in the world, no amount of turn around maintenance can bring back. Machine to a 100% efficiency.

Anyway I hope someone communicates this to the SAN Minisiter of Darkness. He should stop going to the press to impress that he is working, we see no work

You are 'The pained' right?

I sense it from ur submission. grin

46 Likes 3 Shares

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by sarrki(m): 6:19am On Jul 14, 2016
Pls start work on mambilla hydro 6000MW and live our oyel money people Nigeria is moving forward.

16 Likes 2 Shares

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by sarrki(m): 6:21am On Jul 14, 2016
TPAND:
Companies are just scamming the gullibility out of Nigerian ministers. It's a know fact in the world, no amount of turn around maintenance can bring back. Machine to a 100% efficiency.

Anyway I hope someone communicates this to the SAN Minisiter of Darkness. He should stop going to the press to impress that he is working, we see no work


Chai chai wailers association regional manager spotted

31 Likes 1 Share

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by ConqueredWest: 6:32am On Jul 14, 2016
EazyMoh:
I think we shall consider either upgrading kainji if possible, or try build a bigger hydro plant similar to that China own. Since these people wouldn't allow us use the gas which is the cheapest and simplest form of power generation.

You mean the 5%

4 Likes

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by Almajiri1: 6:33am On Jul 14, 2016
TPAND:
Companies are just scamming the gullibility out of Nigerian ministers. It's a know fact in the world, no amount of turn around maintenance can bring back. Machine to a 100% efficiency.

Anyway I hope someone communicates this to the SAN Minisiter of Darkness. He should stop going to the press to impress that he is working, we see no work
You can imagine the once celebrated turn around maintenance of kaduna refinery with billions gone yet no show.

3 Likes

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by captleonerd(m): 6:42am On Jul 14, 2016
TPAND:
Companies are just scamming the gullibility out of Nigerian ministers. It's a know fact in the world, no amount of turn around maintenance can bring back. Machine to a 100% efficiency.

Anyway I hope someone communicates this to the SAN Minisiter of Darkness. He should stop going to the press to impress that he is working, we see no work
how will you see when you keep encouraging NDA to blow up more pipelines.

27 Likes 1 Share

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by 989900E: 7:25am On Jul 14, 2016
sarrki:
Pls start work on mambilla hydro 6000MW and live our oyel money people Nigeria is moving forward.

Mambilla will give us roughly 3000 MW, but that is a big boost too -- it takes us to 9-10,000 MW!

We need to review our energy and power laws, and transmission issues though.

7 Likes 1 Share

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by fyneguy: 7:37am On Jul 14, 2016
EazyMoh:
I think we shall consider either upgrading kainji if possible, or try build a bigger hydro plant similar to that China own. Since these people wouldn't allow us use the gas which is the cheapest and simplest form of power generation.

Hydro is the cheapest

1 Like

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by Beremx(f): 7:51am On Jul 14, 2016
Highly applauding. I am impressed!
Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by plux4: 8:35am On Jul 14, 2016
“It was then discovered that there was a large piece of concrete measuring about 6 meters by 2 meters in the scroll case of the unit,” Sabotage...

4 Likes

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by ginajet(f): 8:37am On Jul 14, 2016
Really? Abeg what of Kanji Dam?
Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by acunon: 8:38am On Jul 14, 2016
They will keep on syphoning money for repairs of a damn dam but no light even if it's jst 20 mins a day. But let me ask,if all these dams produce electricity where do they supply them to?


Moon?

2 Likes

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by OnWebTech: 8:40am On Jul 14, 2016
“It is a project that has prospect of employment for skilled young Nigerians.”

Need logo design?
Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by M17CXi: 8:40am On Jul 14, 2016
Ooh pls shut up!!!!!!!!!! Enough fooling
Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by justicejay(m): 8:40am On Jul 14, 2016
All dis na paper work
Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by muller101(m): 8:41am On Jul 14, 2016
sarrki:
Pls start work on mambilla hydro 6000MW and live our oyel money people Nigeria is moving forward.
its leave not live.

3 Likes

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by Proffdada: 8:41am On Jul 14, 2016
undecided

1 Like

Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by meltiplexer: 8:41am On Jul 14, 2016
Beremx:
Highly applauding. I am impressed!


Don't be impressed yet,this is just mouth talk until we see it working. Naijabetman say so
Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by EvilSeeed: 8:43am On Jul 14, 2016
Finally!! Shiroro will be optimal again after god knows how many years.

I wonder when we will hear same new about Kainji and our refineries nationwide.
Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by raywan: 8:45am On Jul 14, 2016
Nice one.God bless nigeria
Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by dafuturis(m): 8:45am On Jul 14, 2016
Impressive
Re: Shiroro Power Plant To Operate At Full Capacity After N2.4bn Repairs by BE811APP: 8:45am On Jul 14, 2016
2.4bn shocked

(1) (2) (Reply)

Richest Tribes In Nigeria 2022 Forbes / Benue Govt Issues 14-day Quit Notice To Herders / How To Fight And End Corruption In Nigeria - Opinion

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)